Modernisation of the Sofia-Plovdiv railway line: railway section Elin Pelin — Kostenets | |||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to modernise the railway infrastructure on the Elin Pelin-Kostenets section, as required by the TSI and Regulation (EU) No 1315/2013 for the core network of rail transport infrastructure corridors. The implementation of the project will contribute to the development of Corridor Orient/Eastern-Mediterranean, passing through Bulgaria, part of which is the railway line Sofia — Elin Pelin — Kostenets — Septemvri — Plovdiv. The starting and end points of the railway section are respectively: km 22+ 554 to km 73+ 598. The project includes the following main components:- Modernisation of about 51.044 km double railway line for speed 160 km/h for passenger trains and 120 km/h for freight trains, in full compliance with the requirements of the TSI, including:- Renewal of 14.544 km double railway line;- Construction of 36.5 km double railway line;- Extension of platforms in stations and construction of pedestrian overpasses; including providing an accessible environment for people with disabilities;- Reconstruction of reception facilities Elin Pelin and Ihtiman;- Construction of new stops Pobit stone, Vakarel South and Verinsko;- Reconstruction of platforms on 2 existing stops — Stambolovo and Nemirovo;- Closing 4 existing level crossings and replacing them with road overpasses; refurbishment and new construction of 24 bridges and viaducts;- Construction of one-way (two-pipe) tunnels with a total length of 15.4 km;- Construction of 8 two-way tunnels with a total length of 5.48 km;- Construction of new overhead contact line 50 Hz, 25 kV;- Construction of 2 new traction substations and 2 new separate posts;- Installation of 3 new route-computer centralisations at Elin Pelin, Vakarel South and Ihtiman Station. (English) | |||||||||||||||
Property / summary: The aim of the project is to modernise the railway infrastructure on the Elin Pelin-Kostenets section, as required by the TSI and Regulation (EU) No 1315/2013 for the core network of rail transport infrastructure corridors. The implementation of the project will contribute to the development of Corridor Orient/Eastern-Mediterranean, passing through Bulgaria, part of which is the railway line Sofia — Elin Pelin — Kostenets — Septemvri — Plovdiv. The starting and end points of the railway section are respectively: km 22+ 554 to km 73+ 598. The project includes the following main components:- Modernisation of about 51.044 km double railway line for speed 160 km/h for passenger trains and 120 km/h for freight trains, in full compliance with the requirements of the TSI, including:- Renewal of 14.544 km double railway line;- Construction of 36.5 km double railway line;- Extension of platforms in stations and construction of pedestrian overpasses; including providing an accessible environment for people with disabilities;- Reconstruction of reception facilities Elin Pelin and Ihtiman;- Construction of new stops Pobit stone, Vakarel South and Verinsko;- Reconstruction of platforms on 2 existing stops — Stambolovo and Nemirovo;- Closing 4 existing level crossings and replacing them with road overpasses; refurbishment and new construction of 24 bridges and viaducts;- Construction of one-way (two-pipe) tunnels with a total length of 15.4 km;- Construction of 8 two-way tunnels with a total length of 5.48 km;- Construction of new overhead contact line 50 Hz, 25 kV;- Construction of 2 new traction substations and 2 new separate posts;- Installation of 3 new route-computer centralisations at Elin Pelin, Vakarel South and Ihtiman Station. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to modernise the railway infrastructure on the Elin Pelin-Kostenets section, as required by the TSI and Regulation (EU) No 1315/2013 for the core network of rail transport infrastructure corridors. The implementation of the project will contribute to the development of Corridor Orient/Eastern-Mediterranean, passing through Bulgaria, part of which is the railway line Sofia — Elin Pelin — Kostenets — Septemvri — Plovdiv. The starting and end points of the railway section are respectively: km 22+ 554 to km 73+ 598. The project includes the following main components:- Modernisation of about 51.044 km double railway line for speed 160 km/h for passenger trains and 120 km/h for freight trains, in full compliance with the requirements of the TSI, including:- Renewal of 14.544 km double railway line;- Construction of 36.5 km double railway line;- Extension of platforms in stations and construction of pedestrian overpasses; including providing an accessible environment for people with disabilities;- Reconstruction