Thermal modernisation of the building of the Primary School in Poćucach in Sejny (Q116952): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item) |
||||||||||||||
Property / budget | |||||||||||||||
284,160.92 zloty
| |||||||||||||||
Property / budget: 284,160.92 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
68,198.62 Euro
| |||||||||||||||
Property / budget: 68,198.62 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 68,198.62 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 68,198.62 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 20:25, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building of the Primary School in Poćucach in Sejny |
Project in Poland financed by DG Regio |
Statements
218,803.88 zloty
0 references
284,160.92 zloty
0 references
77.0 percent
0 references
16 November 2015
0 references
31 October 2017
0 references
GMINA SEJNY
0 references
Projekt dotyczy głębokiej TERMOMODERNIZACJI Szkoły Podstawowej w Poćkunach w Gminie Sejny. Okres realizacji XI.2015-IX.2017 r. w ramach jednego etapu. CELEM bezpośrednim projektu jest poprawa efektywności energetycznej budynku użyteczności publicznej w Gminie Sejny poprzez: redukcję kosztów ogrzewania, co wpłynie jednocześnie na obniżenie kosztów funkcjonowania instytucji publicznej oraz podniesienie świadomości nauczycieli i uczniów Szkoły Podstawowej w Poćkunach w zakresie oszczędności gospodarowania energią. ZADANIA do realizacji w ramach projektu to: 1)ocieplenie ścian zewnętrznych, 2)ocieplenie podłogi na gruncie, 3)ocieplenie stropu nad piwnicą, 4)ocieplenie stropodachu, 5)wymiana i montaż stolarki okiennej, 6)wymiana i montaż stolarki drzwiowej zewnętrznej, 7)modernizację instalacji ciepłej wody użytkowej, w tym montaż pompy ciepła, 8)modernizację instalacji grzewczej, w tym wymianę źródła ciepła z kotła na węgiel na kocioł opalany biomasą (pelletem). WSKAŹNIKI REZULTATU to ilość zaoszczędzonej energii cieplnej, ilość zaoszczędzonej energii elektrycznej oraz liczba złożonych audytów energetycznych ex post. WSKAŹNIKI PRODUKTU to: zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych, szacowany roczny spadek emisji gazów cieplarnianych, liczba zmodernizowanych energetycznie budynków, powierzchnia użytkowa budynków poddanych termomodernizacji, liczba zmodernizowanych źródeł ciepła oraz liczba wykonanych instalacji OZE. BENEFICJENTEM projektu będzie jednostka samorządu terytorialnego, czyli Gmina Sejny. GRUPĄ DOCELOWĄ będą przede wszystkim uczniowie (96 w szkole i 26 w oddziale przedszkolnym) oraz nauczyciele (13 osób) użytkujący budynek szkoły. PRODUKTEM PROJEKTU będzie budynek Szkoły Podstawowej w Poćkunach poddany kompleksowej termomodernizacji, w którym zgodnie z audytem energetycznym roczne zapotrzebowanie na energię spadnie o 86,80%, co przełoży się na ponad 68 tys. oszczędności, a emisja CO2 spadnie o ponad 95%. (Polish)
0 references
The project is an in-depth thermal modernisation of the Primary School in Poćucach in Sejny. Execution period XI.2015-IX.2017 in one step. The direct objective of the project is to improve the energy efficiency of the public building in the municipality of Sew by: a reduction in heating costs, which will at the same time reduce the running costs of the public institution and increase the awareness of the primary school teachers and school students. The tasks to be carried out under the project are the following: (1) insulation of external walls, (2) insulation of the floor on the ground, (3) the insulation of the basement floor, (4) the insulation of the roof floor, (5) the replacement and installation of window frames, (6) the replacement and installation of the door joinery installation, (7) the modernisation of the hot water installation including the installation of a heat pump, (8) the modernisation of the heating system, including the replacement of the heat generator with a biomass boiler (pellet). Cancellation rates are the amount of thermal energy saved, the amount of electricity saved and the number of ex-post energy audits submitted. The output indicators are: reduction of annual primary energy consumption in public buildings, estimated annual decrease in greenhouse gas emissions, the number of buildings retrofitted, the useful floor area of buildings undergoing thermal modernisation, the number of modernised heat sources and the number of RES installations carried out. The beneficiary of the project will be a local authority, i.e. the municipality of Sejny. The target group will be in particular the pupils (96 at school and 26 at the pre-school branch) and teachers (13 persons) using the school building. The project will be a building of the Primary School in Poćkunach which has undergone a comprehensive thermal modernisation which, according to the energy audit, will fall by 86.80 %, resulting in more than 68 savings, and CO2 emissions will fall by more than 95 %. (English)
0 references
Identifiers
RPPD.05.03.01-20-0008/15
0 references