Installation and operation of a high-speed charging station with 4 charging points for setting up a public charging infrastructure (Q3302788)

From EU Knowledge Graph
Revision as of 18:42, 24 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3302788 in Germany
Language Label Description Also known as
English
Installation and operation of a high-speed charging station with 4 charging points for setting up a public charging infrastructure
Project Q3302788 in Germany

    Statements

    0 references
    259.8 Euro
    0 references
    32,475.0 Euro
    0 references
    0.8 percent
    0 references
    6 May 2019
    0 references
    30 April 2021
    0 references
    Stadtwerke Pritzwalk GmbH
    0 references

    53°8'57.44"N, 12°10'34.28"E
    0 references
    Pritzwalk, Stadt
    0 references

    Identifiers

    DE_TEMPORARY_5590
    0 references