Increasing energy efficiency of GUBAD (Q112190): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
label / enlabel / en
Increasing energy efficiency of GUBAD_2
Increasing energy efficiency of GUBAD

Revision as of 13:38, 29 October 2020

Project Q112190 in Poland
Language Label Description Also known as
English
Increasing energy efficiency of GUBAD
Project Q112190 in Poland

    Statements

    0 references
    1,495,544.82 zloty
    0 references
    358,930.76 Euro
    13 January 2020
    0 references
    2,675,006.02 zloty
    0 references
    642,001.44 Euro
    13 January 2020
    0 references
    55.91 percent
    0 references
    17 July 2019
    0 references
    17 July 2021
    0 references
    GUBAD-WZORNICTWO, PRODUKCJA, HANDEL SPÓŁKA Z OGRANICZONA OPDOWIEDZIALNOSCIĄ
    0 references
    0 references
    Projekt dotyczy poprawy efektywności energetycznej w przedsiębiorstwie GUBAD Wzornictwo, Produkcja, Handel Sp. z o.o. w zakresie: Modernizacji instalacji c.o., która obejmie wymianę pieca gazowego na piec opalany peletami o mocy ok 60 kW, zamontowanie automatyki na grzejnikach i nagrzewnicach. Nastawami termozaworów oraz pracą kotła będzie kierował system zarządzania energią. Modernizacji instalacji c.w.u: montaż perlatorów przy bateriach umywalkowych i zlewozmywakowych, Modernizacji procesu technologicznego cięcia blach zastąpienie pracy wycinarki laserowej o łącznej mocy całkowitej 66 kW i mocy cięcia 2,5 kW, na nową wycinarkę o mocy całkowitej 30kW i mocy cięcia 8,0 kW. Projekt obejmuje również niezbędne wydatki nieinwestycyjne: audyt energetyczny, audyt efektywności energetycznej, dokumentację projektową, promocję, audyty powykonawcze.Potrzeba realizacji projektu wynika z zidentyfikowanych problemów: nadmiernych straty ciepła i wysokich kosztów eksploatacyjnych na ogrzewanie, nadmiernego zużycia energii elektrycznej, zużywanej w procesie technologicznym, dużego zużycia nośników energii w przedsiębiorstwie oraz powiązana z nimi duża emisja zanieczyszczeń do powietrza.Wnioskodawca chce realizować projekt z uwagi na korzyści i zniwelowanie zidentyfikowanych problemów: ograniczenie kosztów eksploatacyjnych na ogrzewanie i energię elektryczną, ograniczenie zużycia nośników energii w przedsiębiorstwie, poprawa jakości powietrza związana z ograniczeniem emisji zanieczyszczeń z nośników energii: CO2, CO, SOx, zastosowanie OZE w przedsiębiorstwie, oszczędność zużycia wody.W ramach projektu nastąpi zwiększenie efektywności energetycznej w projekcie na poziomie 50,49 oraz zainstalowanie źródeł OZE. Realizacja projektu skutkuje obniżeniem emisji gazów cieplarnianych o 84,25 Mgrok oraz innych zanieczyszczeń CO, SOx. (Polish)
    0 references
    The project concerns improving energy efficiency in GUBAD Design, Production, Handel Sp. z o.o. in the scope of: Modernisation of the central heating system, which will include the replacement of the gas furnace for pellet-fired furnace with a capacity of approx. 60 kW, installation of automation on radiators and heaters. The thermovalve settings and the boiler’s operation will be managed by the energy management system. Modernisation of the central heating system: installation of perlators at washbasin and sink batteries, Modernisation of the process of cutting of sheet metals replacing the operation of a laser cutter with a total power of 66 kW and a cutting power of 2.5 kW, with a new cutter with a total power of 30 kW and a cutting power of 8.0 kW. The project shall also cover the necessary non-investment expenditure: energy audit, energy efficiency audit, project documentation, promotion, post-executive audits.The need for the project results from the problems identified: excessive heat loss and high operating costs for heating, excessive consumption of electricity, consumed in the technological process, high energy consumption in the company and the associated high emissions of pollutants into the air.The applicant wants to implement the project due to the benefits and elimination of identified problems: reducing operating costs for heating and electricity, reducing the consumption of energy carriers in a company, improving air quality associated with reducing pollutant emissions from energy carriers: CO2, CO, SOx, the use of RES in the company, saving water consumption.The project will increase energy efficiency in the project at the level of 50.49 and install RES sources. The project results in a reduction in greenhouse gas emissions by 84.25 Mgrok and other CO, SOx pollutants. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.02.00-12-0530/18
    0 references