Close-to-nature renewal of Sárbogárd by transforming the city centre with a “green” approach and expanding its functions (Q3948759): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 77.825658 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 499,426,037 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,381,017.87 Euro / rank | |||||||||||||||
Property / EU contribution: 1,381,017.87 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,381,017.87 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,754,225.837 Euro / rank | |||||||||||||||
Property / budget: 1,754,225.837 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 1,754,225.837 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 641,721,323.208 forint / rank | |||||||||||||||
Revision as of 16:09, 13 February 2022
Project Q3948759 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Close-to-nature renewal of Sárbogárd by transforming the city centre with a “green” approach and expanding its functions |
Project Q3948759 in Hungary |
Statements
1 September 2016
0 references
31 May 2019
0 references
SÁRBOGÁRD VÁROS ÖNKORMÁNYZAT
0 references
A projekt keretében Sárbogárd központi részének a teljes megújulása valósul meg, kifejezve az a 2011-ben az IVS-ben, majd a Településfejlesztési koncepciókban is rögzített városi jövőképet, amely szerint "Sárbogárd jó komfortérzetet biztosító életminőséget, fenntartható, egészséges környezetet nyújt lakosai számára, a javuló foglalkoztatás elérése érdekében pedig a helyi és a betelepülő vállalkozások számára vállalkozóbarát feltételeket teremt. A város a kistérség ipari, agrár-ipari fejlesztési és foglalkoztatási központjává válik". A jövőkép elérése érdekében a város két átfogó célt határozott meg: -A stagnáló gazdaság fellendítése, munkahelyteremtés -A város differenciált településjellegével (kisvárosias, falusias) harmonizáló környezet fenntartható fejlesztése A fejlesztés elsősorban ez utóbbi cél eléréséhez járul hozzá. A projekt konzorciumban Sárbogárd belváros akcióterületén valósul meg. Konzorciumi partnerek: Sárbogárd Város Önkormányzata, Echo Innovációs Műhely, Albensis Nonprofit Kft. Önállóan támogatható tevékenységek: A) Zöld város kialakítása: • Városközpont, a Hősök tere és környezete rendbetétele térbútorok elhelyezésével, fa és növénytelepítéssel, szökőkút építésével, a meglévő zöldfelület ápolásával, zöldfelület növelésével • Ady lakótelepen szabadtéri, rekreációs célokat szolgáló sportpálya létesítése, parkosítás • Ifjúsági park zöldfelületének rendbetétele (utcabútorok, közvilágítás, kerékpártároló), kültéri fitnesz és tornagépek telepítésével, futópálya létrehozásával B) Épületek klímatudatos felújítása: • Régi Községháza épületének energiatakarékos, klímatudatos (földhő) felújítása gazdaságélénkítési és közösségfejlesztő célból, az épület felújításához, a telepített új funkciókhoz kapcsolódóan az alapműködéshez szükséges eszközök beszerzése. Az épület tervezett funkciói a következők: játszó és fejlesztőközpont gyerekek számára, kávézó, antikvárium és könyvesbolt, ajándék és helyi termék bemutató és értékesítőhely, Közösségfejlesztési és tanácsadó iroda. Önállóan nem támogatható, választható tevékenységek: • Új, közösségi célú, gyeprácsos parkoló létesítése • Települési zöld infrastruktúra hálózat felmérése,feltérképezése, fejlesztési- és fenntartási akcióterv (zöldhálózatfejlesztési terv) • Nyilvános illemhely kialakítása a piac területén • A helyszínek (sportpálya, főtér, parkolók, ifjúsági park) közvilágításának energiatakarékos kialakítása illetve korszerűsítése • Kerékpár-tároló kialakítása (sportpálya, községháza, ifjúsági parkhoz kapcsolódóan) A fejlesztésre kerülő zöldfelületeken a csapadékvíz közvetlen hasznosításra kerül. Kötelezően megvalósítandó tevékenységek: • Környezeti szemléletváltást eredményező soft programok (bűnmegelőzés, települési identitás fejlesztése, arculat , környezettudatosság, közlekedésbiztonság) • Projektarányos akadálymentesítés • Kötelező tájékoztatás • Partnerségépítés Szórt azbeszt mentesítésére nincs szükség. A projekt keretében nem támogatható tevékenység nem valósul meg. A projektelőkészítés keretében elkészült az igényfelmérés és kihasználtsági terv, mely tartalmazza a vállalkozói, a civil és a lakossági szféra kérdőíves megkérdezését, a projekt ennek alapján került kidolgozásra. A tervezett projekt illeszkedik a megyei területfejlesztési stratégiában megfogalmazott célokhoz, ez részletesen az igényfelmérésben és a kihasználtsági tervben kerül bemutatásra. A projekt keretében megvalósuló kivitelezés, illetve a projekt révén létrejövő új munkahelyek lehetőséget fognak biztosítani az alacsony státuszú emberek számára az esetleges munkavállalásra. A projekt nem okozza az alacsony státuszú lakosság arányának növekedését a beruházást magában foglaló beavatkozási területen, és a város más területein sem járul hozzá az alacsony státuszú lakosság koncentrációjának növekedéséhez. A célok elérése érdekében és a felhívás előírásaival összhangban minden olyan tevékenységgel terveztünk, mely a projekt sikeres megvalósítását eredményezi. A beruházási költségvetés tervezése során takarékosságra törekedtünk, az építési költségek előzetes becslését szakember készítette. A városi területeken létrehozott vagy helyreállított nyitott terek: 23277 m2. Integrált Városfejlesztési Stratégiákba bevont területek lakossága: 12.000 fő Városi területen épített vagy renovált köz- és kereskedelmi épületek: 1 db épület, összesen 473,27 m2. Megújult vagy újonnan kialakított zöldfelület nagysága: 23777 m2 A projekt 2016. szeptember 1-én indul, 2018. május 31-én zárul. A projekt tervezett költsége: 499 426 037 Ft. (Hungarian)
