Rain promenade and bridge Mitterdorf with integrated flood protection — Rain bridge (Q3298073): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Cham / rank | |||
Normal rank |
Revision as of 19:35, 24 October 2021
Project Q3298073 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Rain promenade and bridge Mitterdorf with integrated flood protection — Rain bridge |
Project Q3298073 in Germany |
Statements
4,848,000.0 Euro
0 references
18 December 2020
0 references
30 November 2022
0 references
Stadt Roding
0 references
Bau eines Fuß- und Radweges als Verbindung zwischen Hauptort und Ortsteil Mitterdorf als Teil der Aufwertung des Regenufers mit Hochwasserschutz. (German)
0 references
Construction of a footpath and cycle path as a link between the main town and the village of Mitterdorf as part of the upgrading of the rain bank with flood protection. (English)
24 October 2021
0 references
Roding , Regen
0 references
Identifiers
DE_TEMPORARY_870
0 references