Improvement of the living environment of buildings on the territory of the city of Devin — introduction of energy-efficient measures at the building of the Fire Safety and Protection of the Population District Office (Q3884873): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
Improvement of the living environment of buildings on the territory of the city of Devin — introduction of energy-efficient measures at the building of the Fire Safety and Protection of the Population District Office
Property / summary
 
The building, which is the subject of intervention under the project, is state-owned and houses the District Office “Fire Safety and Protection of the Population” — Devin. It was built and commissioned in 1983. It is a public building on 3 floors and has a monolithic construction. The roof is 3 types: sloppy with and without air gap and flat without air gap. The outer walls are brick and reinforced concrete with plaster. The joinery of the object is metal, PVC and wooden. The floor is to ground and outdoor air. Heat source is its own boiler system located in the basement of the building. The boiler was manufactured and installed in 2015. The planned energy saving measures include implementation of:1. Thermal insulation of external walls 2. Thermal insulation of a roof3. Thermal insulation of the floor4. Replacement of the old windows with PVC/Al profile system and glazing5. Replacement of the water heating system6. Replacement of lighting (English)
Property / summary: The building, which is the subject of intervention under the project, is state-owned and houses the District Office “Fire Safety and Protection of the Population” — Devin. It was built and commissioned in 1983. It is a public building on 3 floors and has a monolithic construction. The roof is 3 types: sloppy with and without air gap and flat without air gap. The outer walls are brick and reinforced concrete with plaster. The joinery of the object is metal, PVC and wooden. The floor is to ground and outdoor air. Heat source is its own boiler system located in the basement of the building. The boiler was manufactured and installed in 2015. The planned energy saving measures include implementation of:1. Thermal insulation of external walls 2. Thermal insulation of a roof3. Thermal insulation of the floor4. Replacement of the old windows with PVC/Al profile system and glazing5. Replacement of the water heating system6. Replacement of lighting (English) / rank
 
Normal rank
Property / summary: The building, which is the subject of intervention under the project, is state-owned and houses the District Office “Fire Safety and Protection of the Population” — Devin. It was built and commissioned in 1983. It is a public building on 3 floors and has a monolithic construction. The roof is 3 types: sloppy with and without air gap and flat without air gap. The outer walls are brick and reinforced concrete with plaster. The joinery of the object is metal, PVC and wooden. The floor is to ground and outdoor air. Heat source is its own boiler system located in the basement of the building. The boiler was manufactured and installed in 2015. The planned energy saving measures include implementation of:1. Thermal insulation of external walls 2. Thermal insulation of a roof3. Thermal insulation of the floor4. Replacement of the old windows with PVC/Al profile system and glazing5. Replacement of the water heating system6. Replacement of lighting (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:45, 2 December 2021

Project Q3884873 in Bulgaria
Language Label Description Also known as
English
Improvement of the living environment of buildings on the territory of the city of Devin — introduction of energy-efficient measures at the building of the Fire Safety and Protection of the Population District Office
Project Q3884873 in Bulgaria

    Statements

    0 references
    357,570.35 Bulgarian lev
    0 references
    182,360.88 Euro
    1 December 2021
    0 references
    420,671.0 Bulgarian lev
    0 references
    214,542.21 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    1 September 2016
    0 references
    12 November 2018
    0 references
    0 references
    Сградата, обект на интервенция по проекта е държавна собственост и в нея се помещава Районна служба "Пожарна безопасност и защита на населението" - гр. Девин. Тя е построена и въведена в експлоатация през 1983 г. Представлява обществена сграда на 3 етажа и има монолитна конструкция. Покривът е 3 типа: скатен с и без въздушна междина и плосък без въздушна междина. Външните стени са тухлени и стоманобетонови с мазилка. Дограмата на обекта е метална, ПВЦ и дървена. Подът е към земя и външен въздух. Топлинен източник е собствена котелна инсталация, разположена в сутерена на сградата. Котелът е произведен и монтиран през 2015 г.Предвидените енергоспестяващи мерки включват изпълнение на:1. Топлинно изолиране на външните стени 2. Топлинно изолиране на покрив3. Топлинно изолиране на пода4. Подмяна на старата дограма със система от PVC/Al профил и стъклопакет5. Подмяна на водната отоплителна инсталация6. Подмяна на осветление (Bulgarian)
    0 references
    The building, which is the subject of intervention under the project, is state-owned and houses the District Office “Fire Safety and Protection of the Population” — Devin. It was built and commissioned in 1983. It is a public building on 3 floors and has a monolithic construction. The roof is 3 types: sloppy with and without air gap and flat without air gap. The outer walls are brick and reinforced concrete with plaster. The joinery of the object is metal, PVC and wooden. The floor is to ground and outdoor air. Heat source is its own boiler system located in the basement of the building. The boiler was manufactured and installed in 2015. The planned energy saving measures include implementation of:1. Thermal insulation of external walls 2. Thermal insulation of a roof3. Thermal insulation of the floor4. Replacement of the old windows with PVC/Al profile system and glazing5. Replacement of the water heating system6. Replacement of lighting (English)
    2 December 2021
    0 references
    Девин
    0 references

    Identifiers

    BG16RFOP001-2.001-0033
    0 references