Chancellery/Pedrógão Sanitation Subsystem (Q2982013): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Removed claim: summary (P836): This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies., remove_old_english_translation) |
||||||||||||||
Property / summary | |||||||||||||||
Property / summary: This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies. (English) / rank | |||||||||||||||
Property / summary: This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies. (English) / qualifier | |||||||||||||||
|
Revision as of 01:51, 9 July 2021
Project Q2982013 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Chancellery/Pedrógão Sanitation Subsystem |
Project Q2982013 in Portugal |
Statements
3,625,539.12 Euro
0 references
85.0 percent
0 references
1 January 2016
0 references
31 December 2021
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
A presente operação prevê a construção de uma ETAR e respetivas infraestruturas de ligação com as redes já existentes e sem tratamento no subsistema, assim como a construção/ampliação de redes para aumentar a cobertura, garantindo um adequado tratamento dos efluentes recolhidos e contribuindo para a melhoria da qualidade das massas de água. (Portuguese)
0 references
Torres Novas
0 references
Identifiers
POSEUR-03-2012-FC-000034
0 references