Agglomeration Podbrezová sewerage (Q3100613)

From EU Knowledge Graph
Revision as of 13:10, 15 September 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3100613 in Slovakia
Language Label Description Also known as
English
Agglomeration Podbrezová sewerage
Project Q3100613 in Slovakia

    Statements

    0 references
    4,719,530.63 Euro
    0 references
    5,552,388.98 Euro
    0 references
    0.85 percent
    0 references
    1 March 2017
    0 references
    1 April 2022
    0 references
    Stredoslovenská vodárenská spoločnos, a.s.
    0 references
    0 references

    48°43'27.16"N, 19°7'44.08"E
    0 references
    Ciežom projektu je zlepšenie odvádzania a čistenia komunálnych odpadových vôd v aglomerácii Podbrezová, v okrese Brezno, ktorá je zaradená v Prílohe č. 7 Výzvy a je v nesúlade s požiadavkami vyplývajúcimi zo smernice Rady 91/271/EHS. V aglomerácii bude riešená splašková kanalizácia a čistiareň odpadových vôd. Nedobudovaná kanalizačná sie a nedostatočné čistenie odpadových vôd ohrozuje povrchové i podzemné vody v povodí rieky Hron, ohrozuje kvalitu životného prostredia a životné podmienky obyvatežstva.Ciež projektu bude zabezpečený prostredníctvom 2 hlavných aktivít projektu:a) stoková sie ab) čistiareň odpadových vôd.V obci Podbrezová je kanalizácia vybudovaná čiastočne. Nakožko sa obec skladá z viacerých častí, ktoré tvoria samostatné celky a rozkladá sa v pomerne členitom území, nie je možné jej odkanalizovanie ako celku. V rámci hlavnej aktivity stoková sie bude vybudovaná splašková kanalizácia v časti Lopej, ktorá bude napojená na novovybudovanú ČOV Lopej, zároveň bude dobudovaná v miestnych častiach Skalica a Podbrezová (centrum) s napojením na existujúcu ČOV Skalica, ako aj v časti Štiavnička s napojením na existujúcu ČOV Štiavnička. Celková dĺžka stokovej siete v obci Podbrezová bude 17,772 km. Realizáciou hlavnej aktivity čistiareň odpadových vôd sa zabezpečí vybudovanie ČOV Lopej s kapacitou 800 EO.Celková dĺžka novovybudovaných kanalizačných sietí v projekte dosiahne 11,752 km a zvýšený počet obyvatežov so zlepšeným čistením komunálnych vôd bude 941 EO. (Slovak)
    0 references
    The objective of the project is to improve the collection and treatment of urban waste water in the Podbrezová agglomeration, in the district of Brezno, which is included in Annex 7 of the Challenges and is not in line with the requirements resulting from Council Directive 91/271/EEC. In the agglomeration will be solved sewage sewerage and sewage treatment plant. Incomplete sewerage network and insufficient waste water treatment threatens surface and groundwater in the river Hron river basin, threatens the quality of the environment and the living conditions of the population.Also the project will be ensured through 2 main project activities:a) sewer network ab) sewage treatment plant.In the village Podbrezová sewerage is built partially. The village consists of several parts, forming separate units and spreading in a fairly fragmented area, it is not possible to sewer it as a whole. As part of the main activity of the sewer network will be built sewage system in the part of Lopej, which will be connected to the newly built Lopej WWTP, at the same time it will be completed in local parts of Skalica and Podbrezová (centrum) with connection to the existing Skalica WWTP, as well as in the part of the tiavnička with connection to the existing WWTP tiavnička. The total length of the sewer network in the village Podbrezová will be 17,772 km. The implementation of the main activity of the wastewater treatment plant will ensure the construction of the Lopej WWTP with a capacity of 800 EO. The total length of the newly built sewerage networks in the project will reach 11.752 km and the increased number of inhabitants with improved urban water treatment will be 941 EO. (English)
    15 September 2021