Thermal modernisation of the public building in the neighbour (Q105238): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
label / enlabel / en
Thermal modernisation of the public building in the neighbour_2
Thermal modernisation of the public building in the neighbour

Revision as of 11:15, 29 October 2020

Project Q105238 in Poland
Language Label Description Also known as
English
Thermal modernisation of the public building in the neighbour
Project Q105238 in Poland

    Statements

    0 references
    687,641.11 zloty
    0 references
    165,033.87 Euro
    13 January 2020
    0 references
    808,989.55 zloty
    0 references
    194,157.49 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2019
    0 references
    30 November 2021
    0 references
    GMINA SUŁÓW
    0 references
    0 references
    Celem projektu jest poprawa jakości środowiska naturalnego w Gminie Sułów poprzez kompleksową termomodernizację budynku użyteczności publicznej mieszczącego obecnie bibliotekę gminną wraz z czytelnią, zlokalizowanego w miejscowości Sąsiadka na terenie Gminy Sułów - działki o nr ewid. 3923/1, 3892/1 i 3893/1 obręb 0009 Sąsiadka. Po zakończeniu trwających obecnie zmian w MPZP w tym budynku zostanie dodatkowo stworzony Ośrodka Wsparcia - Środowiskowy Dom Samopomocy, który będzie miał na celu dzienną opiekę dla osób starszych oraz opiekę nad osobami leżącymi (mobilna opieka pielęgniarska), co jest zgodne z Lokalnym Programem Rewitalizacji dla Gminy Sułów. W ramach projektu wykonane zostaną roboty budowlane polegające na kompleksowej termomodernizacji budynku. Przedsięwzięcie obejmuje roboty polegające na wykonaniu ociepleń ścian zewnętrznych cokołów i ścian piwnic budynku, wykonanie ocieplenia stropu budynku, wymianę stolarki okiennej drewnianej na okna z PCV, wymianę drzwi wejściowych do budynku na aluminiowe o ciepłym profilu, modernizację instalacji grzewczej poprzez wymianę instalacji c.o., grzejników i montaż kotła na biomasę (pellet), modernizację instalacji ciepłej wody użytkowej oraz wymianę opraw oświetleniowych tradycyjnych na oprawy typu LED. Dodatkowo projekt zakłada wdrożenie systemu pomiaru, monitoringu i zarządzania wykorzystaniem energii. Przedmiotowy projekt jest spójny z "Planem gospodarki niskoemisyjnej". Roczne oszczędności kosztów energii wyniosą 39 797,50 zł./rok. Audyt energetyczny wykazał, że dzięki termomodernizacji możliwe będzie zmniejszenie rocznego zapotrzebowania na energię o 63,53 %. W wyniku realizacji projektu ilość zaoszczędzonej energii cieplnej wyniesie 1 026,60 GJ/rok, zmniejszenie zużycia energii pierwotnej - 697 494,44 kWh/rok, produkcja energii cieplnej z nowo wybudowanej instalacji OZE - 150,03 MWht/rok, spadek emisji gazów cieplarnianych 83,56 tCO2/rok, dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych 0,08 MW. (Polish)
    0 references
    The aim of the project is to improve the quality of the natural environment in the Sułów Municipality through a comprehensive thermomodernisation of the public utility building, which currently houses the municipal library with a reading room, located in the village of Sąsiadka in the municipality of Sułów – plot with evid. 3923/1, 3892/1 and 3893/1 perimeter 0009 Neighbor. After the completion of the ongoing changes to the MPZP in this building, the Support Centre – Environmental Home of Self-Help will be created, which will aim at day care for the elderly and care of people lying (mobile nursing care), which is in accordance with the Local Programme of Regeneration for the Municipality of Sułów. As part of the project, construction works consisting of comprehensive thermomodernisation of the building will be carried out. The project includes works consisting of insulation of the outer walls of the plinths and walls of the building’s cellars, execution of insulation of the ceiling of the building, replacement of wooden carpentry with PVC windows, replacement of entrance doors to the building with a warm profile, modernisation of heating system by replacing central heating systems, radiators and installation of a boiler for biomass (pellet), modernisation of hot water installation and replacement of LED lighting fittings for traditional lighting fittings. In addition, the project assumes the implementation of a system of measurement, monitoring and management of energy use. This project is consistent with the low-carbon economy plan. Annual energy cost savings will amount to PLN 39 797.50 per year. The energy audit showed that, thanks to thermal modernisation, it would be possible to reduce the annual energy demand by 63.53 %. As a result of the project, the amount of thermal energy saved will be 1 026.60 GJ/year, reduction of primary energy consumption – 697494.44 kWh/year, thermal energy production from newly built RES installation – 150.03 MWht/year, decrease in greenhouse gas emissions 83.56 tCO2/year, additional capacity to generate energy from renewable sources 0.08 MW. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0006/19
    0 references