Prevent the risk of flooding and coastal erosion in Ogre city territory by rebuilding the old defensive dam and constructing a new protective stone (straumvirze) at the mouth of the river Ogre in Daugava (Q3057354): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Het doel van het project is om de stad Ogre aan te passen aan de klimaatverandering, het hoge risico op overstromingen te verminderen en een leefomgeving van hoge kwaliteit voor de bevolking te waarborgen, evenals het concurrentievermogen en het voortbestaan van economische activiteiten door overstromingsmaatregelen uit te voeren. De doelgroep van het project is de gemeente, stadsbewoners en kooplieden die worden getroffen door het risico op ove...) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Prevenire il rischio di inondazioni e di erosione costiera nella città di Ogre ricostruendo la vecchia diga protettiva e costruendo un nuovo polo protettivo (straumvirze) alla foce del fiume Ogre a Daugava | |||||||||||||||
Property / summary | |||||||||||||||
L'obiettivo del progetto è quello di adattare la città di Ogre ai cambiamenti climatici, riducendo l'elevato rischio di inondazioni e garantendo un ambiente di vita di alta qualità per la popolazione, nonché la competitività e la continua esistenza di attività economiche attraverso l'attuazione di misure alluvionali. Il gruppo target del progetto è il comune, i residenti e i commercianti colpiti dal rischio di alluvioni e erosione costiera, nonché le loro conseguenze. L'attuazione del progetto impedirà la fuoriuscita dei sistemi fognari e l'inquinamento nelle acque sotterranee e fluviali, nonché minacce alle infrastrutture di comunicazione, prevenendo così rischi di inquinamento ambientale e minacce alla salute di 11.744 abitanti.Attività del progetto:- sviluppo di calcoli idrologici e idraulici, modello matematico idrologico, nonché preparazione di specifiche tecniche per lo sviluppo di un progetto di costruzione, nonché la supervisione dello sviluppo del progetto di costruzione.- Sviluppo di un progetto edilizio-costruzionale -effettuerà lo sviluppo di un progetto di costruzione per la costruzione di un'opera di costruzione di circa 50.000 opere di costruzione e di realizzazione di altri progetti di costruzione. (Italian) | |||||||||||||||
Property / summary: L'obiettivo del progetto è quello di adattare la città di Ogre ai cambiamenti climatici, riducendo l'elevato rischio di inondazioni e garantendo un ambiente di vita di alta qualità per la popolazione, nonché la competitività e la continua esistenza di attività economiche attraverso l'attuazione di misure alluvionali. Il gruppo target del progetto è il comune, i residenti e i commercianti colpiti dal rischio di alluvioni e erosione costiera, nonché le loro conseguenze. L'attuazione del progetto impedirà la fuoriuscita dei sistemi fognari e l'inquinamento nelle acque sotterranee e fluviali, nonché minacce alle infrastrutture di comunicazione, prevenendo così rischi di inquinamento ambientale e minacce alla salute di 11.744 abitanti.Attività del progetto:- sviluppo di calcoli idrologici e idraulici, modello matematico idrologico, nonché preparazione di specifiche tecniche per lo sviluppo di un progetto di costruzione, nonché la supervisione dello sviluppo del progetto di costruzione.- Sviluppo di un progetto edilizio-costruzionale -effettuerà lo sviluppo di un progetto di costruzione per la costruzione di un'opera di costruzione di circa 50.000 opere di costruzione e di realizzazione di altri progetti di costruzione. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'obiettivo del progetto è quello di adattare la città di Ogre ai cambiamenti climatici, riducendo l'elevato rischio di inondazioni e garantendo un ambiente di vita di alta qualità per la popolazione, nonché la competitività e la continua esistenza di attività economiche attraverso l'attuazione di misure alluvionali. Il gruppo target del progetto è il comune, i residenti e i commercianti colpiti dal rischio di alluvioni e erosione costiera, nonché le loro conseguenze. L'attuazione del progetto impedirà la fuoriuscita dei sistemi fognari e l'inquinamento nelle acque sotterranee e fluviali, nonché minacce alle infrastrutture di comunicazione, prevenendo così rischi di inquinamento ambientale e minacce alla salute di 11.744 abitanti.Attività del progetto:- sviluppo di calcoli idrologici e idraulici, modello matematico idrologico, nonché preparazione di specifiche tecniche per lo sviluppo di un progetto di costruzione, nonché la supervisione dello sviluppo del progetto di costruzione.- Sviluppo di un progetto edilizio-costruzionale -effettuerà lo sviluppo di un progetto di costruzione per la costruzione di un'opera di costruzione di circa 50.000 opere di costruzione e di realizzazione di altri progetti di costruzione. (Italian) / qualifier | |||||||||||||||
point in time: 11 January 2022
|
