CONSTRUCTION WORK PERFORMING A MECHANICAL COUPLING BETWEEN THE STATION AREA AND PIAZZA MATTEOTTI (Q2023711): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Salerno / rank | |||
Normal rank |
Revision as of 16:55, 15 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION WORK PERFORMING A MECHANICAL COUPLING BETWEEN THE STATION AREA AND PIAZZA MATTEOTTI |
Project in Italy financed by DG Regio |
Statements
1,276,906.91 Euro
0 references
1,702,542.54 Euro
0 references
75.0 percent
0 references
25 March 2011
0 references
20 October 2017
0 references
31 March 2017
0 references
COMUNE DI VIETRI SUL MARE
0 references
L'OPERA IN PROGETTO Ê FINALIZZATA AD ISTITUIRE UN COLLEGAMENTO PEDONALE E MECCANIZZATO TRA LA PIAZZA CENTRALE DI VIETRI SUL MARE E LA STAZIONE FERROVIARIA, REALIZZATO CON UN SOTTOPASSO DELLA STRADA STATALE 18 ED UN IMPIANTO ASCENSORE ALLOCATO IN UNA GALLERIA VERTICALE CHE CONSENTE DI SUPERARE UN DISLIVELLO DI CIRCA 29 M. TALE IMPIANTO IMPLEMENTA IN MANIERA DETERMINANTE LA FRUIBILITà DEL SERVIZIO FERROVIARIO E LA FUNZIONALITà DELLA STAZIONE FERROVIARIA IL CUI ACCESSO Ê CRITICO SIA DAL PUNTO DI VISTA VEICOLARE CHE PEDONALE. (Italian)
0 references
THE PROJECT IS CARRIED OUT WITH THE AIM OF ESTABLISHING A MECHANISED AND PEDESTRIAN CONNECTION BETWEEN THE CENTRAL SQUARE OF VIETERS ON THE SEA AND THE RAILWAY STATION, WHICH IS CARRIED OUT WITH AN UNDERPASS OF STATE ROAD 18 AND AN LIFT INSTALLATION ALLOCATED IN A VERTICAL TUNNEL TO EXCEED A LEVEL OF APPROXIMATELY 29 M. THIS PLANT WILL MAKE A DECISIVE DIFFERENCE TO THE RAILWAY SERVICE AND THE OPERATION OF THE RAILWAY STATION THE ACCESS OF WHICH IS CRITICAL BOTH FROM THE POINT OF VIEW OF THE VEHICLE AND THE PEDESTRIAN. (English)
0 references
Identifiers
F11F14000010006
0 references