Development of Bajna rainwater drainage (Q3949487): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The aid application shall be as set out in point 1.2 of the Area-specific Annex: The indicative allocation for municipalities with a population of less than 5 000 people is to be implemented from a financial envelope. The objective of the project in the area of implementation of the project is: • protection of natural assets through mitigation of damage, • protection of basic municipal (transport) infrastructure from water damage, • improvement of the state of public areas (cleaning, sediments containing polluting substances are not deposited) thus preserving the existing state, • ensuring equal opportunities — the same opportunities (primarily inhabitability, infrastructural) are provided for residents living in the affected project area; as in the case of residents not affected by water damage • the risk of inner-area facilities (cellar, courtyard, house and other outbuilding flooding) ceases, thus the quality of life in the settlement is improved • the prevention of rainwater causing significant material damage, which has previously been burdened by the local government, the population and the affected businesses (a huge amount of maintenance and cleaning costs) The planned development will be carried out in the inner area of the settlement with the status of Bajna. The investment concerns Szabadság Street and Jókai Road in the interior of the settlement. The ditch system of the gravitational rainwater in Bajna is responsible for transmitting the quantity collected from the catchment area to the recipients, and although it can perform its task in most parts of the municipality, there are problems in the discharge of water flow as a result of major rainfall events in certain parts of the settlement. The aim of the planned technical solutions is to ensure the safe introduction of rainfall in the design area into the reception area, to improve the comfort of those living in the area during average rains, and to protect the interior and properties from water damage in case of larger rains. Planned interventions of site A: 1. Partial restoration of the drainage ditch on either side of Szabadság Street to ensure the carefree drainage of the collected water. 2. Rebuilding an existing passage, taking into account the appropriate fall conditions. Planned interventions of site B: 1. Restoration/construction of the pavement of stone pavement in concrete from the pavement of covered rainwater on the east side of Jókai Street. 2. On the trail after the bus stop, the mowing and partial restoration of the ground-bead ditch. The total length of the investment is 331 metres. (English) | |||||||||||||||
Property / summary: The aid application shall be as set out in point 1.2 of the Area-specific Annex: The indicative allocation for municipalities with a population of less than 5 000 people is to be implemented from a financial envelope. The objective of the project in the area of implementation of the project is: • protection of natural assets through mitigation of damage, • protection of basic municipal (transport) infrastructure from water damage, • improvement of the state of public areas (cleaning, sediments containing polluting substances are not deposited) thus preserving the existing state, • ensuring equal opportunities — the same opportunities (primarily inhabitability, infrastructural) are provided for residents living in the affected project area; as in the case of residents not affected by water damage • the risk of inner-area facilities (cellar, courtyard, house and other outbuilding flooding) ceases, thus the quality of life in the settlement is improved • the prevention of rainwater causing significant material damage, which has previously been burdened by the local government, the population and the affected businesses (a huge amount of maintenance and cleaning costs) The planned development will be carried out in the inner area of the settlement with the status of Bajna. The investment concerns Szabadság Street and Jókai Road in the interior of the settlement. The ditch system of the gravitational rainwater in Bajna is responsible for transmitting the quantity collected from the catchment area to the recipients, and although it can perform its task in most parts of the municipality, there are problems in the discharge of water flow as a result of major rainfall events in certain parts of the settlement. The aim of the planned technical solutions is to ensure the safe introduction of rainfall in the design area into the reception area, to improve the comfort of those living in the area during average rains, and to protect the interior and properties from water damage in case of larger rains. Planned interventions of site A: 1. Partial restoration of the drainage ditch on either side of Szabadság Street to ensure the carefree drainage of the collected water. 2. Rebuilding an existing passage, taking into account the appropriate fall conditions. Planned interventions of site B: 1. Restoration/construction of the pavement of stone pavement in concrete from the pavement of covered rainwater on the east side of Jókai Street. 2. On the trail after the bus stop, the mowing and partial restoration of the ground-bead ditch. The total length of the investment is 331 metres. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aid application shall be as set out in point 1.2 of the Area-specific Annex: The indicative allocation for municipalities with a population of less than 5 000 people is to be implemented from a financial envelope. The objective of the project in the area of implementation of the project is: • protection of natural assets through mitigation of damage, • protection of basic municipal (transport) infrastructure from water damage, • improvement of the state of public areas (cleaning, sediments containing polluting substances are not deposited) thus preserving the existing state, • ensuring equal opportunities — the same opportunities (primarily inhabitability, infrastructural) are provided for residents living in the affected project area; as in the case of residents not affected by water damage • the risk of inner-area facilities (cellar, courtyard, house and other outbuilding flooding) ceases, thus the quality of life in the settlement is improved • the prevention of rainwater causing significant material damage, which has previously been burdened by the local government, the population and the affected businesses (a huge amount of maintenance and cleaning costs) The planned development will be carried out in the inner area of the settlement with the status of Bajna. The investment concerns Szabadság Street and Jókai Road in the interior of the settlement. The ditch system of the gravitational rainwater in Bajna is responsible for transmitting the quantity collected from the catchment area to the recipients, and although it can perform its task in most parts of the municipality, there are problems in the discharge of water flow as a result of major rainfall events in certain parts of the settlement. The aim of the planned technical solutions is to ensure the safe introduction of rainfall in the design area into the reception area, to improve the comfort of those living in the area during average rains, and to protect the interior and properties from water damage in case of larger rains. Planned interventions of site A: 1. Partial restoration of the drainage ditch on either side of Szabadság Street to ensure the carefree drainage of the collected water. 