Expansion of rainwater and mites system from the town of Leszno (Q85060): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the development of a rainwater drainage system from the town of Leszno.The need for the project results from the rainwater and development programme for the city of Leszno.For the project, the following investment tasks will be carried out:1.Construction of a “east” storm water collecting system together with retention and infiltration tanks.The investment project consists of constructing a storm-water collecting system —...)
(‎Created claim: summary (P836): The project concerns the extension of the drainage system of rainwater and meltwater from the city of Leszno. The need for implementation of the project stems from the Programme for Waste Water Management and the Development of Rain Sewerage for the city of Leszno. The following investment tasks will be carried out within the scope of the project: 1. Construction of the “Eastern” rainwater manifold together with retency and infiltration tanks. T...)
Property / summary
 
The project concerns the extension of the drainage system of rainwater and meltwater from the city of Leszno. The need for implementation of the project stems from the Programme for Waste Water Management and the Development of Rain Sewerage for the city of Leszno. The following investment tasks will be carried out within the scope of the project: 1. Construction of the “Eastern” rainwater manifold together with retency and infiltration tanks. The investment task consists of the construction of a rainwater manifold – so-called. “Eastern” and two retency and infiltration tanks together with a water treatment plant for rainwater. The primary function of this task is to create a new receiver for rainwater drains from the northern and eastern parts of the city. 2. Expansion of the eastern rainwater manifold on the section from Rond Antonina to the PKP tracks. The scope of the task includes the extension of the rain drainage network – the “Eastern” manifold on the section from Rond Antonina to the railway tracks in the area of Kasztelańska and Rycerska Streets in Leszno. The investment area is designed to connect Al. The Constitution of May 3 from ul. Gronowska in Leszno. Ultimately, the rain collector will be used to drain the newly designed road connecting Al. The Constitution of May 3 from ul. Gronowska and will be burdened with the flow of rainwater from a part of the Gronowo settlement. 3. Construction of a storage tank at ul. The European Union in Leszno. The location of the reservoir on plot No 27/27 results from the findings of the “Programme for rainwater management and development of rainwater drainage for the city of Leszno”. The construction of a watertight reservoir with damped water drainage into the existing rainwater drainage system was adopted. (English)
Property / summary: The project concerns the extension of the drainage system of rainwater and meltwater from the city of Leszno. The need for implementation of the project stems from the Programme for Waste Water Management and the Development of Rain Sewerage for the city of Leszno. The following investment tasks will be carried out within the scope of the project: 1. Construction of the “Eastern” rainwater manifold together with retency and infiltration tanks. The investment task consists of the construction of a rainwater manifold – so-called. “Eastern” and two retency and infiltration tanks together with a water treatment plant for rainwater. The primary function of this task is to create a new receiver for rainwater drains from the northern and eastern parts of the city. 2. Expansion of the eastern rainwater manifold on the section from Rond Antonina to the PKP tracks. The scope of the task includes the extension of the rain drainage network – the “Eastern” manifold on the section from Rond Antonina to the railway tracks in the area of Kasztelańska and Rycerska Streets in Leszno. The investment area is designed to connect Al. The Constitution of May 3 from ul. Gronowska in Leszno. Ultimately, the rain collector will be used to drain the newly designed road connecting Al. The Constitution of May 3 from ul. Gronowska and will be burdened with the flow of rainwater from a part of the Gronowo settlement. 3. Construction of a storage tank at ul. The European Union in Leszno. The location of the reservoir on plot No 27/27 results from the findings of the “Programme for rainwater management and development of rainwater drainage for the city of Leszno”. The construction of a watertight reservoir with damped water drainage into the existing rainwater drainage system was adopted. (English) / rank
 
Normal rank
Property / summary: The project concerns the extension of the drainage system of rainwater and meltwater from the city of Leszno. The need for implementation of the project stems from the Programme for Waste Water Management and the Development of Rain Sewerage for the city of Leszno. The following investment tasks will be carried out within the scope of the project: 1. Construction of the “Eastern” rainwater manifold together with retency and infiltration tanks. The investment task consists of the construction of a rainwater manifold – so-called. “Eastern” and two retency and infiltration tanks together with a water treatment plant for rainwater. The primary function of this task is to create a new receiver for rainwater drains from the northern and eastern parts of the city. 2. Expansion of the eastern rainwater manifold on the section from Rond Antonina to the PKP tracks. The scope of the task includes the extension of the rain drainage network – the “Eastern” manifold on the section from Rond Antonina to the railway tracks in the area of Kasztelańska and Rycerska Streets in Leszno. The investment area is designed to connect Al. The Constitution of May 3 from ul. Gronowska in Leszno. Ultimately, the rain collector will be used to drain the newly designed road connecting Al. The Constitution of May 3 from ul. Gronowska and will be burdened with the flow of rainwater from a part of the Gronowo settlement. 3. Construction of a storage tank at ul. The European Union in Leszno. The location of the reservoir on plot No 27/27 results from the findings of the “Programme for rainwater management and development of rainwater drainage for the city of Leszno”. The construction of a watertight reservoir with damped water drainage into the existing rainwater drainage system was adopted. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:53, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Expansion of rainwater and mites system from the town of Leszno
Project in Poland financed by DG Regio