0 references
As part of the project, the entire renewal of the central part of Sárbogárd will be realised, expressing the urban vision set out in the IVS in 2011 and then in the Urban Development Concepts, according to which "Sárbogárd provides a good quality of life, a sustainable and healthy environment for its inhabitants and creates business-friendly conditions for local and incoming businesses in order to achieve better employment. The city will become a centre for industrial, agri-industrial development and employment in the micro-region”. In order to achieve the vision, the city has set two overarching goals: —Relaunching the stagnating economy and creating jobs -Sustainable development of an environment that harmonises with the city’s differentiated settlement (small-urban, rural) character The development contributes primarily to the latter objective. The project is implemented in a consortium in the action area of downtown Sárbogárd. Consortium partners: Municipality of Sárbogárd City, Echo Innovation Workshop, Albensis Nonprofit Kft. Self-eligible activities: A) Building a Green City: • City centre, Heroes’ Square and surroundings by placing space furniture, wood and planting, building fountains, nurturing the existing green surface, increasing green surface • Establishing an open-air sports field for recreation purposes in the Ady housing estate, landscape management • Renovating the green surface of a youth park (street furniture, street lighting, bicycle storage), outdoor fitness and gym equipment, creating a runway B) • Energy-saving, climate-conscious (ground heat) renovation of the old Town Hall for economic recovery and community development purposes, purchase of the necessary tools for basic operation in connection with the renovation of the building and the new installed functions. The intended functions of the building are as follows: play and development center for children, café, antiquarium and bookshop, gift and local product presentation and sales site, community development and consulting office. Optional activities that are not eligible on their own: • Establishment of a new, community-based car park with grassroots facilities • Survey, mapping of the urban green infrastructure network, development and maintenance action plan (Green Network Development Plan) • Establishing a public toilet in the market area • Energy-saving development and modernisation of public lighting of the sites (sports track, main square, car park, youth park) • Construction of a bicycle storage (in connection with the sports track, village hall, youth park) The rainwater is used directly on the green surfaces to be developed. Mandatory activities: • Soft programs (crime prevention, urban identity development, image, environmental awareness, road safety) • Proportional accessibility • Compulsory information • Partnership building is not necessary to exempt scattered asbestos. The ineligible activity will not be implemented. As part of the project preparation, the needs assessment and utilisation plan was prepared, which includes questionnaires from the business, civil and public sectors, and the project was developed on this basis. The planned project is in line with the goals set out in the county’s regional development strategy, which is described in detail in the needs assessment and the utilisation plan. The implementation of the project and the new jobs created by the project will provide opportunities for people with low status to work. The project does not lead to an increase in the proportion of the low-status population in the intervention area involving the investment, nor does it contribute to an increase in the concentration of the low-status population in other areas of the city. In order to achieve the objectives and in accordance with the requirements of the call, we have planned all activities leading to the successful implementation of the project. During the planning of the investment budget, we tried to save money, the preliminary estimation of the construction costs was prepared by a specialist. Open spaces created or restored in urban areas: 23 277 m². Population of areas covered by integrated urban development strategies: 12,000 public and commercial buildings built or renovated in urban areas: 1 building, a total of 473.27 m². The size of a new or newly created green surface: 23 777 m² The project will start on 1 September 2016 and will end on 31 May 2018. Planned cost of the project: 499 426 037 HUF. (English)
