Q3309132 (Q3309132): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Created claim: summary (P836): Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English) | |||||||||||||||
Property / summary: Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English) / qualifier | |||||||||||||||
point in time: 24 October 2021
|
Revision as of 19:17, 24 October 2021
Project Q3309132 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3309132 in Germany |
Statements
733.33 Euro
0 references
122,222.06 Euro
0 references
0.6 percent
0 references
15 May 2017
0 references
31 December 2018
0 references
Stiftung Maribondo da Floresta
0 references
Errichtung einer schnell ladenden Stromtankstelle und fünf normal ladenden Wallboxen nebst Erweiterung einer bestehenden Photovoltaikanlage (German)
0 references
Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English)
24 October 2021
0 references
Osterholz
0 references
Identifiers
DE_TEMPORARY_11917
0 references