Q3313012 (Q3313012): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): Expansion of the production building and installation of further production lines as well as redesign of in-house logistics., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Expansion of the production building and installation of further production lines as well as redesign of in-house logistics. (English) | |||||||||||||||
Property / summary: Expansion of the production building and installation of further production lines as well as redesign of in-house logistics. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Expansion of the production building and installation of further production lines as well as redesign of in-house logistics. (English) / qualifier | |||||||||||||||
point in time: 25 October 2021
|
Revision as of 22:20, 24 October 2021
Project Q3313012 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3313012 in Germany |
Statements
775,473.1 Euro
0 references
3,047,045.59 Euro
0 references
25.45 percent
0 references
25 July 2016
0 references
30 June 2019
0 references
Schäfer Trennwandsysteme GmbH
0 references
56593
0 references
Erweiterung des Produktionsgebäudes und Installation weiterer Produktionslinien sowie Neukonzeptionierung der innerbetrieblichen Logistik. (German)
0 references
Expansion of the production building and installation of further production lines as well as redesign of in-house logistics. (English)
25 October 2021
0 references
Altenkirchen (Westerwald)
0 references
Identifiers
DE_TEMPORARY_15799
0 references