“Integrated project for tourism development and improvement of cultural and historical infrastructure in Sliven Municipality” (Q3887571): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
“Integrated project for tourism development and improvement of cultural and historical infrastructure in Sliven Municipality”
Property / summary
 
In implementation of the policy for the conservation, promotion and development of cultural heritage, the present project proposal for a comprehensive integrated tourism product includes eligible measures and activities for objects-immovable cultural goods with category “national importance” (State Twisted Factory/The Prison/First Bulgarian Textile Factory; House Museums: Hadji Dimitar, Dobri Chintulov, Sliven bit) and for other cultural and tourist sites (Design between three sites with category “national importance” — Houses museums of Dobri Chintulov, Sliven bit and State twisted factory/The Prison/First Bulgarian textile factory; Sliven-Karandila Road Cableway; Tourist Cultural and Information Centre (TCIC). construction, including of buildings and yards/adjoining spaces; for restoration of the authentic historical appearance by refurbishment of street and pavement pavements in front of and around the three sites with category “national importance”; for the construction of a tourist cultural and information center in the building of the Municipality of Sliven; to improve the conditions of the Sliven-Karandila Road Cableway. For the sites there is a supply of equipment, furniture and equipment necessary for the performance of their activities and functions, as well as the realisation of various digitisation activities. Within the envisaged scope, this project will increase and achieve a stable positive growth of tourism in the Municipality of Sliven. The project aims to build on a project successfully implemented in the last programming period: “Travel through time, in time and time-integrated project for the development of natural, cultural and historical attractions and tourist infrastructure in Sliven”. (English)
Property / summary: In implementation of the policy for the conservation, promotion and development of cultural heritage, the present project proposal for a comprehensive integrated tourism product includes eligible measures and activities for objects-immovable cultural goods with category “national importance” (State Twisted Factory/The Prison/First Bulgarian Textile Factory; House Museums: Hadji Dimitar, Dobri Chintulov, Sliven bit) and for other cultural and tourist sites (Design between three sites with category “national importance” — Houses museums of Dobri Chintulov, Sliven bit and State twisted factory/The Prison/First Bulgarian textile factory; Sliven-Karandila Road Cableway; Tourist Cultural and Information Centre (TCIC). construction, including of buildings and yards/adjoining spaces; for restoration of the authentic historical appearance by refurbishment of street and pavement pavements in front of and around the three sites with category “national importance”; for the construction of a tourist cultural and information center in the building of the Municipality of Sliven; to improve the conditions of the Sliven-Karandila Road Cableway. For the sites there is a supply of equipment, furniture and equipment necessary for the performance of their activities and functions, as well as the realisation of various digitisation activities. Within the envisaged scope, this project will increase and achieve a stable positive growth of tourism in the Municipality of Sliven. The project aims to build on a project successfully implemented in the last programming period: “Travel through time, in time and time-integrated project for the development of natural, cultural and historical attractions and tourist infrastructure in Sliven”. (English) / rank
 
Normal rank
Property / summary: In implementation of the policy for the conservation, promotion and development of cultural heritage, the present project proposal for a comprehensive integrated tourism product includes eligible measures and activities for objects-immovable cultural goods with category “national importance” (State Twisted Factory/The Prison/First Bulgarian Textile Factory; House Museums: Hadji Dimitar, Dobri Chintulov, Sliven bit) and for other cultural and tourist sites (Design between three sites with category “national importance” — Houses museums of Dobri Chintulov, Sliven bit and State twisted factory/The Prison/First Bulgarian textile factory; Sliven-Karandila Road Cableway; Tourist Cultural and Information Centre (TCIC). construction, including of buildings and yards/adjoining spaces; for restoration of the authentic historical appearance by refurbishment of street and pavement pavements in front of and around the three sites with category “national importance”; for the construction of a tourist cultural and information center in the building of the Municipality of Sliven; to improve the conditions of the Sliven-Karandila Road Cableway. For the sites there is a supply of equipment, furniture and equipment necessary for the performance of their activities and functions, as well as the realisation of various digitisation activities. Within the envisaged scope, this project will increase and achieve a stable positive growth of tourism in the Municipality of Sliven. The project aims to build on a project successfully implemented in the last programming period: “Travel through time, in time and time-integrated project for the development of natural, cultural and historical attractions and tourist infrastructure in Sliven”. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:51, 2 December 2021

