Development of the banks of the Maroni – Phase 2 (Q4296528): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: summary (P836): Il s’agit de mettre en place des infrastructures adéquates pour la mise en service du nouveau bac sur le Maroni, et de désenclaver le territoire et de permettre le rapprochement des deux territoires (Suriname et Guyane) via le renforcement de l’offre et de la qualité des transports. DESCRIPTION DU PROJET: En Guyane : 1. Création et installation de 4 Ducs d’Albe d’accostage et d’amarrage. 2. Création d’un ensemble d’amarrage : constitué de point...) |
(Created claim: summary (P836): The aim is to put in place adequate infrastructure for the commissioning of the new ferry on the Maroni, and to open up the territory and allow the rapprochement of the two territories (Suriname and Guyana) by strengthening the offer and the quality of transport. PROJECT DESCRIPTION: In French Guiana: 1. Creation and installation of 4 dolphins for docking and mooring. 2. Creation of a mooring system: made up of mooring points on dolphins and bol...) |
||
Property / summary | |||
The aim is to put in place adequate infrastructure for the commissioning of the new ferry on the Maroni, and to open up the territory and allow the rapprochement of the two territories (Suriname and Guyana) by strengthening the offer and the quality of transport. PROJECT DESCRIPTION: In French Guiana: 1. Creation and installation of 4 dolphins for docking and mooring. 2. Creation of a mooring system: made up of mooring points on dolphins and bollards at the top of the ramp. 3. Realization of a concrete ramp: ramp consisting of a slab carried on form in materials insensitive to water built under a cofferdam; based on a network of vertical pile supports. In addition, a transition slab will be implemented at the interface between the new structure and the port median under construction. (English) | |||
Property / summary: The aim is to put in place adequate infrastructure for the commissioning of the new ferry on the Maroni, and to open up the territory and allow the rapprochement of the two territories (Suriname and Guyana) by strengthening the offer and the quality of transport. PROJECT DESCRIPTION: In French Guiana: 1. Creation and installation of 4 dolphins for docking and mooring. 2. Creation of a mooring system: made up of mooring points on dolphins and bollards at the top of the ramp. 3. Realization of a concrete ramp: ramp consisting of a slab carried on form in materials insensitive to water built under a cofferdam; based on a network of vertical pile supports. In addition, a transition slab will be implemented at the interface between the new structure and the port median under construction. (English) / rank | |||
Normal rank |
Revision as of 14:14, 20 June 2022
Project Q4296528 in Guyana
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of the banks of the Maroni – Phase 2 |
Project Q4296528 in Guyana |
Statements
2,250,000.0 Euro
0 references
3,000,000.0 Euro
0 references
75.0 percent
0 references
1 March 2019
0 references
CCOG-Communauté de communes de l’Ouest guyanais
0 references
Il s’agit de mettre en place des infrastructures adéquates pour la mise en service du nouveau bac sur le Maroni, et de désenclaver le territoire et de permettre le rapprochement des deux territoires (Suriname et Guyane) via le renforcement de l’offre et de la qualité des transports. DESCRIPTION DU PROJET: En Guyane : 1. Création et installation de 4 Ducs d’Albe d’accostage et d’amarrage. 2. Création d’un ensemble d’amarrage : constitué de point d’amarrage sur ducs d’Albe et de bollards en sommet de rampe. 3. Réalisation d’une rampe bétonnée : rampe constituée d’une dalle portée sur forme en matériaux insensibles à l’eau construite sous batardeau ; fondée sur un réseau d’appuis par pieux verticaux. Par ailleurs, une dalle de transition sera mise en oeuvre à l’interface entre le nouvel ouvrage et le terre-plein portuaire en construction. (French)
0 references
The aim is to put in place adequate infrastructure for the commissioning of the new ferry on the Maroni, and to open up the territory and allow the rapprochement of the two territories (Suriname and Guyana) by strengthening the offer and the quality of transport. PROJECT DESCRIPTION: In French Guiana: 1. Creation and installation of 4 dolphins for docking and mooring. 2. Creation of a mooring system: made up of mooring points on dolphins and bollards at the top of the ramp. 3. Realization of a concrete ramp: ramp consisting of a slab carried on form in materials insensitive to water built under a cofferdam; based on a network of vertical pile supports. In addition, a transition slab will be implemented at the interface between the new structure and the port median under construction. (English)
0 references