(A19_069_2015_0690122_218) FACTORY REALLOCATION VIA TOOLS MANAGEMENT AND NAVIGATION (Q2065747): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Florence / rank | |||
Normal rank |
Revision as of 04:46, 17 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_069_2015_0690122_218) FACTORY REALLOCATION VIA TOOLS MANAGEMENT AND NAVIGATION |
Project in Italy financed by DG Regio |
Statements
57,979.78 Euro
0 references
115,959.56 Euro
0 references
50.0 percent
0 references
4 June 2015
0 references
18 April 2018
0 references
4 June 2018
0 references
COSTRUZIONI NOVICROM S.R.L.
0 references
COSTRUZIONI NOVICROM (CN) OPERA NELLA MECCANICA DI PRECISIONE PER PICCOLI LOTTI DI ELEVATA QUALIT? PER AUTOMOTIVE ED AVIATION. L?OBIETTIVO DEL PROGETTO FRONTMAN ? DI REALIZZARE UN FORTE AVANZAMENTO DELLA QUALIT? ED EFFICIENZA DEL PROCESSO DI PRODUZIONE TRAMITE LA RIDUZIONE DEGLI SCARTI CON L?AUMENTO DI AFFIDABILIT? E RIPETIBILIT??, RIDUZIONE DEGLI ERRORI UMANI, RIDUZIONE DEI COSTI DI PRODUZIONE, DEI TEMPI DI ATTREZZAGGIO, DEI TEMPI DI CARICAMENTO DEI PROGRAMMI DI LAVORAZIONE SULLE MACCHINE ROBOTIZZATE. I TEMPI MACCHINA NON SONO ABBATTIBILI SE NON CAMBIANDO MACCHINE O SOLUZIONI, MA I TEMPI MORTI DI CARICAMENTO UTENSILI, ATTREZZAGGIO, ETC. SONO UNA FETTA CONSISTENTE DEI TEMPI DI PRODUZIONE, VISTO CHE LA PRODUZIONE CONSISTE PRINCIPALMENTE IN PICCOLE E PICCOLISSIME SERIE, PEZZI UNICI. I TEMPI DI CAMBIO VANNO RIDOTTI AL MINIMO E LA GENERAZIONE DI PEZZI DIFETTOSI, CHE COMPORTANO TEMPO MACCHINA E UOMO PER IL LORO RECUPERO O REMAKE, VA RIDOTTA A 0. ALCUNI PUNTI CHIAVE PER L?AUMENTO DELL?EFFICI (Italian)
0 references
DOES THE CONSTRUCTION OF NOVICROM (CN) CONSTRUCTION WORK IN THE PRECISION MECHANICS FOR SMALL BATCHES OF HIGH QUALITY BATCHES? FOR AUTOMOTIVE AND AVIATION. THE OBJECTIVE OF THE PROJECT ON THE FRONT MAN? TO MAKE A MAJOR STEP FORWARD? AND EFFICIENCY OF THE PRODUCTION PROCESS THROUGH REDUCTION OF WASTE WITH L? INCREASE OF AFFIDABILIT? AND REPETITION?? REDUCTION OF HUMAN ERRORS, REDUCTION OF PRODUCTION COSTS, TIME TO EQUIP, TIME TO UPLOAD WORK PROGRAMMES ON ROBOTIC MACHINES. THE PROCESSING TIMES ARE NOT THE SAME IF NOT CHANGING MACHINERY OR SOLUTIONS, BUT THE TIME SPENT LOADING TOOLS, EQUIPMENT, ETC. ARE A SIGNIFICANT PART OF THE TIME OF PRODUCTION, SINCE PRODUCTION CONSISTS MAINLY OF SMALL AND VERY SMALL SERIES, WHICH ARE UNIQUE. THE CHANGEOVER TIME MUST BE REDUCED TO A MINIMUM AND THE GENERATION OF DEFECTIVE PARTS, WHICH CARRIES A MACHINE AND A MAN FOR RECOVERY OR REMAKE, MUST BE REDUCED TO 0. KEY POINTS FOR L? INCREASE OF? (English)
0 references
Identifiers
D52C15000580009
0 references