Development of provincial road No 188 Człuchów-Piła, m. Krajenka (Q135156): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 397,438.9416 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
397,438.94 Euro
| |||||||||||||||
Property / EU contribution: 397,438.94 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 397,438.94 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 397,438.94 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 14:14, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of provincial road No 188 Człuchów-Piła, m. Krajenka |
Project in Poland financed by DG Regio |
Statements
1,655,995.59 zloty
0 references
1,948,230.11 zloty
0 references
85.0 percent
0 references
22 August 2016
0 references
31 October 2017
0 references
SAMORZĄD WOJEWÓDZTWA WIELKOPOLSKIEGO
0 references
Przedmiotem projektu jest rozbudowa drogi wojewódzkiej nr 188 Człuchów – Piła na odcinku przejścia przez m. Krajenka od km 53+686-54+435. W chwili obecnej droga nr 188 na odcinku przejścia przez m. Krajenka od km 53+686-54+435 wykazuje znaczną degradację. Na drodze ruch drogowy wstrzymywany jest przez zatrzymujące się na jezdni autobusy. Nawierzchnia charakteryzuje się złym stanem technicznym – występują deformacje, wyboje, spękania podłużne i poprzeczne, liczne ubytki i łaty. Istniejące chodniki są również w złym stanie technicznym. Brak odpowiedniego systemu odwodnienia przyczynia się do pogarszania warunków bezpieczeństwa ruchu drogowego. Parametry drogi nie są przystosowane do skali prowadzonego oraz prognozowanego ruchu. Zakres inwestycji obejmuje:- wykonanie wzmocnienia istniejącej nawierzchni do nośności 115 kN/oś,- wykonanie nowej konstrukcji nawierzchni,- przebudowę i budowę zjazdów publicznych i indywidualnych,- przebudowę istniejących i budowę nowych zatok autobusowych,- przebudowę i budowę chodników w zakresie wynikającym z bezpiecznego kształtowania ruchu pieszego w obrębie drogi,- budowę ciągu pieszo-rowerowego,- korektę nienormatywnych parametrów technicznych (łuków poziomych i pionowych, pochyleń poprzecznych jezdni),- korektę niwelety drogi,- odtworzenie, oczyszczenie i profilowanie istniejących rowów, - budowę nowych rowów przydrożnych, - wykonanie urządzeń podczyszczających,- budowę lub rozbudowę kanalizacji deszczowej,- budowę urządzeń podczyszczających,- budowę i rozbudowę oświetlenia drogowego,- budowę sygnalizacji świetlnej,- likwidację kolizji z urządzeniami obcymi lub ich zabezpieczenie,- wycinkę drzew i krzewów kolidujących z projektowanymi elementami,- wykonanie oznakowania poziomego i pionowego.W wyniku zrealizowania inwestycji w roku 2016 przebudowanych zostanie 0,749 km drogi wojewódzkiej nr 188. (Polish)
0 references
The project is the extension of provincial road No 188 — Człuchów — Piła, from km 53 to km + 686-54 + 435. At the moment, road No 188 on the section’s transition from km 53 + 686-54 + 435 shows significant degradation. By road traffic is stopped by stopping at the carriageway of buses. The surface is characterised by poor technical condition: deformation, buckling, longitudinal and lateral cracking, multiple losses and patches. The existing pavements are also in poor technical condition. The absence of an appropriate drainage system contributes to the deterioration of road safety conditions. The road parameters are not adapted to the scale of the current and projected traffic. The scope of the investment includes: — implementation of reinforcement of the existing pavement up to the load capacity of 115 kN/axle, — construction of new pavement structure, — reconstruction and construction of new bus bays, — reconstruction and construction of new bus bays, — reconstruction and construction of pavements in relation to the safe formation of pedestrian footfall on the road, — construction of pedestrian crossings, — reconstruction, cleaning and profiling of existing ditches, construction of new roadside ditches, construction and extension of road lighting, — construction and extension of road lighting, — construction and extension of traffic lights, — felling of trees and bushes interfering with the design elements, — construction of horizontal and powered-lift markings, and construction of road traffic lights, — cutting of trees and bushes interfering with the proposed features, — construction of horizontal and powered-lift markings, and construction of road traffic lights, — cutting of trees and bushes interfering with the design, — construction of horizontal and powered-lift markings, and construction of road traffic lights, — the construction of horizontal and vertical signs of traffic, — the realisation of horizontal and vertical signs of road traffic, — the realisation of horizontal and vertical markings, 0.749 km of Provincial Road No 188 will be built. (English)
0 references
Identifiers
RPWP.05.01.01-30-0005/15
0 references