Improving the energy efficiency of the public utility building in Rudziniec at ul. Opolska 8 (Q4425695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding translation)
(‎Changed an Item: Import item from Poland)
Property / coordinate location
 
50°21'45.65"N, 18°29'7.80"E
Latitude50.3626831
Longitude18.485502441502
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 50°21'45.65"N, 18°29'7.80"E / rank
 
Normal rank
Property / coordinate location: 50°21'45.65"N, 18°29'7.80"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Gliwicki / rank
 
Normal rank

Revision as of 13:08, 25 October 2022

Project Q4425695 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of the public utility building in Rudziniec at ul. Opolska 8
Project Q4425695 in Poland

    Statements

    0 references
    449,306.4 zloty
    0 references
    99,880.81 Euro
    0 references
    528,595.76 zloty
    0 references
    117,506.84 Euro
    0 references
    85.0 percent
    0 references
    2 March 2020
    0 references
    15 July 2022
    0 references
    GMINA RUDZINIEC
    0 references

    50°21'45.65"N, 18°29'7.80"E
    0 references
    Projekt obejmuje kompleksową termomodernizację budynku użyteczności publicznej zlokalizowanego w Rudzińcu przy ul. Opolskiej 8, użytkowanego w celach statutowych przez Ludowy Klub Sportowy AMATOR RUDZINIEC oraz Ośrodek Pomocy Społecznej w Rudzińcu. W ramach termomodernizacji zaplanowano następujące rodzaje robót: - modernizacja instalacji c.o. i c.w.u. obejmująca: wymianę źródła ciepła - przestarzałego i nieefektywnego kotła węglowego na powietrzną pompę ciepła, - ocieplenie ścian zewnętrznych całego budynku, - ocieplenie dachu całego budynku, - wymiana okien w całym budynku, - wymiana drzwi zewnętrznych, - montaż instalacji fotowoltaicznej o mocy 14,96 kW Zaplanowany zakres prac przyczyni się zwiększenia efektywności energetycznej budynku oraz obniżenia emisji szkodliwych substancji do otoczenia. (Polish)
    0 references
    The project includes a comprehensive thermo-modernisation of the public utility building located in Rudziniec at ul. Opolska 8, used for statutory purposes by the AMATOR Rudziniec People’s Sports Club and the Social Welfare Centre in Rudziniec. As part of the thermomodernisation, the following types of works are planned: — modernisation of c.o. and c.w.u. installations including: replacement of a heat source — an outdated and inefficient coal boiler for an air heat pump, — warming the external walls of the entire building, — warming the roof of the entire building, — replacing windows in the entire building, — replacing external doors, — installation of a photovoltaic installation with a power of 14.96 kW The planned scope of works will contribute to increase the energy efficiency of the building and reduce emissions of harmful substances to the environment. (English)
    0 references
    The project includes a comprehensive thermo-modernisation of the public utility building located in Rudziniec at ul. Opolska 8, used for statutory purposes by the AMATOR Rudziniec People’s Sports Club and the Social Welfare Centre in Rudziniec. As part of the thermomodernisation, the following types of works are planned: — modernisation of c.o. and c.w.u. installations including: replacement of a heat source — an outdated and inefficient coal boiler for an air heat pump, — warming the external walls of the entire building, — warming the roof of the entire building, — replacing windows in the entire building, — replacing external doors, — installation of a photovoltaic installation with a power of 14.96 kW The planned scope of works will contribute to increase the energy efficiency of the building and reduce emissions of harmful substances to the environment. (English)
    0 references
    WOJ.: ŚLĄSKIE, POW.: gliwicki
    0 references

    Identifiers

    RPSL.04.03.01-24-0BG3/20
    0 references