LPW-E/2.2.1/23 — Walter Otto Müller GmbH & Co. KG — Expansion of the capacity of a permanent establishment without building DAP in Itzehoe (Q3333158): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Installation of an innovative surface treatment plant (galvanics) with automatically controlled transport facility, wastewater treatment. The electroplating has so far been carried out in manual mode; the new plant leads to a significant increase in capacity. The measure is linked to an extension of the hall area. In addition, the range of offers is extended by investing in labelling systems., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
LPW-E/2.2.1/23 — Walter Otto Müller GmbH & Co. KG — Expansion of the capacity of a permanent establishment without building DAP in Itzehoe

Revision as of 08:29, 25 October 2021

Project Q3333158 in Germany
Language Label Description Also known as
English
LPW-E/2.2.1/23 — Walter Otto Müller GmbH & Co. KG — Expansion of the capacity of a permanent establishment without building DAP in Itzehoe
Project Q3333158 in Germany

    Statements

    0 references
    1,644,028.33 Euro
    0 references
    Walter Otto Müller GmbH & Co.KG
    0 references
    25524 Itzehoe
    0 references
    Installation einer innovativen Oberflächenbehandlungsanlage (Galvanik) mit automatisch gesteuerter Transporteinrichtung, Abwasserbehandlung. Die Galvanik wurde bisher im Handbetrieb durchgeführt; die neue Anlage führt zu einer wesentlichen Kapazitätserweiterung. Mit der Maßnahme verbunden ist eine Erweiterung der Hallenfläche. Zusätzlich wird durch Investition in Beschriftungssysteme die Angebotspalette erweitert. (German)
    0 references
    Installation of an innovative surface treatment plant (galvanics) with automatically controlled transport facility, wastewater treatment. The electroplating has so far been carried out in manual mode; the new plant leads to a significant increase in capacity. The measure is linked to an extension of the hall area. In addition, the range of offers is extended by investing in labelling systems. (English)
    25 October 2021
    0 references

    Identifiers

    DE_TEMPORARY_35803
    0 references