Comprehensive improvement of the energy efficiency of public buildings in the municipality of Liszki (Q112216): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of a deep thermal renovation of 2 public buildings Piekary 100 and Liszki 5.Scope of action is the result of audits carried out and established on their basis. Insulation of the roof of the new part of the building, the insulation of the external walls of the old building, the insulation of the external walls of the old building, the insulation of the external walls of the basement, the replacement of the old windows. Lisk...)
(‎Created claim: summary (P836): The subject of the project is the deep modernisation of 2 public utility buildings Piekary 100 and Liszka 5.The scope of the activities results from audits carried out and the functional programs prepared on the basis of them. The warming of the ceiling under the roof in the old part of the building, the warming of the exterior walls of the new part of the building, the warming of the outer walls of the old part of the building, the insulation o...)
Property / summary
 
The subject of the project is the deep modernisation of 2 public utility buildings Piekary 100 and Liszka 5.The scope of the activities results from audits carried out and the functional programs prepared on the basis of them. The warming of the ceiling under the roof in the old part of the building, the warming of the exterior walls of the new part of the building, the warming of the outer walls of the old part of the building, the insulation of the outer walls., the replacement of the old door door. the replacement of the old external windows. on the new, Modernisation of the heating system of the heating system consisting of a comprehensive replacement of the central heating system with a new minimal thermal inertia with new radiators of steel plated radiators, Foxes 5 Replacement and warming of the ceiling under the roof, Replacement of external doors on the rear facade to new, Modernisation of heating system consisting of comprehensive replacement of central heating system with new thermal inertia with new thermal inertia with new steel radiators with convectors with convectors, installation of the solar heating system, installation of thermal and control valves, installation of heat meters along with the replacement of the gas boiler on the condensed boiler, (English)
Property / summary: The subject of the project is the deep modernisation of 2 public utility buildings Piekary 100 and Liszka 5.The scope of the activities results from audits carried out and the functional programs prepared on the basis of them. The warming of the ceiling under the roof in the old part of the building, the warming of the exterior walls of the new part of the building, the warming of the outer walls of the old part of the building, the insulation of the outer walls., the replacement of the old door door. the replacement of the old external windows. on the new, Modernisation of the heating system of the heating system consisting of a comprehensive replacement of the central heating system with a new minimal thermal inertia with new radiators of steel plated radiators, Foxes 5 Replacement and warming of the ceiling under the roof, Replacement of external doors on the rear facade to new, Modernisation of heating system consisting of comprehensive replacement of central heating system with new thermal inertia with new thermal inertia with new steel radiators with convectors with convectors, installation of the solar heating system, installation of thermal and control valves, installation of heat meters along with the replacement of the gas boiler on the condensed boiler, (English) / rank
 
Normal rank
Property / summary: The subject of the project is the deep modernisation of 2 public utility buildings Piekary 100 and Liszka 5.The scope of the activities results from audits carried out and the functional programs prepared on the basis of them. The warming of the ceiling under the roof in the old part of the building, the warming of the exterior walls of the new part of the building, the warming of the outer walls of the old part of the building, the insulation of the outer walls., the replacement of the old door door. the replacement of the old external windows. on the new, Modernisation of the heating system of the heating system consisting of a comprehensive replacement of the central heating system with a new minimal thermal inertia with new radiators of steel plated radiators, Foxes 5 Replacement and warming of the ceiling under the roof, Replacement of external doors on the rear facade to new, Modernisation of heating system consisting of comprehensive replacement of central heating system with new thermal inertia with new thermal inertia with new steel radiators with convectors with convectors, installation of the solar heating system, installation of thermal and control valves, installation of heat meters along with the replacement of the gas boiler on the condensed boiler, (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:22, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive improvement of the energy efficiency of public buildings in the municipality of Liszki
Project in Poland financed by DG Regio

    Statements

    0 references
    470,225.61 zloty
    0 references
    112,854.15 Euro
    13 January 2020
    0 references
    783,709.35 zloty
    0 references
    188,090.24 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    1 January 2018
    0 references
    31 December 2018
    0 references
    GMINA LISZKI
    0 references
    0 references
    Przedmiotem projektu jest głęboka termomodernizacja 2 budynków użyteczności publicznej Piekary 100 i Liszki 5.Zakres działań wynika z przeprowadzonych audytów i sporządzonych na ich podstawie Programów Funkcjonalno Użytkowych.Piekary 100: Docieplenie stropu pod dachem w starej cz. budynku, Docieplenie ścian zewnętrznych nowej cz. budynku, Docieplenie ścian zewnętrznych starej cz. budynku, Docieplenie ścian zewn. piwnic, Wymiana starych drzwi zewn. na nowe, Wymiana starych okien zewn. na nowe, Modernizacja systemu grzewczego polegająca na kompleksowej wymianie instalacji centralnego ogrzewania na nową o znikomej bezwładności cieplnej z nowymi grzejnikami stalowymi płytowymi z konwektorem, montażu przygrzejnikowych zaworów termostatycznych i regulacyjnych podpionowych, zainstalowaniu licznika ciepła wraz z wymianą kotła gazowego na kondensacyjny kocioł gazowy, Modernizacja systemu oświetlenia wbudowanego, wymianie źródeł światła na nowe energooszczędne typu LED wraz z nowoczesnymi oprawami oraz montażu czujników ruchu, Odtworzenie instalacji odgromowej po wykonaniu docieplenia izolacji ścian zewnętrznych. Liszki 5 Wymiana i docieplenie stropu pod dachem, Wymiana drzwi zewnętrznych na elewacji tylnej na nowe, Modernizacja systemu grzewczego polegająca na kompleksowej wymianie instalacji centralnego ogrzewania na nową o znikomej bezwładności cieplnej z nowymi grzejnikami stalowymi płytowymi z konwektorem, montażu przygrzejnikowych zaworów termostatycznych i regulacyjnych podpionowych, zainstalowaniu licznika ciepła wraz z wymianą kotła gazowego na kondensacyjny kocioł gazowy, Modernizacja systemu oświetlenia wbudowanego, wymianie źródeł światła na nowe energooszczędne typu LED wraz z nowoczesnymi oprawami oraz montażu czujników ruchu, System modułów fotowoltaicznych, wytwarzających energię elektryczną, zainstalowanych na południowej części dachu nieruchomości.Realizacja projektu według Żółtej Książki FIDIC. (Polish)
    0 references
    The subject of the project is the deep modernisation of 2 public utility buildings Piekary 100 and Liszka 5.The scope of the activities results from audits carried out and the functional programs prepared on the basis of them. The warming of the ceiling under the roof in the old part of the building, the warming of the exterior walls of the new part of the building, the warming of the outer walls of the old part of the building, the insulation of the outer walls., the replacement of the old door door. the replacement of the old external windows. on the new, Modernisation of the heating system of the heating system consisting of a comprehensive replacement of the central heating system with a new minimal thermal inertia with new radiators of steel plated radiators, Foxes 5 Replacement and warming of the ceiling under the roof, Replacement of external doors on the rear facade to new, Modernisation of heating system consisting of comprehensive replacement of central heating system with new thermal inertia with new thermal inertia with new steel radiators with convectors with convectors, installation of the solar heating system, installation of thermal and control valves, installation of heat meters along with the replacement of the gas boiler on the condensed boiler, (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.01-12-0536/17
    0 references