9 February 2022
0 references
Dans le cadre du projet, tout le renouvellement de la partie centrale de Sárbogárd sera réalisé, en exprimant la vision urbaine définie dans l’IVS en 2011, puis dans les concepts de développement urbain, selon lesquels "Sárbogárd fournit une bonne qualité de vie, un environnement durable et sain pour ses habitants et crée des conditions favorables aux entreprises locales et entrantes afin de parvenir à un meilleur emploi. La ville deviendra un centre de développement industriel, agro-industriel et d’emploi dans la microrégion». Afin d’atteindre cette vision, la ville s’est fixé deux objectifs généraux: Relance de l’économie stagnante et création d’emplois -Développement durable d’un environnement qui s’harmonise avec le caractère différencié de la ville (petit-urbain, rural) Le développement contribue principalement à ce dernier objectif. Le projet est mis en œuvre dans un consortium dans la zone d’action du centre-ville de Sárbogárd. Partenaires du consortium: Municipalité de Sárbogárd Ville, Echo Atelier d’innovation, Albensis Sanprofit Kft. Activités auto-éligibles: A) Construire une ville verte: • Centre-ville, place des Héros et environs en plaçant des meubles d’espace, du bois et des plantations, en construisant des fontaines, en nourrissant la surface verte existante, en augmentant la surface verte • Établissement d’un terrain de sport en plein air à des fins récréatives dans le lotissement Ady, gestion du paysage • Rénover la surface verte d’un parc pour jeunes (meubles de rue, éclairage de rue, entreposage de vélos), matériel de remise en forme et de gymnase en plein air, création d’une piste B) • Rénovation de l’ancienne mairie, économe en énergie et soucieuse du climat (chaleur au sol) à des fins de relance économique et de développement communautaire, achat des outils nécessaires à l’exploitation de base dans le cadre de la rénovation du bâtiment et des nouvelles fonctions installées. Les fonctions prévues du bâtiment sont les suivantes: centre de jeux et de développement pour les enfants, café, antiquarium et librairie, site de présentation et de vente de cadeaux et de produits locaux, bureau de développement communautaire et de conseil. Activités facultatives qui ne sont pas éligibles à elles seules: • Mise en place d’un nouveau parking communautaire doté d’installations locales • Enquête, cartographie du réseau d’infrastructures vertes urbaines, plan d’action de développement et d’entretien (plan de développement du réseau vert) • Mise en place d’une toilette publique sur le marché • Développement des économies d’énergie et modernisation de l’éclairage public des sites (piste de sport, place principale, parking, parc pour les jeunes) • Construction d’un stockage de vélos (en liaison avec la piste de sport, la salle de village, le parc de la jeunesse) L’eau de pluie est utilisée directement sur les surfaces vertes à développer. Activités obligatoires: • Programmes souples (prévention de la criminalité, développement de l’identité urbaine, image, sensibilisation à l’environnement, sécurité routière) • Accessibilité proportionnelle • Informations obligatoires • La création de partenariats n’est pas nécessaire pour exempter l’amiante dispersé. L’activité non admissible ne sera pas mise en œuvre. Dans le cadre de la préparation du projet, le plan d’évaluation et d’utilisation des besoins a été élaboré, qui comprend des questionnaires provenant des secteurs privé, civil et public, et le projet a été élaboré sur cette base. Le projet prévu est conforme aux objectifs définis dans la stratégie de développement régional du comté, qui est décrite en détail dans l’évaluation des besoins et le plan d’utilisation. La mise en œuvre du projet et les nouveaux emplois créés par le projet permettront aux personnes de faible statut de travailler. Le projet n’entraîne pas une augmentation de la proportion de la population de bas statut dans la zone d’intervention impliquant l’investissement, ni une augmentation de la concentration de la population de faible statut dans d’autres zones de la ville. Afin d’atteindre les objectifs et conformément aux exigences de l’appel, nous avons planifié toutes les activités menant à la mise en œuvre réussie du projet. Lors de la planification du budget d’investissement, nous avons essayé d’économiser de l’argent, l’estimation préliminaire des coûts de construction a été préparée par un spécialiste. Espaces ouverts créés ou restaurés en zone urbaine: 23 277 m². Population des zones couvertes par des stratégies intégrées de développement urbain: 12 000 bâtiments publics et commerciaux construits ou rénovés en zone urbaine: 1 bâtiment, un total de 473,27 m². La taille d’une surface verte nouvelle ou nouvellement créée: 23 777 m² Le projet débutera le 1er septembre 2016 et prendra fin le 31 mai 2018. Coût prévu du projet: 499 426 037 HUF. (French)
10 February 2022
0 references
Sárbogárd, Fejér
0 references
Identifiers
TOP-2.1.2-15-FE1-2016-00008
0 references