“Renewal and implementation of energy efficiency measures in the building of the District Office”Fire Safety and Protection of the Population“Zlatograd” (Q3885231): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts: Adding en translations) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
41°22'51.28"N, 25°5'42.00"E
| |||||||||||
Property / coordinate location: 41°22'51.28"N, 25°5'42.00"E / rank | |||||||||||
Normal rank |
Revision as of 16:24, 3 December 2021
Project Q3885231 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | “Renewal and implementation of energy efficiency measures in the building of the District Office”Fire Safety and Protection of the Population“Zlatograd” |
Project Q3885231 in Bulgaria |
Statements
247,579.33 Bulgarian lev
0 references
291,269.8 Bulgarian lev
0 references
0.85 percent
0 references
1 September 2016
0 references
29 March 2018
0 references
0 references
Проектното предложение е насочено към повишаване на енергийната ефективност на публична сграда на държавната администрация в град Златоград. В сградата се помещава Районна служба "Пожарна безопасност и защита на населението". Построена е през 1981 година и е на два етажа с частичен висок сутерен, изба и подпокривно пространство, конструкцията е масивна, със застроена площ от 345 кв.м. В сградата не се извършва стопанска дейност. От построяването на сградата не е правен ремонт или обновяване, въпреки че функционира 7 дни в седмицата, по 24 часа на ден. Сградата е избрана за интервенция, защото е една от административните сгради в града с най-нисък енергиен клас и същевременно най-голям потенциал за енергийни спестявания и на територията на града няма друга сграда с по-големи нужди от обновяване. Видно от изготвените доклади, сградата има нужда от въвеждане на мерки за повишаване на енергийната ефективност за достигане на по-високия енергиен клас "В" и минимум 60% енергийни спестявания и извършване на мерки за конструктивно укрепване, които да гарантират удължаването на жизнения й цикъл. Към настоящия момент сградата е с установен дефект в конструкцията, в резултат на който са се образували пукнатини. Поради това е необходимо да се предприемат мерки за възстановяване, усилване и осигуряване на цялата сграда, съгласно действащите нормативни актове в проектирането и строителството. Мерките, които трябва да се изпълнят за повишаване на енергийната ефективност на сградата и достигане на енергиен клас "B" са: изолация на стени, под и покрив, смяна на дограма и подмяна на осветителната уредба. Партньор на Община Златоград в настоящото проектно предложение за обновяване на сградата на РСПБЗН в град Златоград е Главна дирекция "Пожарна безопасност и защита на населението" към Министерство на вътрешните работи, която се явява второстепенен разпоредител с бюджетни средства. (Bulgarian)
0 references
The project proposal is aimed at improving the energy efficiency of a public building of the state administration in Zlatograd. The building houses the District Office “Fire Safety and Protection of the Population”. It was built in 1981 and is on two floors with a partial high basement, cellar and under-roof space, the construction is massive, with built-up area of 345 sq.m. In the building there is no economic activity. No renovation or renovation has been made since the construction of the building, although it operates 7 days a week, 24 hours a day. The building was selected for intervention because it is one of the administrative buildings in the city with the lowest energy class and at the same time the highest potential for energy savings and there is no other building with higher renovation needs on the territory of the city. According to the reports drawn up, the building needs to introduce energy efficiency improvement measures to achieve the higher energy class “B” and at least 60 % energy savings and implement constructive reinforcement measures to ensure that its life cycle is extended. At present, the building has a defect in the structure, resulting in cracks. It is therefore necessary to take measures to restore, strengthen and secure the entire building, in accordance with the regulations in force in design and construction. The measures to be implemented to improve the energy efficiency of the building and to reach the energy class B are: insulation of walls, floor and roof, replacement of windows and replacement of the lighting system. Partner of Zlatograd Municipality in this project proposal for renovation of the RSPBZN building in the town of Zlatograd is the General Directorate “Fire Safety and Population Protection” at the Ministry of the Interior, which is a secondary authorising officer. (English)
2 December 2021
0 references
Златоград
0 references
Identifiers
BG16RFOP001-2.001-0064
0 references