Construction of a sewerage network including infrastructure and pumping stations in the town of Pachocina (Q98437): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): In order to meet the national and European requirements, the Municipality of Varna has planned an investment in the field of wastewater management which is the subject of this proposal. The project will be carried out in the Kujawsko-Pomorskie Province in the Warlubie agglomeration. The project involves the construction of a sewerage system including the infrastructure and pumping stations of the home and the electrical installations in the town...) |
||
Property / summary | |||
In order to meet the national and European requirements, the Municipality of Varna has planned an investment in the field of wastewater management which is the subject of this proposal. The project will be carried out in the Kujawsko-Pomorskie Province in the Warlubie agglomeration. The project involves the construction of a sewerage system including the infrastructure and pumping stations of the home and the electrical installations in the town of Płock. The investment is divided into two stages, which will be implemented in 2019. It will also affect the adaptation of waste water solutions to the requirements of the legislation currently in force. The investment will lead to an increase in the level of survey of the agglomeration of Warubie. It is accepted that the maximum permissible emission rates in wastewater effluents discharged from wastewater treatment plants after completion of the project will be in line with the Water Act and the Ministry of the Environment Regulations of 18 November 2014 on the conditions to be met when discharging wastewater to water or soil and on substances which are particularly harmful to the aquatic environment (Dz. Journal of Laws No 137, item EUR 984). The main aim of the project is: The increase in the population using a wastewater treatment system in accordance with the Urban Waste Water Directive by means of the construction of a sewage system in the agglomeration of Warlubie in the town of Pachocina. The implementation of the investment will contribute to the elimination of problems linked to the former status of the sewerage infrastructure in the agglomeration of Warlubie.Having regard to the location of the project, its implementation will make it possible to refer to environmental benefits in terms of reducing discharges into the environment and to improving the quality of surface and ground waters and soil. (English) | |||
Property / summary: In order to meet the national and European requirements, the Municipality of Varna has planned an investment in the field of wastewater management which is the subject of this proposal. The project will be carried out in the Kujawsko-Pomorskie Province in the Warlubie agglomeration. The project involves the construction of a sewerage system including the infrastructure and pumping stations of the home and the electrical installations in the town of Płock. The investment is divided into two stages, which will be implemented in 2019. It will also affect the adaptation of waste water solutions to the requirements of the legislation currently in force. The investment will lead to an increase in the level of survey of the agglomeration of Warubie. It is accepted that the maximum permissible emission rates in wastewater effluents discharged from wastewater treatment plants after completion of the project will be in line with the Water Act and the Ministry of the Environment Regulations of 18 November 2014 on the conditions to be met when discharging wastewater to water or soil and on substances which are particularly harmful to the aquatic environment (Dz. Journal of Laws No 137, item EUR 984). The main aim of the project is: The increase in the population using a wastewater treatment system in accordance with the Urban Waste Water Directive by means of the construction of a sewage system in the agglomeration of Warlubie in the town of Pachocina. The implementation of the investment will contribute to the elimination of problems linked to the former status of the sewerage infrastructure in the agglomeration of Warlubie.Having regard to the location of the project, its implementation will make it possible to refer to environmental benefits in terms of reducing discharges into the environment and to improving the quality of surface and ground waters and soil. (English) / rank | |||
Normal rank |
Revision as of 09:13, 6 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a sewerage network including infrastructure and pumping stations in the town of Pachocina |
Project in Poland financed by DG Regio |
Statements
493,000.0 zloty
0 references
713,400.0 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
31 October 2019
0 references
GMINA WARLUBIE
0 references
W celu spełnienia wymagań krajowych i europejskich Gmina Warlubie zaplanowała inwestycję w zakresie gospodarki ściekowej, będącą przedmiotem niniejszego wniosku. Projekt realizowany będzie w województwie Kujawsko- Pomorskim na terenie aglomeracji Warlubie. Projekt obejmuje budowę kanalizacji sanitarnej wraz z infrastrukturą i przepompowniami przydomowymi oraz instalacji elektrycznej w miejscowości Płochocin. Inwestycja podzielona została na dwa etapy, które realizowane będą w roku 2019. Wpłynie również na dostosowanie rozwiązań gospodarki ściekowej do wymogów aktualnie obowiązujących przepisów. Inwestycja przyczyni się do zwiększenia poziomu skanalizowania aglomeracji Warlubie. Przyjmuje się, że dopuszczalne maksymalne wskaźniki zanieczyszczeń w ściekach oczyszczonych, odpływających z oczyszczalni ścieków po realizacji projektu, będą odpowiadały wymaganiom ustawy Prawo wodne oraz Rozporządzeniu MŚ z dnia 18 listopada 2014r, w sprawie warunków, jakie należy spełnić przy wprowadzaniu ścieków do wód lub do ziemi, oraz w sprawie substancji szczególnie szkodliwych dla środowiska wodnego (Dz. U. Nr 137 poz. 984). Celem głównym projektu jest: Zwiększenie liczby ludności korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych poprzez budowę sieci kanalizacji w aglomeracji Warlubie w miejscowości Płochocin. Wykonanie inwestycji przyczyni się do likwidacji problemów, które wiązały się z wcześniejszym stanem infrastruktury kanalizacyjnej na terenie aglomeracji Warlubie.Mając na uwadze lokalizację projektu, jego realizacja umożliwi odniesienie korzyści środowiskowych w postaci zmniejszenia zanieczyszczeń odprowadzanych do środowiska, a także poprawę jakości wód powierzchniowych i podziemnych oraz gleby. (Polish)
0 references
In order to meet the national and European requirements, the Municipality of Varna has planned an investment in the field of wastewater management which is the subject of this proposal. The project will be carried out in the Kujawsko-Pomorskie Province in the Warlubie agglomeration. The project involves the construction of a sewerage system including the infrastructure and pumping stations of the home and the electrical installations in the town of Płock. The investment is divided into two stages, which will be implemented in 2019. It will also affect the adaptation of waste water solutions to the requirements of the legislation currently in force. The investment will lead to an increase in the level of survey of the agglomeration of Warubie. It is accepted that the maximum permissible emission rates in wastewater effluents discharged from wastewater treatment plants after completion of the project will be in line with the Water Act and the Ministry of the Environment Regulations of 18 November 2014 on the conditions to be met when discharging wastewater to water or soil and on substances which are particularly harmful to the aquatic environment (Dz. Journal of Laws No 137, item EUR 984). The main aim of the project is: The increase in the population using a wastewater treatment system in accordance with the Urban Waste Water Directive by means of the construction of a sewage system in the agglomeration of Warlubie in the town of Pachocina. The implementation of the investment will contribute to the elimination of problems linked to the former status of the sewerage infrastructure in the agglomeration of Warlubie.Having regard to the location of the project, its implementation will make it possible to refer to environmental benefits in terms of reducing discharges into the environment and to improving the quality of surface and ground waters and soil. (English)
0 references
Identifiers
RPKP.04.03.00-04-0002/18
0 references