DEVELOPMENT OF PROVINCIAL ROAD 473 IN THE TRANSITION BY UNIEJÓW — AND STEP (Q101703): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for professional or recreational pur...)
Property / summary
 
The project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for professional or recreational purposes and for persons coming from outside the region for the purpose of tourism, health care in a spa town of a spa or business. Road users are also road transport operators, professional drivers, entrepreneurs, travellers arriving to Uniejski DW 473. The scope of the investment includes the extension of the distance from km 473 + 700,00 to km 31 + 908,40 in the Uniejów section from km 31 + to km +. (0.2 km product), i.e. extension of the intersection with district and municipal routes. Terms of reference: road extension (rb); extension of junction (rb); development of district road (rb nk), reconstruction of the municipal road (rb nk), demolition and construction of pavements, demolition and construction of crossings (rb), demolition and construction of storm water drainage (rb); construction of power supply and duct for traffic lights (rb), demolition and road lighting construction (loop); upgrading of networks: electricity, telecommunications, demolition of dwellings, construction of plaque/commemorative plaques — external company. Investor supervision, settlement and monitoring of project implementation will be ensured by the employees of the ZDDS. The author’s supervision — an external company Designate the parameters of DV No 473 and of the services provided as part of the project, are described in the feasibility study. (English)
Property / summary: The project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for professional or recreational purposes and for persons coming from outside the region for the purpose of tourism, health care in a spa town of a spa or business. Road users are also road transport operators, professional drivers, entrepreneurs, travellers arriving to Uniejski DW 473. The scope of the investment includes the extension of the distance from km 473 + 700,00 to km 31 + 908,40 in the Uniejów section from km 31 + to km +. (0.2 km product), i.e. extension of the intersection with district and municipal routes. Terms of reference: road extension (rb); extension of junction (rb); development of district road (rb nk), reconstruction of the municipal road (rb nk), demolition and construction of pavements, demolition and construction of crossings (rb), demolition and construction of storm water drainage (rb); construction of power supply and duct for traffic lights (rb), demolition and road lighting construction (loop); upgrading of networks: electricity, telecommunications, demolition of dwellings, construction of plaque/commemorative plaques — external company. Investor supervision, settlement and monitoring of project implementation will be ensured by the employees of the ZDDS. The author’s supervision — an external company Designate the parameters of DV No 473 and of the services provided as part of the project, are described in the feasibility study. (English) / rank
 
Normal rank

Revision as of 09:11, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
DEVELOPMENT OF PROVINCIAL ROAD 473 IN THE TRANSITION BY UNIEJÓW — AND STEP
Project in Poland financed by DG Regio

    Statements

    0 references
    2,025,810.66 zloty
    0 references
    486,194.5584 Euro
    13 January 2020
    0 references
    2,626,416.53 zloty
    0 references
    630,339.9672 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 November 2017
    0 references
    31 December 2018
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references

    51°58'26.8"N, 18°47'35.5"E
    0 references
    Realizacja projektu wynika z potrzeby zwiększenia dostępności transportowej województwa łódzkiego w ruchu drogowym. Celem realizacji inwestycji jest: poprawa warunków technicznych, przepustowości i bezpieczeństwa ruchu kołowego (tranzytowego i lokalnego) i pieszego, dostosowanie nośności drogi do wymagań obowiązujących przepisów oraz poprawa warunków ekologicznych. Realizacja inwestycji służyć będzie zarówno mieszkańcom, którzy w celach zawodowych lub rekreacyjnych korzystają z niej, jak i osobom, przybywającym spoza regionu w celach turystycznych, zdrowotnych do miejscowości uzdrowiskowej Uniejów bądź biznesowych. Użytkownikami drogi są także przewoźnicy, kierowcy zawodowi, przedsiębiorcy, turyści przyjeżdżający do Uniejowa korzystających z DW 473. Zakres inwestycji obejmuje rozbudowę DW 473 w Uniejowie na odcinku od km 31+700,00 do km 31+908,40.(0,2 km produkt) tj. rozbudowę skrzyżowania z drogą powiatową i drogą gminną. Zakres zadania: rozbudowa drogi (rb);rozbudowa skrzyżowania (rb); rozbudowa drogi powiatowej(rb nk), przebudowa drogi gminnej(rb nk), rozbiórka i budowa chodników, rozbiórka i budowa zjazdów (rb), rozbiórka i budowa kanalizacji deszczowej (rb); budowa zasilania i kanalizacji kablowej dla sygnalizacji świetlnej (rb), rozbiórka i budowa oświetlenia drogowego (prz.inf.); przebudowę sieci: elektroenergetycznej, teletechnicznej, rozbiórkę budynku mieszkalnego (prz.inf.), wykonanie tablic informacyjno/pamiątkowych - firma zewnętrzna. Nadzór inwestorski, rozliczanie i monitorowanie wdrażania projektu zapewnią pracownicy ZDW. Nadzór autorski – firma zewnętrzna Projektowane parametry DW Nr 473 oraz usługi realizowane w ramach projektu zostały opisane w studium wykonalności. (Polish)
    0 references
    The project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for professional or recreational purposes and for persons coming from outside the region for the purpose of tourism, health care in a spa town of a spa or business. Road users are also road transport operators, professional drivers, entrepreneurs, travellers arriving to Uniejski DW 473. The scope of the investment includes the extension of the distance from km 473 + 700,00 to km 31 + 908,40 in the Uniejów section from km 31 + to km +. (0.2 km product), i.e. extension of the intersection with district and municipal routes. Terms of reference: road extension (rb); extension of junction (rb); development of district road (rb nk), reconstruction of the municipal road (rb nk), demolition and construction of pavements, demolition and construction of crossings (rb), demolition and construction of storm water drainage (rb); construction of power supply and duct for traffic lights (rb), demolition and road lighting construction (loop); upgrading of networks: electricity, telecommunications, demolition of dwellings, construction of plaque/commemorative plaques — external company. Investor supervision, settlement and monitoring of project implementation will be ensured by the employees of the ZDDS. The author’s supervision — an external company Designate the parameters of DV No 473 and of the services provided as part of the project, are described in the feasibility study. (English)
    0 references

    Identifiers

    RPLD.03.02.01-10-0009/17
    0 references