Dismantling of existing halls and construction of a new production hall with office buildings, storage and loading areas (Q3297228): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Property / coordinate location
 
48°16'59.88"N, 10°4'59.88"E
Latitude48.2833039
Longitude10.0832982
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 48°16'59.88"N, 10°4'59.88"E / rank
 
Normal rank

Revision as of 18:15, 24 October 2021

Project Q3297228 in Germany
Language Label Description Also known as
English
Dismantling of existing halls and construction of a new production hall with office buildings, storage and loading areas
Project Q3297228 in Germany

    Statements

    0 references
    200,000.0 Euro
    0 references
    400,000.0 Euro
    0 references
    50.0 percent
    0 references
    29 October 2020
    0 references
    28 October 2022
    0 references
    Beilharz GmbH & Co. KG
    0 references

    48°16'59.88"N, 10°4'59.88"E
    0 references
    Die Beilharz GmbH & Co. KG stellt Straßenausrüstung aller Art her - vom Leitpfosten, der Baustellen- und Verkehrsabsicherung bis hin zur Winterausrüstung. Durch den Einsatz einer elektrischen Doppelstation Hohlkörperblasanlage wird das Unternehmen in die Lage versetzt, handelsübliche Leitpfosten im 3-Schicht Verfahren herzustellen. Die mittlere Schicht, welche 60% des Endprodukts ausmacht, wird dabei aus recyceltem Kunststoff bestehen. Mit der Förderung wird der Rückbau bestehender Hallen und die Errichtung einer neuen Produktionshalle mit Bürogebäude, Lager- und Ladeflächen unterstützt. (German)
    0 references
    Beilharz GmbH & Co. KG manufactures all kinds of road equipment — from control posts, construction site and traffic safety to winter equipment. By using an electric double-station hollow-body blower system, the company is able to produce commercially available guide posts in the 3-layer process. The middle layer, which accounts for 60 % of the final product, will be made of recycled plastic. The support will support the dismantling of existing halls and the construction of a new production hall with office buildings, storage and loading areas. (English)
    24 October 2021
    0 references
    Vöhringen
    0 references

    Identifiers

    DE_TEMPORARY_7
    0 references