Q2982593 (Q2982593): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão., translated_summary)
Property / summary
 
With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão. (English)
Property / summary: With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão. (English) / rank
 
Normal rank
Property / summary: With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:01, 9 July 2021

Project Q2982593 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982593 in Portugal

    Statements

    0 references
    33,848.69 Euro
    0 references
    85.0 percent
    0 references
    1 November 2017
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE VILA FLOR
    0 references
    0 references

    41°15'5.72"N, 7°12'43.88"W
    0 references
    Com esta operação pretende-se dotar a ETAR existente de uma obra de entrada que garanta a eficiência dos equipamentos a jusante, de modo a ser assegurado o tratamento satisfatório das águas residuais urbanas de 100 habitantes da localidade de Mourão, na União das freguesias de Valtorno e Mourão. (Portuguese)
    0 references
    With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão. (English)
    9 July 2021
    0 references
    Vila Flor, União das freguesias de Valtorno e Mourão
    0 references

    Identifiers

    POSEUR-03-2012-FC-000852
    0 references