Energy renovation of the ‘Siemczyno’ accommodation installation by the installation of heat pumps and micro-photovoltaic equipment. (Q137732): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 13:22, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of the ‘Siemczyno’ accommodation installation by the installation of heat pumps and micro-photovoltaic equipment.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,297,950.5 zloty
    0 references
    311,508.12 Euro
    13 January 2020
    0 references
    2,319,743.1 zloty
    0 references
    556,738.344 Euro
    13 January 2020
    0 references
    78.22 percent
    0 references
    21 August 2018
    0 references
    12 February 2019
    0 references
    PAŁAC SIEMCZYNO ADAM ANDZIAK
    0 references
    Przedmiotem projektu będzie modernizacja energetycznea obiektu noclegowego „Pałac Siemczyno” poprzez montaż nowego, odnawialnego źródła ciepła w technologii rewersyjnych, gruntowych pomp ciepła typu solanka/woda, o nominalnej mocy grzewczej 216 kW na potrzeby C.O. i C.W.U. wraz z instalacją C.O., z aktywnym systemem 7 / 33 Wydruk kontrolny, suma kontrolna: 8a277f6b54 dystrybucji ciepła za pośrednictwem klimakonwektorów w układzie dwururowym w całym obiekcie i instalacją C.W.U. w kotłowni obiektu oraz montaż odnawialnego źródła energii elektrycznej opartego na technologii fotowoltaicznej o nominalnej mocy elektrycznej 39,78 kW. Wykonanie projektu obejmuje zrealizowanie następujących prac: I. Roboty instalacyjno-montażowe – system ogrzewania I.1. Wykonanie pionowego wymiennika gruntowego (dolnego źródło ciepła). I.2. Wykonanie kotłowni. I.3. Wykonanie instalacji dystrybucji ciepła w obiekcie. I.4. Wykonanie instalacji elektrycznej na potrzeby urządzeń C.O. i C.W.U. w budynku. II. Roboty instalacyjno-montażowe - instalacja fotowoltaiczna II.1. Montaż konstrukcji montażowej. II.2. Montaż modułów fotowoltaicznych. II.3. Montaż inwerterów ( falowniki) II.4. Wykonanie dedykowanej instalacji elektrycznej. Za realizację projektu odpowiadać będzie wnioskodawca, który zlecać będzie wykonawstwo poszczególnych elementów projektu wybranym w podstępowaniach ofertowych firmom zewnętrznym. Projekt jest stacjonarny gdyż dotyczy istniejącego obiektu noclegowego. Powstałą infrastrukturą zarządzać będzie i eksploatować będzie wnioskodawca w ramach prowadzonej działalności gospodarczej (usługi turystyczne). Bezpośrednio po realizacji projektu możliwe będzie pełne wykorzystanie funkcjonalności powstałej infrastruktury. (Polish)
    0 references
    The project will be the subject of a project for the modernisation of energy. the ‘Palace of Sierczyno’ accommodation, by the installation of a new renewable heat source in reverse technology, the ground heat pumps of the brine/water type with a rated thermal input of 216 kW for C.O. and service water. with the active system 7/33. the control printing, the control sum: 8a277f6b54 heat distribution through air conditioners in a two-pipe system for the entire facility and installation of hot service water. in boiler space and assembly of a renewable photovoltaic electricity source with a rated electrical power output of 39.78 kW. The execution of the project involves carrying out the following works: Installation and installation work — heating system I.1. Construction of a vertical replacement for land (lower heat generator). I.2. Construction of boiler rooms. I.3. Installation of heat distribution facilities in the facility. I.4. Installation of electrical installations for the purposes of equipment C.O. and service water. II. Installation and installation work — photovoltaic installation II.1. Mounting of assembly structure. II.2. Installation of solar modules. II.3. Assembly of inverters and II.4. Installation of a dedicated electrical installation. The project will be carried out by the applicant, who will subcontract the different elements of the project chosen in the bid rigging to the external companies. The project is stationary because it concerns an existing accommodation site. The resulting infrastructure will be managed and operated by the applicant in the course of its economic activities (travel services). Immediately after the implementation of the project, it will be possible to make full use of the functionality of the infrastructure created. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B020/17
    0 references