Q2699222 (Q2699222): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): As part of the project entitled “Construction of a water supply network with connections in Zlotniki” will be built a municipal water supply network for buildings located in compact buildings. The planned network will enable the transition of existing buildings to the new municipal water supply network powered by the water supply in Chevujewo. The integration of the planned network into the existing network will take place in the village of Groc...)
Property / summary
 
As part of the project entitled “Construction of a water supply network with connections in Zlotniki” will be built a municipal water supply network for buildings located in compact buildings. The planned network will enable the transition of existing buildings to the new municipal water supply network powered by the water supply in Chevujewo. The integration of the planned network into the existing network will take place in the village of Grochowiska Księże after the existing hydrant. As part of the project, a water supply network will be built with connections in Złotniki and a connection of existing networks in Chevujewo. The overall length of the designed main water supply network is L=5239.0 m i.e. PVC pipe? 160 mm length L = 2582.0 m, PVC pipes? 110 mm length L = 2086.0 m (including 411.0 m of tension of existing nets in Chevewo), PVC pipes? 90 mm long L = 571.0 m. The overall length of the water supply connections is L=388.0 m – 43 connections, including: PE pipes? 50 mm long L = 66.0 m, PE pipe? 40 mm long L = 98.0 m, PE pipe? 32 mm long L = 224,0 m, total L= 388.0 m. Connectors from the main network to the parcel boundary are L=241,0m. Connections from the border of the plot to the building together with the water meter set are L=174,0m. The total value of the project is PLN 2 372 756.83. As a result of the project, the number of additional people benefiting from the improved water supply will increase by 542 people, the length of the water supply network will be 5.24 km. (English)
Property / summary: As part of the project entitled “Construction of a water supply network with connections in Zlotniki” will be built a municipal water supply network for buildings located in compact buildings. The planned network will enable the transition of existing buildings to the new municipal water supply network powered by the water supply in Chevujewo. The integration of the planned network into the existing network will take place in the village of Grochowiska Księże after the existing hydrant. As part of the project, a water supply network will be built with connections in Złotniki and a connection of existing networks in Chevujewo. The overall length of the designed main water supply network is L=5239.0 m i.e. PVC pipe? 160 mm length L = 2582.0 m, PVC pipes? 110 mm length L = 2086.0 m (including 411.0 m of tension of existing nets in Chevewo), PVC pipes? 90 mm long L = 571.0 m. The overall length of the water supply connections is L=388.0 m – 43 connections, including: PE pipes? 50 mm long L = 66.0 m, PE pipe? 40 mm long L = 98.0 m, PE pipe? 32 mm long L = 224,0 m, total L= 388.0 m. Connectors from the main network to the parcel boundary are L=241,0m. Connections from the border of the plot to the building together with the water meter set are L=174,0m. The total value of the project is PLN 2 372 756.83. As a result of the project, the number of additional people benefiting from the improved water supply will increase by 542 people, the length of the water supply network will be 5.24 km. (English) / rank
 
Normal rank
Property / summary: As part of the project entitled “Construction of a water supply network with connections in Zlotniki” will be built a municipal water supply network for buildings located in compact buildings. The planned network will enable the transition of existing buildings to the new municipal water supply network powered by the water supply in Chevujewo. The integration of the planned network into the existing network will take place in the village of Grochowiska Księże after the existing hydrant. As part of the project, a water supply network will be built with connections in Złotniki and a connection of existing networks in Chevujewo. The overall length of the designed main water supply network is L=5239.0 m i.e. PVC pipe? 160 mm length L = 2582.0 m, PVC pipes? 110 mm length L = 2086.0 m (including 411.0 m of tension of existing nets in Chevewo), PVC pipes? 90 mm long L = 571.0 m. The overall length of the water supply connections is L=388.0 m – 43 connections, including: PE pipes? 50 mm long L = 66.0 m, PE pipe? 40 mm long L = 98.0 m, PE pipe? 32 mm long L = 224,0 m, total L= 388.0 m. Connectors from the main network to the parcel boundary are L=241,0m. Connections from the border of the plot to the building together with the water meter set are L=174,0m. The total value of the project is PLN 2 372 756.83. As a result of the project, the number of additional people benefiting from the improved water supply will increase by 542 people, the length of the water supply network will be 5.24 km. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:21, 7 July 2021

