Modernisation of the hydroelectric power plant in Borów (Q137696): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Modernisation de la centrale hydroélectrique de Borów |
Revision as of 21:27, 2 December 2021
Project Q137696 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the hydroelectric power plant in Borów |
Project Q137696 in Poland |
Statements
2,765,664.19 zloty
0 references
4,609,440.32 zloty
0 references
60.0 percent
0 references
3 January 2017
0 references
11 March 2019
0 references
ENERGA WYTWARZANIE S.A.
0 references
Głównym celem niniejszego Projektu jest zwiększenie wolumenu energii elektrycznej wytwarzanej w elektrowni wodnej Borowo o ok . 757,58 MWh/rok. Realizacja zadania przełoży się m.in. na uniknięcie emisji dwutlenku węgla w wymiarze blisko 630 ton rocznie, a także innych szkodliwych substancji emitowanych do atmosfery przez elektrownie konwencjonalne. Przedmiotem modernizacji EW Borowo jest wyposażenie obiektu w dodatkową, wysokosprawną turbinę wodną o mocy ok. 0,7 MWe oraz nowe urządzenia elektrotechniczne, zakłada się m.in. wymianę rozdzielni 15kV wraz ze stacją napowietrzną na stację wnętrzową z transformatorami suchymi. Nowa turbina zostanie zamontowana w istniejącej niezagospodarowanej komorze i przyjmie cały charakterystyczny przepływ roku średniego , pozostawiając niskosprawne, istniejące dwa hydrozespoły elektrowni w rezerwie, ograniczając ich pracę do szczytowych przepływów występujących średnio przez kilka dni w roku. Takie rozwiązanie minimalizuje oddziaływanie modernizacji na środowisko naturalne. Instalacja nowego hydrozespołu i zastąpienie wiekowych już urządzeń wydłuży oczekiwany „czas życia” elektrowni, oddanej do użytkowania ok. 1918-1919 roku. Badania sprawności pracy istniejących hydrozespołów wykazały, że osiągają one obecnie maksymalny poziom ok. 77%. Jeszcze w 1967 r. obserwowano sprawność na poziomie 85%. Przewidywana jest dalsza degradacja parametrów sprawnościowych, jak i wzrost awaryjności zainstalowanych urządzeń. Utrzymanie w pracy istniejącej elektrowni wodnej jest rozwiązaniem tańszym niż budowa nowego obiektu. Realizacja projektu jest możliwa jedynie w przypadku przyznania dotacji. Na powyższe wpływ ma utrata w perspektywie 2020 roku praw majątkowych przyznawanych do energii z OZE oraz relatywnie niskie ceny energii elektrycznej. Projekt „Modernizacja elektrowni wodnej w Borowie” będzie realizowany na terenie Gminy Kalisz Pomorski, która należy do tzw. Specjalnej Strefy Wyłączenia (SSW) – obszaru strategi (Polish)
0 references
The main objective of this Project is to increase the volume of electricity produced in the Borowo hydroelectric power plant by approx. 757,58 MWh/year. The task will translate, among other things, into avoiding carbon dioxide emissions of nearly 630 tonnes per year, as well as other harmful substances emitted into the atmosphere by conventional power plants. The subject of modernisation of EW Borowo is to equip the facility with an additional, high-performance water turbine with a power of approx. 0.7 MWe and new electrical equipment are assumed, among others, to replace the 15 kV switchgear with an overhead station for the interior station with dry transformers. The new turbine will be installed in an existing undeveloped chamber and will take on the entire characteristic average year flow, leaving the existing two hydro-assemblies in reserve low-efficiency, limiting their work to peak flows occurring on average for several days a year. This minimises the environmental impact of modernisation. The installation of the new hydro assembly and the replacement of age-old devices will extend the expected “life” of the power plant, put into service approx. 1918 to 1919. Tests on the efficiency of existing hydro-assemblies have shown that they are currently reaching a maximum of approx. IT’S 77 %. As early as 1967, an efficiency of 85 % was observed. Further degradation of performance parameters is anticipated, as well as an increase in the failure of installed devices. Maintaining an existing hydroelectric power plant is cheaper than building a new facility. The implementation of the project is only possible if a grant is awarded. The foregoing is affected by the loss of property rights granted to renewable energy and relatively low electricity prices in the perspective of 2020. The project “Modernisation of the hydroelectric power plant in Borów” will be carried out in the Kalisz Pomorski commune, which belongs to the so-called. Special Exclusion Zone (SSW) – Strategy area (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-A055/16
0 references