Deep thermal modernisation of educational buildings in the village of Ochotnica Dolna (Q112235): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
label / enlabel / en
Deep thermal modernisation of educational buildings in the village of Ochotnica Dolna_2
Deep thermal modernisation of educational buildings in the village of Ochotnica Dolna

Revision as of 12:32, 29 October 2020

Project Q112235 in Poland
Language Label Description Also known as
English
Deep thermal modernisation of educational buildings in the village of Ochotnica Dolna
Project Q112235 in Poland

    Statements

    0 references
    383,501.98 zloty
    0 references
    92,040.48 Euro
    13 January 2020
    0 references
    639,170.03 zloty
    0 references
    153,400.81 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    11 May 2016
    0 references
    29 December 2017
    0 references
    GMINA OCHOTNICA DOLNA
    0 references
    Przedmiot projektu/inwestycji: Przedmiotem projektu jest termomodernizacja 2 jednostek oświatowych, zlokalizowanych w 2 budynkach. - SP i Gimnazjum Jana Pawła II w Ochotnicy Dolnej- montaż kotła na pellet o mocy 200kw wraz z robotami budowlanymi w pomieszczeniu kotłowni, montaż 2695 m izolowanych rurociągów zasilających,montaż 113 sztuk grzejników wraz z głowicami termostatycznymi i zaworami powrotnymi, docieplenie stropu nad poddaszem, częściowa wymiana stolarki okiennej 18 sztuk i drzwiowej 2,58 m2. - SP im. Ks. Twardowskiego w Tylmanowej - montaż kotła na pellet o mocy 150kw wraz z robotami budowlanymi w pomieszczeniu kotłowni , montaż 49 głowic termostatycznych i 40 zaworów powrotnych, docieplenie stropu , częściowa wymiana stolarki okiennej 1,83 m2 i drzwiowej 2,27 m2. W obu budynkach zostaną zastosowane indywidualne liczniki ciepła,ciepłej wody. Projekt został podzielony na 2 główne zadania rozdzielone nazwą dwóch budynków, w których będzie przebiegał proces termomodernizacji. Realizacja projektu przyczyni się do likwidacji niskiej emisji, co w gminach Małopolski ma bardzo istotne znaczenie. Na podstawie Metodyki sporządzania audytów energetycznych dla budynków podlegających głębokiej modernizacji energetycznej w ramach Regionalnego Programu Operacyjnego Województwa Małopolskiego na lata 2014 – 2020 oraz obliczania efektu ekologicznego obliczono podstawowe wskaźniki dotyczące redukcji emisji CO2, zmniejszenia zapotrzebowania na energię końcową i pierwotną dla budynków oraz redukcję emisji pyłów PM10 i PM2,5. Emisja CO2 zostanie zredukowana o 84,85%, pyłów PM10 i PM2,5 o odpowiednio 88,52% i 95,23%. O 39,17% ulegnie zmniejszeniu roczne zapotrzebowanie na energię końcową dla modernizowanych budynków. (Polish)
    0 references
    Subject matter of the project/investment: The subject of the project is the thermal modernisation of 2 educational units, located in 2 buildings. — John Paul II High School in Volunteer Lower – installation of a 200kw pellet boiler with construction works in the boiler room, installation of 2695 m of insulated supply pipelines, assembly of 113 units of radiators with thermostatic heads and return valves, warming of the ceiling over the attic, partial replacement of window joinery 18 pieces and doors 2.58 m². — SP im. Fr. Twardowski in Tylmanowa – installation of a 150kw pellet boiler with construction works in the boiler room, installation of 49 thermostatic heads and 40 return valves, ceiling warming, partial replacement of the window joinery 1.83 m² and 2.27 m² door. Individual heat meters, hot water meters will be used in both buildings. The project was divided into 2 main tasks separated by the name of two buildings, in which the thermo-modernisation process will take place. The implementation of the project will contribute to the elimination of low emissions, which is very important in the municipalities of Małopolska. On the basis of the methodology for the preparation of energy audits for buildings subject to deep energy modernisation under the Regional Operational Programme of the Małopolska Voivodship for the years 2014-2020 and the calculation of the ecological effect, basic indicators for reducing CO2 emissions, reduction of final and primary energy requirements for buildings and reduction of PM10 and PM2.5 emissions were calculated. CO2 emissions will be reduced by 84.85 %, PM10 and PM2.5 by 88.52 % and 95.23 % respectively. The annual final energy demand for modernised buildings will be reduced by 39.17 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0213/16
    0 references