Building modifications and reduction of energy performance of the building no. p. 2347, Rakovník (Q16174): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The investor’s intention is the comprehensive insulation of the object, including replacement of the replacement of the building, to comply with current thermal requirements and standards. The adaptation shall include the reconstruction of artificial lighting, the installation of air-technical equipment and heat sources. The reason for carrying out the construction work is the improvement of the energy performance of the object., remove_old_en...) |
(Created claim: summary (P836): The investor’s intention is to comprehensively insulate the building including the replacement of hole fillings to meet current thermal-technical requirements and standards. The modifications will also include reconstruction of artificial lighting, installation of ventilation equipment and heat source. The reason for the construction modifications is to reduce the energy performance of the building. a., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The investor’s intention is to comprehensively insulate the building including the replacement of hole fillings to meet current thermal-technical requirements and standards. The modifications will also include reconstruction of artificial lighting, installation of ventilation equipment and heat source. The reason for the construction modifications is to reduce the energy performance of the building. a. (English) | |||||||||||||||
Property / summary: The investor’s intention is to comprehensively insulate the building including the replacement of hole fillings to meet current thermal-technical requirements and standards. The modifications will also include reconstruction of artificial lighting, installation of ventilation equipment and heat source. The reason for the construction modifications is to reduce the energy performance of the building. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The investor’s intention is to comprehensively insulate the building including the replacement of hole fillings to meet current thermal-technical requirements and standards. The modifications will also include reconstruction of artificial lighting, installation of ventilation equipment and heat source. The reason for the construction modifications is to reduce the energy performance of the building. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:40, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Building modifications and reduction of energy performance of the building no. p. 2347, Rakovník |
Project in Czech Republic financed by DG Regio |
Statements
5,104,032.74 Czech koruna
0 references
10,208,065.49 Czech koruna
0 references
50.0 percent
0 references
28 February 2021
0 references
REASON INVESTMENT a.s.
0 references
36001
0 references
Investorovým záměrem je komplexní zateplení objektu včetně výměny otvorových výplní, aby vyhověl současným tepelně-technickým požadavkům a normám. Součástí prováděných úprav bude i rekonstrukce umělého osvětlení, instalace vzduchotechnických zařízení a zdroje tepla. Důvodem provádění stavebních úprav je snížení energetické náročnosti objektu. a. (Czech)
0 references
The investor’s intention is to comprehensively insulate the building including the replacement of hole fillings to meet current thermal-technical requirements and standards. The modifications will also include reconstruction of artificial lighting, installation of ventilation equipment and heat source. The reason for the construction modifications is to reduce the energy performance of the building. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0013031
0 references