Revision as of 10:19, 11 January 2022
Project Q3057354 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Prevent the risk of flooding and coastal erosion in Ogre city territory by rebuilding the old defensive dam and constructing a new protective stone (straumvirze) at the mouth of the river Ogre in Daugava |
Project Q3057354 in Latvia |
Statements
3,570,000.0 Euro
0 references
4,200,000.0 Euro
0 references
85.0 percent
0 references
31 July 2017
0 references
30 January 2022
0 references
Ogres novada pašvaldība
0 references
Projekta mērķis ir Ogres pilsētas pielāgošana klimata pārmaiņām, samazinot augstu plūdu risku, un nodrošinot iedzīvotājiem kvalitatīvu dzīves vidi, kā arī saimnieciskās darbības konkurētspēju un turpmāku pastāvēšanu, veicot pretplūdu pasākumus.Projekta mērķa grupa ir pašvaldība, pilsētas iedzīvotāji un komersanti, kurus ietekmē plūdu un krasta eroziju risks, kā arī to sekas. Projekta īstenošana novērsīs kanalizācijas sistēmu pārplūšanu un piesārņojuma nokļūšanu gruntsūdeņos un upē, kā arī apdraudējumi komunikāciju infrastruktūrai, tādējādi novēršot vides piesārņojuma riskus un draudus 11 744 iedzīvotāju veselībai.Projekta darbības:- Hidroloģisko un hidraulisko aprēķinu, hidroloģiskā matemātiskā modeļa izstrāde, kā arī būvprojekta izstrādes un būvdarbu tehnisko specifikāciju sagatavošana, kā arī būvprojekta izstrādes uzraudzība.- Būvprojekta izstrāde – veiks būvprojekta izstrādi aizsargdambja un aizsargmola (straumvirzes) izbūvei ar papildus pretplūdu pasākumu veikšanu.- Būvniecība:a) vecā Ogres upes aizsargdambja pārbūve posmā no Brīvības ielas 60 līdz Brīvības ielai 80, Ogres pilsētā, nostiprinot nogāzes, izbūvējot drenāžas sistēmas, kā arī veicot labiekārtošanas darbus;b) jauna aizsargmola (straumvirzes) būvniecība pie Ogres ietekas Daugavā, Ogres pilsētā, veicot papildus pretplūdu pasākumus.- Būvuzraudzība – līgums ar atbilstoši sertificētu izpildītāju, lai būvdarbi atbilstu visiem kvalitātes un būvdarbu normatīvu prasībām.- Autoruzraudzība – veiks būvprojektu izstrādātājs, lai būvdarbi notiktu saskaņā ar būvprojektu.- Publicitātes pasākumu nodrošināšana – veikti obligātie informatīvie un publicitātes pasākumi ievērojot vadlīnijas par ES Struktūrfondu projektu publicitāti.Projekta īstenošanas laiks pēc līguma noslēgšanas ir 54 mēneši un kopējais attiecināmās izmaksas ir 4 200 000,00 EUR, no kuriem ERAF finansējums ir 3 570 000,00 EUR un valsts budžeta dotācija pašvaldībai 157 500,00 EUR. (Latvian)
0 references
The aim of the project is to adapt Ogre city to climate change by reducing high flood risk and to ensure high quality living environment, as well as competitiveness of economic activity and continued existence by carrying out flooding measures.The target group of the project is local government, inhabitants of the city and merchants, who are affected by flood and coastal erosion risk, as well as their consequences. Project implementation will prevent overflow of sewerage systems and pollution into groundwater and river, as well as threats to communication infrastructure, thus eliminating the risks of environmental pollution and threats to the health of 11 744 inhabitants.Project activities:- development of hydrological and hydraulic calculation, development of hydrological mathematical model, as well as the preparation of the construction design and construction works in the public works.The planning of the construction project is to be carried out in accordance with the requirements of the construction project. (English)
15 July 2021
0 references
L’objectif du projet est d’adapter la ville d’Ogre au changement climatique, de réduire le risque élevé d’inondation et d’assurer un environnement de vie de qualité à la population, ainsi que la compétitivité et le maintien des activités économiques par la mise en œuvre de mesures d’inondation. Le groupe cible du projet est la municipalité, les citadins et les commerçants touchés par les risques d’inondation et d’érosion côtière, ainsi que leurs conséquences. La mise en œuvre du projet permettra d’éviter les fuites de systèmes d’assainissement et de pollution dans les eaux souterraines et fluviales, ainsi que les menaces pour les infrastructures de communication, empêchant ainsi les risques de pollution de l’environnement et les menaces pour la santé de 11 744 habitants. Activités de projet:- développement de calculs hydrologiques et hydrauliques, modèle hydrologique, ainsi que la préparation des spécifications techniques pour le développement d’un projet de construction, ainsi que la supervision du développement de la conception de construction.- Développement d’une conception de construction — EUR- s’effectuera pour la construction d’un barrage de protection et les mesures de protection de l’ensemble des projets sont conformes à la règle de la protection de l’environnement et de la protection des projets. (French)
25 November 2021
0 references
