Q98465 (Q98465): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The object of the planned project is the construction of a sewage treatment plant in Drzycim, on plot no. 268/1 in the Drzycim agglomeration designated by resolution No XII/280/15 of the Kujawsko-Pomorskie Voivodeship Sejm of 28 September 2015. The implementation of the project will contribute to increasing the proportion of the population using a sewage treatment system in accordance with the directive on municipal waste water, which is consist...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 23:41, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
3,124,547.49 zloty
0 references
3,675,938.23 zloty
0 references
85.0 percent
0 references
1 July 2020
0 references
31 December 2021
0 references
GMINA DRZYCIM
0 references
Przedmiotem planowanego przedsięwzięcia jest budowa oczyszczalni ścieków w Drzycimiu, na działce nr 268/1 w aglomeracji Drzycim wyznaczonej uchwałą nr XII/280/15 Sejmiku Województwa Kujawsko-Pomorskiego z dnia 28 września 2015 r. Realizacja projektu przyczyni się do zwiększenia odsetka ludności korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych, co jest spójne z celem działania 4.3 RPO WK-P na lata 2014-2020. Potrzeba realizacji inwestycji wynika ze znacznego wyeksploatowania obecnie funkcjonującej oczyszczalni ścieków zlokalizowanej w Drzycimiu przy ul. Młyńskiej, która zostanie zastąpiona nową oczyszczalnią. W ramach niniejszego wniosku projekt realizowany będzie w dwóch etapach (etap I - reaktor i budynek techniczny i wiata na osad odwodniony i po higienizacji - stan surowy otwarty; etap II - zakończenie całości wraz z uruchomieniem instalacji – oczyszczalni). W ramach projektu zostanie wybudowana 1 oczyszczalnia ścieków, która zastąpi dotychczasową oczyszczalnię ścieków w Drzycimiu. W rezultacie liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków wyniesie 1 571 RLM, w tym mieszkańcy podłączeni obecnie do sieci kanalizacyjnej, którą ścieki transportowane są do oczyszczalni w Drzycimiu (1335 RLM) oraz ścieki dowożone taborem asenizacyjnym od mieszkańców niekorzystających z sieci kanalizacyjnej (236 RLM). (Polish)
0 references
The object of the planned project is the construction of a sewage treatment plant in Drzycim, on plot no. 268/1 in the Drzycim agglomeration designated by resolution No XII/280/15 of the Kujawsko-Pomorskie Voivodeship Sejm of 28 September 2015. The implementation of the project will contribute to increasing the proportion of the population using a sewage treatment system in accordance with the directive on municipal waste water, which is consistent with the objective of action 4.3 of the WK-P OP for the years 2014-2020. The need to implement the investment results from significant exploitation of the current sewage treatment plant located in Drzycim at ul. Młyńska, which will be replaced by a new treatment plant. Under this proposal, the project will be implemented in two stages (Stage I – reactor and technical building and shelter for dehydrated sediment and after hygienic sediment – raw state open; stage II – completion of the whole with the start of the plant – treatment plant). As part of the project, 1 sewage treatment plant will be built to replace the existing sewage treatment plant in Drzycim. As a result, the number of additional persons benefiting from improved waste water treatment will amount to 1 571 RLM, including residents currently connected to the sewerage network, which is transported to the treatment plant in Drzycim (1335 RLM) and sewage delivered by tanking stock from residents not using sewage networks (236 RLM). (English)
15 October 2020
0 references
Identifiers
RPKP.04.03.00-04-0022/18
0 references