Project Q2699222 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699222 in Poland

    Statements

    0 references
    1,563,841.84 zloty
    0 references
    347,642.04 Euro
    0.2223 Euro
    0 references
    1,839,813.93 zloty
    0 references
    408,990.64 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    30 April 2014
    0 references
    31 October 2020
    0 references
    GMINA ROGOWO
    0 references
    0 references

    52°43'25.3"N, 17°39'3.2"E
    0 references
    W ramach projektu pn. "Budowa sieci wodociągowej z przyłączami w m. Złotniki" zostanie wybudowana gminna sieć wodociągowa dla budynków usytuowanych w zwartej zabudowie. Projektowana sieć umożliwi przełączenie istniejących budynków do nowej, gminnej sieci wodociągowej zasilanej z ujęcia wodociągowego w Czewujewie. Włączenie projektowanej sieci do istniejącej nastąpi we wsi Grochowiska Księże za istniejącym hydrantem. W ramach projektu zostanie wykonana sieć wodociągowa wraz z przyłączami w m. Złotniki oraz spięcie sieci istniejących w Czewujewie. Ogólna długość projektowanej sieci wodociągowej głównej wynosi L= 5239,0 m tj. rury PVC ? 160 mm długości L = 2582,0 m, rury PVC ? 110 mm długości L = 2086,0 m (w tym 411,0 m spięcia istniejących sieci w m. Czewujewo), rury PVC ? 90 mm długości L = 571,0 m. Ogólna długość przyłączy wodociągowych wynosi L=388,0 m - 43 przyłącza, w tym: ? rury PE ? 50 mm o długości L = 66,0 m, rury PE ? 40 mm o długości L = 98,0 m, rury PE ? 32 mm o długości L = 224,0 m, razem L= 388,0 m. Przyłącza od sieci głównej do granicy działki stanowią długość L=241,0m. Przyłącza od granicy działki do budynku wraz z zestawem wodomierzowym wynoszą L=174,0m.Ogólna wartość projektu stanowi wartość 2 372 756,83 zł. W wyniku realizacji projektu wzrośnie liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę o 542 osoby, długość wybudowanej sieci wodociągowej wyniesie 5,24 km. (Polish)
    0 references
    As part of the project entitled “Construction of a water supply network with connections in Zlotniki” will be built a municipal water supply network for buildings located in compact buildings. The planned network will enable the transition of existing buildings to the new municipal water supply network powered by the water supply in Chevujewo. The integration of the planned network into the existing network will take place in the village of Grochowiska Księże after the existing hydrant. As part of the project, a water supply network will be built with connections in Złotniki and a connection of existing networks in Chevujewo. The overall length of the designed main water supply network is L=5239.0 m i.e. PVC pipe? 160 mm length L = 2582.0 m, PVC pipes? 110 mm length L = 2086.0 m (including 411.0 m of tension of existing nets in Chevewo), PVC pipes? 90 mm long L = 571.0 m. The overall length of the water supply connections is L=388.0 m – 43 connections, including: PE pipes? 50 mm long L = 66.0 m, PE pipe? 40 mm long L = 98.0 m, PE pipe? 32 mm long L = 224,0 m, total L= 388.0 m. Connectors from the main network to the parcel boundary are L=241,0m. Connections from the border of the plot to the building together with the water meter set are L=174,0m. The total value of the project is PLN 2 372 756.83. As a result of the project, the number of additional people benefiting from the improved water supply will increase by 542 people, the length of the water supply network will be 5.24 km. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.04.03.00-04-0001/19
    0 references