Ziel des Projekts ist die Anpassung der Stadt Ogre an den Klimawandel, die Verringerung des hohen Hochwasserrisikos und die Sicherung eines hochwertigen Lebensumfelds für die Bevölkerung sowie die Wettbewerbsfähigkeit und das Fortbestehen wirtschaftlicher Aktivitäten durch die Umsetzung von Hochwassermaßnahmen. Ziel des Projekts ist die Gemeinde, Stadtbewohner und Händler, die von Hochwasser- und Küstenerosion betroffen sind, sowie deren Folgen. Die Durchführung des Projekts verhindert das Auslaufen von Kanalisationssystemen und die Verschmutzung in Grundwasser und Fluss, sowie Gefahren für die Kommunikationsinfrastruktur, wodurch Risiken von Umweltverschmutzung und Gesundheitsbedrohungen von 11 744 Einwohnern verhindert werden.Projektaktivitäten:- Entwicklung von hydrologischen und hydraulischen Berechnungen, hydrologisches mathematisches Modell, sowie Erstellung von technischen Spezifikationen für die Entwicklung einer Baukonstruktion und Schutzmast (Gleichbau) sowie Überwachung der Entwicklung der Bauplanung. (German)
28 November 2021
0 references
Het doel van het project is om de stad Ogre aan te passen aan de klimaatverandering, het hoge risico op overstromingen te verminderen en een leefomgeving van hoge kwaliteit voor de bevolking te waarborgen, evenals het concurrentievermogen en het voortbestaan van economische activiteiten door overstromingsmaatregelen uit te voeren. De doelgroep van het project is de gemeente, stadsbewoners en kooplieden die worden getroffen door het risico op overstroming en kusterosie, evenals de gevolgen daarvan. De uitvoering van het project zal lekkage van rioleringssystemen en vervuiling in grondwater en rivieren voorkomen, evenals bedreigingen voor de communicatie-infrastructuur, waardoor risico’s van milieuvervuiling en bedreigingen voor de gezondheid van 11 744 inwoners worden voorkomen.Projectactiviteiten:- ontwikkeling van hydrologische en hydraulische berekeningen, hydrologische wiskundige model, voorbereiding van technische specificaties voor de ontwikkeling van een constructieontwerp, evenals toezicht op de ontwikkeling van het bouwontwerp.- Ontwikkeling van een constructieontwerp — zal de ontwikkeling van een constructieontwerp voor de bouw van een beschermende dam en beschermende pool (streaming) uitvoeren met extra reconstructie van de oude Ogre rivier beschermende dam in het deel van Brivibas straat 60 tot Brivibas Street 80, in de stad Ogre, door het versterken van hellingen, het bouwen van drainagesystemen, evenals het uitvoeren van verbeteringswerkzaamheden;b) de bouw van een nieuwe beschermende pool (straatrichting) bij de monding van Ogre in Daugava, Ogre stad, het nemen van extra anti-overstroming maatregelen.- Bouwtoezicht — een contract met een naar behoren gecertificeerde performer, om ervoor te zorgen dat bouwwerken voldoen aan alle eisen van kwaliteit en bouwvoorschriften.- Auteurstoezicht — zal worden uitgevoerd door de ontwikkelaar van bouwprojecten, zodat de bouwwerkzaamheden worden uitgevoerd in overeenstemming met het ontwerp van de bouw.- Het verstrekken van publiciteitsmaatregelen — verplichte voorlichtings- en publiciteitsmaatregelen zijn uitgevoerd in overeenstemming met de richtlijnen inzake publiciteit van projecten van de structuurfondsen van de EU. De projectuitvoeringsperiode na het sluiten van het contract bedraagt 54 maanden en de totale subsidiabele kosten bedragen 4 200 000,00 EUR, waarvan de EFRO-financiering 3 570 000,00 EUR bedraagt en de overheidssubsidie aan de gemeente 157 500,00 EUR. (Dutch)
28 November 2021
0 references
L'obiettivo del progetto è quello di adattare la città di Ogre ai cambiamenti climatici, riducendo l'elevato rischio di inondazioni e garantendo un ambiente di vita di alta qualità per la popolazione, nonché la competitività e la continua esistenza di attività economiche attraverso l'attuazione di misure alluvionali. Il gruppo target del progetto è il comune, i residenti e i commercianti colpiti dal rischio di alluvioni e erosione costiera, nonché le loro conseguenze. L'attuazione del progetto impedirà la fuoriuscita dei sistemi fognari e l'inquinamento nelle acque sotterranee e fluviali, nonché minacce alle infrastrutture di comunicazione, prevenendo così rischi di inquinamento ambientale e minacce alla salute di 11.744 abitanti.Attività del progetto:- sviluppo di calcoli idrologici e idraulici, modello matematico idrologico, nonché preparazione di specifiche tecniche per lo sviluppo di un progetto di costruzione, nonché la supervisione dello sviluppo del progetto di costruzione.- Sviluppo di un progetto edilizio-costruzionale -effettuerà lo sviluppo di un progetto di costruzione per la costruzione di un'opera di costruzione di circa 50.000 opere di costruzione e di realizzazione di altri progetti di costruzione. (Italian)
11 January 2022
0 references
Ogre, Ogres nov.
0 references
Ogre, Ogres nov.
0 references
Identifiers
5.1.1.0/17/I/001
0 references