Q3309132 (Q3309132): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Created claim: summary (P836): Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system, translated_summary)
Property / summary
 
Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English)
Property / summary: Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English) / rank
 
Normal rank
Property / summary: Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English) / qualifier
 
point in time: 24 October 2021
Timestamp+2021-10-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:17, 24 October 2021

Project Q3309132 in Germany
Language Label Description Also known as
English
No label defined
Project Q3309132 in Germany

    Statements

    0 references
    733.33 Euro
    0 references
    122,222.06 Euro
    0 references
    0.6 percent
    0 references
    15 May 2017
    0 references
    31 December 2018
    0 references
    Stiftung Maribondo da Floresta
    0 references

    53°15'37.62"N, 8°44'36.64"E
    0 references
    Errichtung einer schnell ladenden Stromtankstelle und fünf normal ladenden Wallboxen nebst Erweiterung einer bestehenden Photovoltaikanlage (German)
    0 references
    Construction of a fast-charging power station and five normal charging wallboxes along with an extension of an existing photovoltaic system (English)
    24 October 2021
    0 references
    Osterholz
    0 references

    Identifiers

    DE_TEMPORARY_11917
    0 references