Elimination of low emission of pollutants at Cieszyn Centre — phase I (Q123989): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The investment concerns the insulation of the building envelope and the decommissioning of existing heat sources (mainly kflon furnaces) for connection to a collective district heating network in five communal residential buildings, located in Cieszyn at: (a) ul. 20, (b) ul. Błocka 30B, (c) ul. Błocka 30C, (d) ul. Chrobre 3, (e) ul. The draft 16 for multi-family buildings with a total useful floor area of 2 582.94 m² leads to an optimisation o...)
(‎Created claim: summary (P836): The investment concerns the insulation of external partitions and the decommissioning of existing heat sources (mainly tile furnaces) for connection to the district heating network in five municipal residential buildings located in Cieszyn at: (a) ul. Bielska 20, (b) ul. Błogocka 30B, (c) ul. Błogocka 30C, (d) ul. Chrobrego 3, (e) ul. Przykopa 16 The project, concerning multi-family buildings with a total usable area of 2582.94 m², leads to opti...)
Property / summary
 
The investment concerns the insulation of external partitions and the decommissioning of existing heat sources (mainly tile furnaces) for connection to the district heating network in five municipal residential buildings located in Cieszyn at: (a) ul. Bielska 20, (b) ul. Błogocka 30B, (c) ul. Błogocka 30C, (d) ul. Chrobrego 3, (e) ul. Przykopa 16 The project, concerning multi-family buildings with a total usable area of 2582.94 m², leads to optimisation of energy consumption and contributes to reducing CO2 emissions, from 393.29 Mg/year to 124.28 Mg/year, i.e. by 269.01 Mg/year (68.40 %). (English)
Property / summary: The investment concerns the insulation of external partitions and the decommissioning of existing heat sources (mainly tile furnaces) for connection to the district heating network in five municipal residential buildings located in Cieszyn at: (a) ul. Bielska 20, (b) ul. Błogocka 30B, (c) ul. Błogocka 30C, (d) ul. Chrobrego 3, (e) ul. Przykopa 16 The project, concerning multi-family buildings with a total usable area of 2582.94 m², leads to optimisation of energy consumption and contributes to reducing CO2 emissions, from 393.29 Mg/year to 124.28 Mg/year, i.e. by 269.01 Mg/year (68.40 %). (English) / rank
 
Normal rank
Property / summary: The investment concerns the insulation of external partitions and the decommissioning of existing heat sources (mainly tile furnaces) for connection to the district heating network in five municipal residential buildings located in Cieszyn at: (a) ul. Bielska 20, (b) ul. Błogocka 30B, (c) ul. Błogocka 30C, (d) ul. Chrobrego 3, (e) ul. Przykopa 16 The project, concerning multi-family buildings with a total usable area of 2582.94 m², leads to optimisation of energy consumption and contributes to reducing CO2 emissions, from 393.29 Mg/year to 124.28 Mg/year, i.e. by 269.01 Mg/year (68.40 %). (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:12, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Elimination of low emission of pollutants at Cieszyn Centre — phase I
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    1,530,418.56 zloty
    0 references
    367,300.45 Euro
    13 January 2020
    0 references
    1,800,492.43 zloty
    0 references
    432,118.18 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 December 2015
    0 references
    30 September 2019
    0 references
    MIASTO CIESZYN
    0 references
    0 references

    49°45'20.5"N, 18°39'22.3"E
    0 references
    Inwestycja dotyczy izolacji przegród zewnętrznych oraz likwidacji istniejących źródeł ciepła (głównie pieców kaflowych) na rzecz podłączenia do zbiorczej sieci ciepłowniczej w pięciu komunalnych budynkach mieszkalnych, zlokalizowanych w Cieszynie przy: a) ul. Bielskiej 20, b) ul. Błogockiej 30B, c) ul. Błogockiej 30C, d) ul. Chrobrego 3, e) ul. Przykopa 16 Projekt, dotyczący budynków wielorodzinnych o łącznej powierzchni użytkowej 2 582,94 m2, prowadzi do optymalizacji zużycia energii i przyczynia się do redukcji emisji CO2, z poziomu 393,29 Mg/rok do poziomu 124,28 Mg/rok, tj. o 269,01 Mg/rok (68,40%). (Polish)
    0 references
    The investment concerns the insulation of external partitions and the decommissioning of existing heat sources (mainly tile furnaces) for connection to the district heating network in five municipal residential buildings located in Cieszyn at: (a) ul. Bielska 20, (b) ul. Błogocka 30B, (c) ul. Błogocka 30C, (d) ul. Chrobrego 3, (e) ul. Przykopa 16 The project, concerning multi-family buildings with a total usable area of 2582.94 m², leads to optimisation of energy consumption and contributes to reducing CO2 emissions, from 393.29 Mg/year to 124.28 Mg/year, i.e. by 269.01 Mg/year (68.40 %). (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.03.02-24-04A6/17
    0 references