Project Q3887571 in Bulgaria
Language Label Description Also known as
English
“Integrated project for tourism development and improvement of cultural and historical infrastructure in Sliven Municipality”
Project Q3887571 in Bulgaria

    Statements

    0 references
    4,310,639.85 Bulgarian lev
    0 references
    2,198,426.32 Euro
    1 December 2021
    0 references
    5,071,341.0 Bulgarian lev
    0 references
    2,586,383.91 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    26 November 2020
    0 references
    26 November 2022
    0 references
    0 references
    В изпълнение на политиката за опазване,популяризиране и развитие на културното наследство,настоящото проектно предложение за цялостен интегриран туристически продукт включва допустими мерки и дейности за обекти-недвижими културни ценности с категория „национално значение“(Държавна сукнена фабрика/Затворът/Първа българска текстилна фабрика;къщи музеи:Хаджи Димитър,Добри Чинтулов,Сливенския бит) и за др.културни и туристически обекти(Благоустрояване между три обекта с категория„национално значение“- Къщи музеи на Добри Чинтулов, Сливенски бит и Държавна сукнена фабрика/Затворът/Първа бълграска текстилна фабрика;Пътническа въжена линия Сливен-Карандила;Туристически културно-информационен център(ТКИЦ).Предвидени са дейности за физическо обновяване на обектите чрез строително-монтажни работи,консервационно-реставрационни работи,благоустрояване,в т.ч на сгради и дворове/прилежащи пространства;за възстановяване на автентичния исторически облик чрез благоустрояване на улични и тротоарни настилки пред и около трите обекта с категория„национално значение“;за изграждане на Туристически културно-информационен център в сградата на Община Сливен; за подобряване условията на Пътническата въжена линия Сливен-Карандила.За обектите е предвидена доставка на необходимо за осъществяване на дейността и функциите им оборудване, обзавеждане и техника,както и реализация на различни дейности по дигитализация.В предвидения обхват,настоящият проект ще повиши и постигане стабилен положителен ръст на туризма в Община Сливен. Проектът цели да надгради успешно реализиран през миналия програмен период проект:„Пътуване през времето,във времето и с времето-интегриран проект за развитие на природни,културни и исторически атракции и туристическа инфраструктура в Сливен“. (Bulgarian)
    0 references
    In implementation of the policy for the conservation, promotion and development of cultural heritage, the present project proposal for a comprehensive integrated tourism product includes eligible measures and activities for objects-immovable cultural goods with category “national importance” (State Twisted Factory/The Prison/First Bulgarian Textile Factory; House Museums: Hadji Dimitar, Dobri Chintulov, Sliven bit) and for other cultural and tourist sites (Design between three sites with category “national importance” — Houses museums of Dobri Chintulov, Sliven bit and State twisted factory/The Prison/First Bulgarian textile factory; Sliven-Karandila Road Cableway; Tourist Cultural and Information Centre (TCIC). construction, including of buildings and yards/adjoining spaces; for restoration of the authentic historical appearance by refurbishment of street and pavement pavements in front of and around the three sites with category “national importance”; for the construction of a tourist cultural and information center in the building of the Municipality of Sliven; to improve the conditions of the Sliven-Karandila Road Cableway. For the sites there is a supply of equipment, furniture and equipment necessary for the performance of their activities and functions, as well as the realisation of various digitisation activities. Within the envisaged scope, this project will increase and achieve a stable positive growth of tourism in the Municipality of Sliven. The project aims to build on a project successfully implemented in the last programming period: “Travel through time, in time and time-integrated project for the development of natural, cultural and historical attractions and tourist infrastructure in Sliven”. (English)
    2 December 2021
    0 references
    Сливен
    0 references

    Identifiers

    BG16RFOP001-6.002-0015
    0 references