of reception facilities Elin Pelin and Ihtiman;- Construction of new stops Pobit stone, Vakarel South and Verinsko;- Reconstruction of platforms on 2 existing stops — Stambolovo and Nemirovo;- Closing 4 existing level crossings and replacing them with road overpasses; refurbishment and new construction of 24 bridges and viaducts;- Construction of one-way (two-pipe) tunnels with a total length of 15.4 km;- Construction of 8 two-way tunnels with a total length of 5.48 km;- Construction of new overhead contact line 50 Hz, 25 kV;- Construction of 2 new traction substations and 2 new separate posts;- Installation of 3 new route-computer centralisations at Elin Pelin, Vakarel South and Ihtiman Station. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 22:22, 2 December 2021
Project Q3881401 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the Sofia-Plovdiv railway line: railway section Elin Pelin — Kostenets |
Project Q3881401 in Bulgaria |
Statements
458,572,600.62 Bulgarian lev
0 references
1,084,999,272.24 Bulgarian lev
0 references
0.42 percent
0 references
1 January 2016
0 references
31 December 2023
0 references
Целта на проекта е модернизацията на железопътната инфраструктура в участъка Елин Пелин - Костенец, съгласно изискванията на ТСОС и на Регламент (ЕС) №1315/2013 за Основната мрежа от коридори на железопътната транспортна инфраструктура. Изпълнението на проекта ще допринесе за развитието на коридор Ориент/Източно - Средиземноморски, преминаващ през България, част от който е железопътната линия София - Елин Пелин - Костенец - Септември - Пловдив. Началната и крайна точка на жп участъка са съответно: км 22+554 до км 73+598. Проектът включва следните основни компоненти:- Модернизация на около 51.044 км двойна железопътна линия за скорост 160 км/ч за пътнически влакове и 120 км/ч за товари влакове, в пълно съответствие на изискванията на ТСОС, включваща:- Подновяване на 14.544 км двойна железопътна линия;- Изграждане на 36,5 км двойна железопътна линия;- Разширяване на пероните в гарите и изграждането на пешеходни надлези, включително осигуряване на достъпна среда за хора с увреждания;- Реконструкция на приемни здания Елин Пелин и Ихтиман;- Изграждане на нови спирки Побит камък, Вакарел юг и Веринско;- Реконструкция на пероните на 2 съществуващи спирки - Стамболово и Немирово;- Закриване на 4 съществуващи жп прелеза и подмяната им с пътни надлези;- Подновяване и ново строителство на 24 моста и виадукти;- Изграждане на еднопътни (двутръбни) тунела с обща дължина от двете тръби 15,4 км;- Изграждане на 8 двупътни (еднотръбни) тунела с обща дължина 5,48 км;- Изграждане на нова въздушна контактна линия 50 Hz, 25 kV;- Изграждане на 2 нови тягови подстанции и 2 нови разделни поста;- Монтаж на 3 нови маршрутно-компютърни централизации на гара Елин Пелин, Вакарел юг и гара Ихтиман. (Bulgarian)
0 references
The aim of the project is to modernise the railway infrastructure on the Elin Pelin-Kostenets section, as required by the TSI and Regulation (EU) No 1315/2013 for the core network of rail transport infrastructure corridors. The implementation of the project will contribute to the development of Corridor Orient/Eastern-Mediterranean, passing through Bulgaria, part of which is the railway line Sofia — Elin Pelin — Kostenets — Septemvri — Plovdiv. The starting and end points of the railway section are respectively: km 22+ 554 to km 73+ 598. The project includes the following main components:- Modernisation of about 51.044 km double railway line for speed 160 km/h for passenger trains and 120 km/h for freight trains, in full compliance with the requirements of the TSI, including:- Renewal of 14.544 km double railway line;- Construction of 36.5 km double railway line;- Extension of platforms in stations and construction of pedestrian overpasses; including providing an accessible environment for people with disabilities;- Reconstruction of reception facilities Elin Pelin and Ihtiman;- Construction of new stops Pobit stone, Vakarel South and Verinsko;- Reconstruction of platforms on 2 existing stops — Stambolovo and Nemirovo;- Closing 4 existing level crossings and replacing them with road overpasses; refurbishment and new construction of 24 bridges and viaducts;- Construction of one-way (two-pipe) tunnels with a total length of 15.4 km;- Construction of 8 two-way tunnels with a total length of 5.48 km;- Construction of new overhead contact line 50 Hz, 25 kV;- Construction of 2 new traction substations and 2 new separate posts;- Installation of 3 new route-computer centralisations at Elin Pelin, Vakarel South and Ihtiman Station. (English)
2 December 2021
0 references
Югозападен
0 references
Identifiers
BG16M1OP001-1.001-0004
0 references