2. Rebuilding an existing passage, taking into account the appropriate fall conditions. Planned interventions of site B: 1. Restoration/construction of the pavement of stone pavement in concrete from the pavement of covered rainwater on the east side of Jókai Street. 2. On the trail after the bus stop, the mowing and partial restoration of the ground-bead ditch. The total length of the investment is 331 metres. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 13:36, 9 February 2022
Project Q3949487 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of Bajna rainwater drainage |
Project Q3949487 in Hungary |
Statements
34,971,000 forint
0 references
106,219.579 Euro
0.0027336256 Euro
15 December 2021
0 references
38,856,666.667 forint
0 references
90.0 percent
0 references
1 July 2020
0 references
30 September 2021
0 references
Bajna Község Önkormányzata
0 references
Q3980743 (Deleted Item)
0 references
A Támogatási kérelem a Területspecifikus melléklet 1.2 pontjában szereplő: Az 5000 fő lakosságszám alatti települések számára elkülönített indikatív keretösszeg forráskeretből szeretnénk megvalósítani. A projekt célja a projekt megvalósításának térségében: • természeti értékek védelme a károk enyhítésén keresztül, • települési (közlekedési) alapinfrastruktúra vízkároktól történő megóvása, • közterületek állapotának javulása (tisztántartás, szennyező anyagokat is tartalmazó hordalékok nem rakódnak le) így a meglévő állapot megóvása valósul meg, • esélyegyenlőség biztosítása – az érintett projektterületen élő lakosok számára is ugyanazon (elsősorban lakhatósági, infrastrukturális) lehetőségek biztosítottak, mint a vízkár által nem érintett lakosok esetében • a belterületi létesítmények veszélyeztetettsége (pince-, udvar-, ház-, egyéb melléképület-elöntések) megszűnik, ekként a településrészben az életminőség javul • a jelentős anyagi károkat okozó csapadékvíz kivédése, amely korábban az önkormányzatot, a lakosságot, ill. az érintett vállalkozásokat egyaránt terhelte (karbantartási, tisztítási költség tetemes mértéke) A tervezett fejlesztés Bajna községi jogállású település belterületén valósul meg. A beruházás a település belterületén a Szabadság utcát, valamint a Jókai utat érinti. Bajna település gravitációs csapadékvíz elvezető árokrendszere a vízgyűjtőterületről összegyűjtött mennyiség befogadók irányába történő továbbításáért felel, és bár feladatát többségben el tudja látni, azonban a település egyes részein a nagyobb csapadékesemények következményeként fellépő vízhozam-elvezetési problémák jelentkeznek. A tervezett műszaki megoldások célja a tervezési területre lehulló csapadék biztonságos bevezetése a befogadóba, átlagos esőzések idején a területen élők komfortérzetének javítása, nagyobb esőzésekkor a belterület és az ingatlanok megóvása a vízkártól. Az „A” helyszín tervezett beavatkozásai: 1. A Szabadság utca két oldalán található csapadékvíz elvezető árok burkolatának részleges helyreállítása az összegyűjtött vizek gondtalan elvezetésének érdekében. 2. Meglévő áteresz átépítése, a megfelelő esésviszonyok figyelembevételével. „B” helyszín tervezett beavatkozásai: 1. A Jókai utca keleti oldalán meglévő burkolt csapadékvíz elvezető árok betonba rakott terméskő burkolatának helyreállítása/kialakítása. 2. A buszmegálló utáni nyomvonalon a földmedrű árok kaszálása, részleges helyreállítása. A beruházás keretében összesen 331 méterhossz épül. (Hungarian)
0 references
The aid application shall be as set out in point 1.2 of the Area-specific Annex: The indicative allocation for municipalities with a population of less than 5 000 people is to be implemented from a financial envelope. The objective of the project in the area of implementation of the project is: • protection of natural assets through mitigation of damage, • protection of basic municipal (transport) infrastructure from water damage, • improvement of the state of public areas (cleaning, sediments containing polluting substances are not deposited) thus preserving the existing state, • ensuring equal opportunities — the same opportunities (primarily inhabitability, infrastructural) are provided for residents living in the affected project area; as in the case of residents not affected by water damage • the risk of inner-area facilities (cellar, courtyard, house and other outbuilding flooding) ceases, thus the quality of life in the settlement is improved • the prevention of rainwater causing significant material damage, which has previously been burdened by the local government, the population and the affected businesses (a huge amount of maintenance and cleaning costs) The planned development will be carried out in the inner area of the settlement with the status of Bajna. The investment concerns Szabadság Street and Jókai Road in the interior of the settlement. The ditch system of the gravitational rainwater in Bajna is responsible for transmitting the quantity collected from the catchment area to the recipients, and although it can perform its task in most parts of the municipality, there are problems in the discharge of water flow as a result of major rainfall events in certain parts of the settlement. The aim of the planned technical solutions is to ensure the safe introduction of rainfall in the design area into the reception area, to improve the comfort of those living in the area during average rains, and to protect the interior and properties from water damage in case of larger rains. Planned interventions of site A: 1. Partial restoration of the drainage ditch on either side of Szabadság Street to ensure the carefree drainage of the collected water. 2. Rebuilding an existing passage, taking into account the appropriate fall conditions. Planned interventions of site B: 1. Restoration/construction of the pavement of stone pavement in concrete from the pavement of covered rainwater on the east side of Jókai Street. 2. On the trail after the bus stop, the mowing and partial restoration of the ground-bead ditch. The total length of the investment is 331 metres. (English)
9 February 2022
0 references
Bajna, Komárom-Esztergom
0 references
Identifiers
TOP-2.1.3-16-KO1-2020-00029
0 references