Renewable energy sources — construction of a photovoltaic installation for the Urban Hospital in Ruda Śląska Sp. z o.o. (Q123702): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project consists of the construction of a photovoltaic installation which will enable the production of electricity from the renewable energy source, i.e. the sun and at the same time the CO2 emissions reduction of 53,527 tCO2/rok and PM10 by 0.00139155 t/year for the two locations of the Urban Hospital in Ruda Śląska sp. z o.o. The composition of the photovoltaic installation consists of 258 solar modules with a combined output of 67,08 kWp...) |
||
Property / summary | |||
The project consists of the construction of a photovoltaic installation which will enable the production of electricity from the renewable energy source, i.e. the sun and at the same time the CO2 emissions reduction of 53,527 tCO2/rok and PM10 by 0.00139155 t/year for the two locations of the Urban Hospital in Ruda Śląska sp. z o.o. The composition of the photovoltaic installation consists of 258 solar modules with a combined output of 67,08 kWp. In the unit at ul. The th century of Lip 2 stands at 36,4 kWp in the unit at ul. The main 11 in Bielszowice is 30,68 kWp. The installation will be connected to the existing electrical installation in the Municipal Hospital in Ruda Śląska Sp. z o.o., and the electricity produced will be used for the hospital’s own hospital. (English) | |||
Property / summary: The project consists of the construction of a photovoltaic installation which will enable the production of electricity from the renewable energy source, i.e. the sun and at the same time the CO2 emissions reduction of 53,527 tCO2/rok and PM10 by 0.00139155 t/year for the two locations of the Urban Hospital in Ruda Śląska sp. z o.o. The composition of the photovoltaic installation consists of 258 solar modules with a combined output of 67,08 kWp. In the unit at ul. The th century of Lip 2 stands at 36,4 kWp in the unit at ul. The main 11 in Bielszowice is 30,68 kWp. The installation will be connected to the existing electrical installation in the Municipal Hospital in Ruda Śląska Sp. z o.o., and the electricity produced will be used for the hospital’s own hospital. (English) / rank | |||
Normal rank |
Revision as of 10:02, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewable energy sources — construction of a photovoltaic installation for the Urban Hospital in Ruda Śląska Sp. z o.o. |
Project in Poland financed by DG Regio |
Statements
393,153.11 zloty
0 references
463,399.56 zloty
0 references
85.0 percent
0 references
21 May 2018
0 references
31 December 2018
0 references
SZPITAL MIEJSKI W RUDZIE ŚLĄSKIEJ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt polega na budowie instalacji fotowoltaicznej, która umożliwi wytwarzanie energii elektrycznej z odnawialnego źródła energii tj. słońca a jednocześnie redukcję emisji CO2 o 53,527 tCO2/rok oraz PM10 o 0,00139155 t/rok dla dwóch lokalizacji Szpitala Miejskiego w Rudzie Śląskiej sp. z o.o. W skład instalacji fotowoltaicznej wchodzi 258 modułów fotowoltaicznych o łącznej mocy 67,08 kWp. W jednostce przy ul. W. Lipa 2 w Goduli wynosi 36,4 kWp, w jednostce przy ul. Głównej 11 w Bielszowicach wynosi 30,68 kWp. Instalacja podłączona zostanie do istniejącej instalacji elektrycznej w budynkach Szpitala Miejskiego w Rudzie Śląskiej Sp. z o.o., a wyprodukowana energia elektryczna wykorzystywana będzie na potrzeby własne Szpitala. (Polish)
0 references
The project consists of the construction of a photovoltaic installation which will enable the production of electricity from the renewable energy source, i.e. the sun and at the same time the CO2 emissions reduction of 53,527 tCO2/rok and PM10 by 0.00139155 t/year for the two locations of the Urban Hospital in Ruda Śląska sp. z o.o. The composition of the photovoltaic installation consists of 258 solar modules with a combined output of 67,08 kWp. In the unit at ul. The th century of Lip 2 stands at 36,4 kWp in the unit at ul. The main 11 in Bielszowice is 30,68 kWp. The installation will be connected to the existing electrical installation in the Municipal Hospital in Ruda Śląska Sp. z o.o., and the electricity produced will be used for the hospital’s own hospital. (English)
0 references
Identifiers
RPSL.04.01.01-24-036G/17
0 references