Q3428272 (Q3428272): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): Potential weaknesses in the area will be identified, in particular with regard to the optimisation of internal management processes. A detailed plan for optimising and structuring the work processes is then to be drawn up., translated_summary)
Property / summary
 
Potential weaknesses in the area will be identified, in particular with regard to the optimisation of internal management processes. A detailed plan for optimising and structuring the work processes is then to be drawn up. (English)
Property / summary: Potential weaknesses in the area will be identified, in particular with regard to the optimisation of internal management processes. A detailed plan for optimising and structuring the work processes is then to be drawn up. (English) / rank
 
Normal rank
Property / summary: Potential weaknesses in the area will be identified, in particular with regard to the optimisation of internal management processes. A detailed plan for optimising and structuring the work processes is then to be drawn up. (English) / qualifier
 
point in time: 16 November 2021
Timestamp+2021-11-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:26, 16 November 2021

Project Q3428272 in Germany
Language Label Description Also known as
English
No label defined
Project Q3428272 in Germany

    Statements

    0 references
    4 January 2020
    0 references
    7 September 2020
    0 references
    Wohncenter Greifswald GmbH
    0 references
    0 references
    0 references

    53°46'24.64"N, 12°34'31.98"E
    0 references
    Vor allem im Hinblick auf die Optimierung unternehmensinterner Prozesse der Verwaltung sollen mögliche Schwachstellen im Bereich aufgezeigt werden. Anschließend soll ein detaillierter Plan zur Optimierung u Strukturierung der Arbeitsprozesse erarbei (German)
    0 references
    Potential weaknesses in the area will be identified, in particular with regard to the optimisation of internal management processes. A detailed plan for optimising and structuring the work processes is then to be drawn up. (English)
    16 November 2021
    0 references
    Mecklenburg-Vorpommern
    0 references

    Identifiers

    DE_TEMPORARY_ESF_24727
    0 references