Reconstruction (modernisation) of water treatment station in Góry, commune Markuszów (Q105585): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q105585 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q105585 w Polsce |
Revision as of 12:00, 29 October 2020
Project Q105585 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction (modernisation) of water treatment station in Góry, commune Markuszów |
Project Q105585 in Poland |
Statements
765,927.57 zloty
0 references
901,091.26 zloty
0 references
85.0 percent
0 references
8 June 2015
0 references
15 December 2017
0 references
GMINA MARKUSZÓW
0 references
Przedmiotem jest przebudowa(modernizacja) budynku SUW w m. Góry wraz z zainstalowaniem nowych urządzeń do przesyłu i uzdatniania wody. Stacja obsługuje 790 mieszkańców, 4 przedsiębiorstwa, 2 bud. użyt. pub. z terenu 4 miejscowości. Budynek jest w b. złym stanie techn. Stare rurociągi ulegają awariom, woda złej jakości. Zakres projektu: *przebudowa i modernizacja budynku SUW(w tym m.in.: wymiana dachu, okien i drzwi, docieplenie, likwidacja kotłowni węglowej- na ogrzewanie elektryczne i adaptacja pomieszczenia na chlorownię), wymiana ogrodzenia, utwardzenie działki; *instalacje sanitarne wew., w tym:-montaż urządzeń technolog. w budynku(m.in.: zestawy: aeracji, filtracyjny, dmuchawy, chloratora, sprężarka, rozdzielnia pneumatyczna i technologiczna, zestaw hydroforowy+pompa płuczna); -węzeł sanitarny; -urządzenia sanit. i dezynfekujące; *instalacje elektr. wew.; *roboty sanitarne zew.:-wymiana części urządzeń zew.(m.in. na studniach, odstojniku); -budowa zbiornika bezodpływowego ścieków z chlorowni; -wymiana części urządzeń na zbiorniku retencyjnym i budowa drugiego zbiornika reten.; przebudowa rurociągów zew.; *przebudwa przyłącza elektroenergetycznego. Nie zmieni się ujęcie wody ani max. ilość pobieranej wody. Woda ze studni kierowana do zestawu aeracji I stopnia. Proces aeracji odbywa się w aeratorze ciśnieniowym. Po napowietrzeniu, woda poddawana procesowi filtracji jednostopniowej w procesie odżelazienia na złożu kwarcowo-katalitycznym. Następnie-retencja w zbiornikach wyrównawczych. Pompowanie wody do sieci wodociągowej-za pomocą zestawu hydroforowego (pompownia II stopnia). Okresowa dezynfekcja-poprzez dozowanie roztworu podchlorynu sodu do wody płynącej do sieci wodociągowej. Stacja wodociągowa w pełni zautomatyzowana. Uruchomiony serwis dla użytkowników do transakcji on-line (możliwość sprawdzenia stanu liczników na wodę, rozliczenia wody, przesyłanie stanu liczników do działu sprzedaży, formularze do wyrażania opinii, uwag, skarg) (Polish)
0 references
The subject matter is the reconstruction (modernisation) of the SUW building in Góra with the installation of new equipment for water transfer and treatment. The station serves 790 inhabitants, 4 companies, 2 building. pub. from the area of 4 villages. The building is in bad condition techn. Old pipelines fail, water of poor quality. Scope of the project: *construction and modernisation of the SUW building (including: replacement of the roof, windows and doors, warming, decommissioning of the coal boiler- for electrical heating and adaptation of the room to the chlorine plant), replacement of fences, curing of the plot; * sanitary installations, including:-assembly of technologist equipment in the building(e.g.: sets of: aeration, filtration, blowers, chlorator, compressor, pneumatic and technological switchboard, hydrophore unit+pulmonary pump); —a sanitary node; — sanitary and disinfecting devices; *electric installations; * sanitary robots called:-Replacement of parts of the call equipment(e.g. on wells, repository); — construction of a waste water tank from a chlorine plant; — replacement of parts of equipment on the retention tank and construction of the second reten tank; reconstruction of the pipelines; *construction of the power connection. There will be no change in the intake of water or max. the amount of water drawn. Water from the well directed to a set of first-degree aerations. The aeration process is carried out in a pressure aerator. After aeration, water undergoes a single-stage filtration process by deferring on a quartz-catalytic deposit. Then-retention in compensating tanks. Pumping water into the water supply system – using a hydrophore set (second-degree pumping station). Periodic disinfection-by dispensing sodium hypochlorite solution into water flowing into the water supply line. The water supply station is fully automated. Running service for users for online transactions (it is possible to check the state of water meters, water billing, transfer of meter status to the sales department, forms for expressing opinions, comments, complaints) (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0007/15
0 references