(‎Created claim: summary (P836): The subject of the project, which is comprehensive thermomodernisation, was described in detail in energy audits carried out in accordance with Annex 10 Methodology.... Their activities aim at adapting the heat transfer coefficients of the partitions to the requirements of technical conditions 2021, thereby ensuring that the energy efficiency of buildings is improved, the indicators of which are: saving of final energy: 49,4; reducing greenhouse...)
Property / summary
 
The subject of the project, which is comprehensive thermomodernisation, was described in detail in energy audits carried out in accordance with Annex 10 Methodology.... Their activities aim at adapting the heat transfer coefficients of the partitions to the requirements of technical conditions 2021, thereby ensuring that the energy efficiency of buildings is improved, the indicators of which are: saving of final energy: 49,4; reducing greenhouse gas emissions 45,9; reduction of PM10 emissions 51.3 and PM2 51.3. During the implementation of the project, the applicant shall ensure that all necessary elements of the works are carried out to the highest possible standard and in accordance with the applicable standards. Similarly, all building materials used to carry out individual tasks will have the required certificates, technical approvals and certificates. In addition, all products and equipment to the required extent will bear the CE mark for compliance with the essential requirements of the directives on these products.The project covers the thermomodernisation of three buildings managed by the Applicant, i.e. Public Primary School in Wola Dębińska, Municipal Office of Dębno and Public Kindergarten in Łoniowa. Depending on the needs of the facilities, modernisation of the heating system, replacement of the heat source for hot water, replacement of light sources with LED, replacement of windows and external doors and warming of external walls, roof and ceiling will be provided.In the project for all the above mentioned buildings, devices used to settle heat individual heat meters, hot water located at the heat source in the boiler room will be mandatory. In addition, radiator thermostats will be installed next to each of the radiators being replaced to ensure that the set temperature in the rooms is maintained as a result of audits. (English)
Property / summary: The subject of the project, which is comprehensive thermomodernisation, was described in detail in energy audits carried out in accordance with Annex 10 Methodology.... Their activities aim at adapting the heat transfer coefficients of the partitions to the requirements of technical conditions 2021, thereby ensuring that the energy efficiency of buildings is improved, the indicators of which are: saving of final energy: 49,4; reducing greenhouse gas emissions 45,9; reduction of PM10 emissions 51.3 and PM2 51.3. During the implementation of the project, the applicant shall ensure that all necessary elements of the works are carried out to the highest possible standard and in accordance with the applicable standards. Similarly, all building materials used to carry out individual tasks will have the required certificates, technical approvals and certificates. In addition, all products and equipment to the required extent will bear the CE mark for compliance with the essential requirements of the directives on these products.The project covers the thermomodernisation of three buildings managed by the Applicant, i.e. Public Primary School in Wola Dębińska, Municipal Office of Dębno and Public Kindergarten in Łoniowa. Depending on the needs of the facilities, modernisation of the heating system, replacement of the heat source for hot water, replacement of light sources with LED, replacement of windows and external doors and warming of external walls, roof and ceiling will be provided.In the project for all the above mentioned buildings, devices used to settle heat individual heat meters, hot water located at the heat source in the boiler room will be mandatory. In addition, radiator thermostats will be installed next to each of the radiators being replaced to ensure that the set temperature in the rooms is maintained as a result of audits. (English) / rank
 
Normal rank
Property / summary: The subject of the project, which is comprehensive thermomodernisation, was described in detail in energy audits carried out in accordance with Annex 10 Methodology.... Their activities aim at adapting the heat transfer coefficients of the partitions to the requirements of technical conditions 2021, thereby ensuring that the energy efficiency of buildings is improved, the indicators of which are: saving of final energy: 49,4; reducing greenhouse gas emissions 45,9; reduction of PM10 emissions 51.3 and PM2 51.3. During the implementation of the project, the applicant shall ensure that all necessary elements of the works are carried out to the highest possible standard and in accordance with the applicable standards. Similarly, all building materials used to carry out individual tasks will have the required certificates, technical approvals and certificates. In addition, all products and equipment to the required extent will bear the CE mark for compliance with the essential requirements of the directives on these products.The project covers the thermomodernisation of three buildings managed by the Applicant, i.e. Public Primary School in Wola Dębińska, Municipal Office of Dębno and Public Kindergarten in Łoniowa. Depending on the needs of the facilities, modernisation of the heating system, replacement of the heat source for hot water, replacement of light sources with LED, replacement of windows and external doors and warming of external walls, roof and ceiling will be provided.In the project for all the above mentioned buildings, devices used to settle heat individual heat meters, hot water located at the heat source in the boiler room will be mandatory. In addition, radiator thermostats will be installed next to each of the radiators being replaced to ensure that the set temperature in the rooms is maintained as a result of audits. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:34, 7 July 2021

