Construction of two normal charging stations with two charging points each (á 22 kW) as public charging stations in Templin (Waldhof) (Q3302808)

From EU Knowledge Graph
Revision as of 19:07, 24 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3302808 in Germany
Language Label Description Also known as
English
Construction of two normal charging stations with two charging points each (á 22 kW) as public charging stations in Templin (Waldhof)
Project Q3302808 in Germany

    Statements

    0 references
    135.62 Euro
    0 references
    16,952.74 Euro
    0 references
    0.8 percent
    0 references
    1 May 2020
    0 references
    28 February 2021
    0 references
    Stephanus-Stiftung
    0 references

    53°7'9.66"N, 13°30'2.02"E
    0 references
    Templin, Stadt
    0 references

    Identifiers

    DE_TEMPORARY_5610
    0 references