MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED PORT SYSTEM OF NAPOL’ A1 COMPLETION OF THE PORT SEWER SYSTEM (Q2023265): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Naples / rank | |||
Normal rank |
Revision as of 16:45, 15 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED PORT SYSTEM OF NAPOL’ A1 COMPLETION OF THE PORT SEWER SYSTEM |
Project in Italy financed by DG Regio |
Statements
16,500,000.0 Euro
0 references
22,000,000.0 Euro
0 references
75.0 percent
0 references
30 September 2014
0 references
30 March 2020
0 references
AUTORITA' DI SISTEMA PORTUALE DEL MAR TIRRENO CENTRALE
0 references
LA REALIZZAZIONE ED IL POTENZIAMENTO DELLE INFRASTRUTTURE DELLA RETE FOGNARIA Ê PARTE INTEGRANTE DELLA RIQUALIFICAZIONE AMBIENTALE DEL PORTO DI NAPOLI ED Ê UN ELEMENTO DI FONDAMENTALE IMPORTANZA PER L'ADEGUAMENTO ALLE VIGENTI NORMATIVE NAZIONALI E COMUNITARIE IN TEMA DI IMMISSIONI DI ACQUE IN MARE. LA NUOVA RETE FOGNARIA SARà DI TIPO SEPARATO, OVVERO COSTITUITA DA UNA RETE DI RACCOLTA DELLE ACQUE BIANCHE E DA UNA RETE PER LA RACCOLTA DELLE ACQUE NERE. LA NUOVA RETE DI ACQUE NERE PORTUALE SARà UBICATA LUNGO LE PRINCIPALI STRADE PORTUALI E SARà REALIZZATA IN DEPRESSIONE AL FINE DI LIMITARE LA PROFONDITà DEGLI SCAVI E GARANTIRE IL FUNZIONAMENTO IDRAULICO ANCHE IN ASSENZA DI SIGNIFICATIVI DISLIVELLI GEODETICI. LA RETE FOGNANTE ESISTENTE VERRà RICONVERTITA INTEGRALMENTE PER IL COLLETTAMENTO DELLE SOLE ACQUE METEORICHE PER LE QUALI Ê PREVISTO UN TRATTAMENTO DI DISOLEAZIONE ED UNA SUCCESSIVA FILTRAZIONE PRIMA DEL LORO SVERSAMENTO A MARE. (Italian)
0 references
THE CONSTRUCTION AND UPGRADING OF THE INFRASTRUCTURE OF THE SEWAGE SYSTEM IS AN INTEGRAL PART OF THE ENVIRONMENTAL REHABILITATION OF THE PORT OF NAPLES AND Ê AN ELEMENT OF CRUCIAL IMPORTANCE FOR THE ADAPTATION TO EXISTING NATIONAL AND COMMUNITY LEGISLATION ON DISCHARGES OF WATER INTO THE SEA. A SEPARATE WASTE WATER COLLECTION NETWORK AND A BLACK WATER COLLECTION NETWORK. THE NEW NETWORK OF BLACK PORT WATERS WILL BE LOCATED ALONG THE MAIN PORT ROADS AND WILL BE CARRIED OUT IN A VACUUM, IN ORDER TO LIMIT THE EXCAVATION PROCESS AND ENSURE THE HYDRAULIC FUNCTIONING EVEN IN THE ABSENCE OF SIGNIFICANT GEODETIC LEVELS. THE EXISTING SEWERAGE NETWORK IS CONVERTED ENTIRELY FOR THE COLLECTION OF RAINWATER ONLY IN RESPECT OF WHICH IT IS INTENDED THAT THE TREATMENT OF DE-OILING AND A SUBSEQUENT FILTRATION BEFORE IT IS DISCHARGED INTO THE SEA. (English)
0 references
Identifiers
I67D12000000006
0 references