Project Q2708778 in Poland
Language Label Description Also known as
English
No label defined
Project Q2708778 in Poland

    Statements

    0 references
    1,687,109.29 zloty
    0 references
    375,044.4 Euro
    0.2223 Euro
    0 references
    2,811,848.89 zloty
    0 references
    625,074.01 Euro
    0.2223 Euro
    0 references
    60.0 percent
    0 references
    5 December 2019
    0 references
    31 December 2022
    0 references
    GMINA DĘBNO
    0 references
    0 references

    49°57'34.9"N, 20°43'2.3"E
    0 references
    Przedmiot przedsięwzięcia, którym jest kompleksowa termomodernizacja został szczegółowo opisany w audytach energetycznych wykonanych zgodnie z załącznikiem nr 10 Metodyka .... Działania w nich zamieszczone mają na celu dostosowanie współczynników przenikania ciepła przegród do wymagań warunków technicznych 2021, gwarantując tym samym poprawę efektywności energetycznej budynków, której wskaźnikami są: oszczędność energii końcowej: 49,4; ograniczenie emisji gazów cieplarnianych 45,9; obniżenie emisji pyłów PM10 51,3 oraz PM2 51,3. Wnioskodawca zapewni w trakcie realizacji przedsięwzięcia, aby wszystkie niezbędne elementy prac były wykonane z najwyższą możliwą do uzyskania w danych warunkach standardzie i zgodnie z obowiązującymi normami. Podobnie wszystkie materiały budowlane wykorzystane w celu realizacji poszczególnych zadań będą posiadały wymagane atesty, aprobaty techniczne i certyfikaty. Ponadto, wszystkie produkty i urządzenia w wymaganym zakresie opatrzone będą znakiem CE na zgodność z zasadniczymi wymaganiami zawartymi w dyrektywach dotyczących tych produktów.Projekt obejmuje swoim zakresem termomodernizację trzech budynków zarządzanych przez Wnioskodawcę tj. Publiczną Szkołę Podstawową w Woli Dębińskiej, Urząd Gminy Dębno oraz Publiczne Przedszkole w Łoniowej. W zależności od potrzeb obiektów przewidziano m.in. modernizację systemu grzewczego, wymianę źródła ciepła dla c.w.u., wymianę źródeł światła na LED, wymianę okien i drzwi zewnętrznych oraz ocieplenie ścian zewnętrznych, dachu i stropu.W projekcie dla wszystkich wyżej wymienionych budynków zainstalowane, będą obowiązkowe urządzenia służące do rozliczania ciepła indywidualne liczniki ciepła, ciepłej wody zlokalizowane przy źródle ciepła w kotłowni. Dodatkowo zainstalowane będą termostaty grzejnikowe przy każdym z wymienianych grzejników, aby zapewnić utrzymanie zadanej temperatury w pomieszczeniach co wynika z audytów. (Polish)
    0 references
    The subject of the project, which is comprehensive thermomodernisation, was described in detail in energy audits carried out in accordance with Annex 10 Methodology.... Their activities aim at adapting the heat transfer coefficients of the partitions to the requirements of technical conditions 2021, thereby ensuring that the energy efficiency of buildings is improved, the indicators of which are: saving of final energy: 49,4; reducing greenhouse gas emissions 45,9; reduction of PM10 emissions 51.3 and PM2 51.3. During the implementation of the project, the applicant shall ensure that all necessary elements of the works are carried out to the highest possible standard and in accordance with the applicable standards. Similarly, all building materials used to carry out individual tasks will have the required certificates, technical approvals and certificates. In addition, all products and equipment to the required extent will bear the CE mark for compliance with the essential requirements of the directives on these products.The project covers the thermomodernisation of three buildings managed by the Applicant, i.e. Public Primary School in Wola Dębińska, Municipal Office of Dębno and Public Kindergarten in Łoniowa. Depending on the needs of the facilities, modernisation of the heating system, replacement of the heat source for hot water, replacement of light sources with LED, replacement of windows and external doors and warming of external walls, roof and ceiling will be provided.In the project for all the above mentioned buildings, devices used to settle heat individual heat meters, hot water located at the heat source in the boiler room will be mandatory. In addition, radiator thermostats will be installed next to each of the radiators being replaced to ensure that the set temperature in the rooms is maintained as a result of audits. (English)
    7 July 2021
    0 references

    Identifiers

    RPMP.04.03.02-12-0033/20
    0 references