(Created claim: summary (P836): Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km....) |
||||||||||||||
Property / summary | |||||||||||||||
Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km. The total cost of the project is EUR 1286008.50 with VAT. It is planned that 208 inhabitants will be able to connect to the built sewage network, and 64 inhabitants of the water network. (English) | |||||||||||||||
Property / summary: Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km. The total cost of the project is EUR 1286008.50 with VAT. It is planned that 208 inhabitants will be able to connect to the built sewage network, and 64 inhabitants of the water network. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km. The total cost of the project is EUR 1286008.50 with VAT. It is planned that 208 inhabitants will be able to connect to the built sewage network, and 64 inhabitants of the water network. (English) / qualifier | |||||||||||||||
point in time: 15 July 2021
|
Revision as of 12:45, 15 July 2021
Project Q3057395 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3057395 in Latvia |
Statements
628,880.8 Euro
0 references
865,392.6 Euro
0 references
21 March 2018
0 references
31 December 2021
0 references
SIA "ZIEMEĻKURZEME"
0 references
Attīstīt un uzlabot ūdensapgādes un kanalizācijas sistēmas pakalpojumu kvalitāti un nodrošināt pieslēgšanas iespējas, vienlaikus uzlabojot vides kvalitāti un nodrošinot iedzīvotājus ar normatīvu prasībām atbilstošu dzeramo ūdeni. Galvenie pasākumi ir jaunu kanalizācijas tīklu izbūve 3,19 km, jauna kanalizācijas spiedvada izbūve 0.81 km izbūve, trīs jaunu kanalizācijas un jauna ūdensvada tīkla izbūvi 1,1 km garumā. Projekta plānotās kopējās izmaksas ir EUR 1286008.50 ar PVN. Plānots, ka izbūvētajam kanalizācijas tīklam varēs pieslēgties 208 iedzīvotāji, bet ūdensvada tīkla 64 iedzīvotāji. (Latvian)
0 references
Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km. The total cost of the project is EUR 1286008.50 with VAT. It is planned that 208 inhabitants will be able to connect to the built sewage network, and 64 inhabitants of the water network. (English)
15 July 2021
0 references
Dundaga, Dundagas pag., Talsu nov.
0 references
Jaundundaga, Dundagas pag., Talsu nov.
0 references
Identifiers
5.3.1.0/17/I/028
0 references