Extension of a permanent establishment (Q3313012): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Extension d’un établissement stable | |||||||||||||||
Property / summary | |||||||||||||||
Extension du bâtiment de production et installation d’autres lignes de production et redéfinition de la logistique interne. (French) | |||||||||||||||
Property / summary: Extension du bâtiment de production et installation d’autres lignes de production et redéfinition de la logistique interne. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Extension du bâtiment de production et installation d’autres lignes de production et redéfinition de la logistique interne. (French) / qualifier | |||||||||||||||
point in time: 6 December 2021
|
Revision as of 16:32, 6 December 2021
Project Q3313012 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of a permanent establishment |
Project Q3313012 in Germany |
Statements
775,473.1 Euro
0 references
3,047,045.59 Euro
0 references
25.45 percent
0 references
25 July 2016
0 references
30 June 2019
0 references
Schäfer Trennwandsysteme GmbH
0 references
56593
0 references
Erweiterung des Produktionsgebäudes und Installation weiterer Produktionslinien sowie Neukonzeptionierung der innerbetrieblichen Logistik. (German)
0 references
Expansion of the production building and installation of further production lines as well as redesign of in-house logistics. (English)
25 October 2021
0 references
Extension du bâtiment de production et installation d’autres lignes de production et redéfinition de la logistique interne. (French)
6 December 2021
0 references
Altenkirchen (Westerwald)
0 references
Identifiers
DE_TEMPORARY_15799
0 references