    Statements

    0 references
    20,960,792.97 zloty
    0 references
    5,030,590.31 Euro
    13 January 2020
    0 references
    24,659,756.44 zloty
    0 references
    5,918,341.55 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 August 2020
    0 references
    MIASTO LESZNO
    0 references
    0 references
    0 references
    Projekt dotyczy rozbudowy systemu odprowadzania wód opadowych i roztopowych z terenu miasta Leszna. Potrzeba realizacji projektu wynika z Programu Zagospodarowania Wód Opadowych i Rozwoju Kanalizacji Deszczowej dla miasta Leszna. W zakresie projektu wykonane zostaną następujące zadania inwestycyjne: 1. Budowa kolektora „wschodniego” kanalizacji deszczowej wraz ze zbiornikami retencyjno-infiltracyjnymi. Zadanie inwestycyjne polega na budowie kolektora kanalizacji deszczowej – tzw. „wschodniego” oraz dwóch zbiorników retencyjno-infiltracyjnych wraz z podczyszczalnią ścieków deszczowych. Podstawową funkcją tego zadania jest stworzenie nowego odbiornika dla odpływów wód opadowych z północnej i wschodniej części miasta. 2. Rozbudowa kolektora wschodniego kanalizacji deszczowej na odcinku od Ronda Antoniny do torów PKP. Zakres zadania obejmuje rozbudowę sieci kanalizacji deszczowej - kolektora „wschodniego” na odcinku od Ronda Antoniny do torów kolejowych w rejonie ulic Kasztelańskiej i Rycerskiej w Lesznie. Obszar objęty inwestycją docelowo przeznaczony jest pod projektowaną drogę łączącą Al. Konstytucji 3 Maja z ul. Gronowską w Lesznie. Docelowo kolektor deszczowy służyć będzie odwodnieniu nowoprojektowanej drogi łączącej Al. Konstytucji 3 Maja z ul. Gronowską oraz obciążony zostanie spływem wód deszczowych z części terenu osiedla Gronowo. 3. Budowa zbiornika retencyjnego przy ul. Unii Europejskiej w Lesznie. Lokalizacja zbiornika retencyjnego na działce nr 27/27 wynika z ustaleń „Programu zagospodarowania wód opadowych i rozwoju kanalizacji deszczowej dla miasta Leszna”. Przyjęto budowę szczelnego zbiornika retencyjnego z tłumionym odpływem wód do istniejącej sieci kanalizacji deszczowej. (Polish)
    0 references
    The project concerns the extension of the drainage system of rainwater and meltwater from the city of Leszno. The need for implementation of the project stems from the Programme for Waste Water Management and the Development of Rain Sewerage for the city of Leszno. The following investment tasks will be carried out within the scope of the project: 1. Construction of the “Eastern” rainwater manifold together with retency and infiltration tanks. The investment task consists of the construction of a rainwater manifold – so-called. “Eastern” and two retency and infiltration tanks together with a water treatment plant for rainwater. The primary function of this task is to create a new receiver for rainwater drains from the northern and eastern parts of the city. 2. Expansion of the eastern rainwater manifold on the section from Rond Antonina to the PKP tracks. The scope of the task includes the extension of the rain drainage network – the “Eastern” manifold on the section from Rond Antonina to the railway tracks in the area of Kasztelańska and Rycerska Streets in Leszno. The investment area is designed to connect Al. The Constitution of May 3 from ul. Gronowska in Leszno. Ultimately, the rain collector will be used to drain the newly designed road connecting Al. The Constitution of May 3 from ul. Gronowska and will be burdened with the flow of rainwater from a part of the Gronowo settlement. 3. Construction of a storage tank at ul. The European Union in Leszno. The location of the reservoir on plot No 27/27 results from the findings of the “Programme for rainwater management and development of rainwater drainage for the city of Leszno”. The construction of a watertight reservoir with damped water drainage into the existing rainwater drainage system was adopted. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.01.00-00-0009/18
    0 references