Agglomeration Podbrezová sewerage (Q3100613): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The aim of the project is to improve the collection and treatment of urban waste water in the Podbrezová agglomeration, in the district of Brezno, which is included in Annex 7 ‘Calls’ and is not in line with the requirements of Council Directive 91/271/EEC. Sewage sewerage and sewage treatment plant will be dealt with in the agglomeration. Incomplete sewerage network and insufficient treatment of waste water threatens surface and groundwater in...) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Agglomération Podbrezová — assainissement |
Revision as of 12:55, 27 November 2021
Project Q3100613 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Agglomeration Podbrezová sewerage |
Project Q3100613 in Slovakia |
Statements
4,719,530.63 Euro
0 references
5,552,388.98 Euro
0 references
85.0 percent
0 references
1 March 2017
0 references
1 April 2022
0 references
Stredoslovenská vodárenská spoločnosť, a.s.
0 references
Cieľom projektu je zlepšenie odvádzania a čistenia komunálnych odpadových vôd v aglomerácii Podbrezová, v okrese Brezno, ktorá je zaradená v Prílohe č. 7 Výzvy a je v nesúlade s požiadavkami vyplývajúcimi zo smernice Rady 91/271/EHS. V aglomerácii bude riešená splašková kanalizácia a čistiareň odpadových vôd. Nedobudovaná kanalizačná sieť a nedostatočné čistenie odpadových vôd ohrozuje povrchové i podzemné vody v povodí rieky Hron, ohrozuje kvalitu životného prostredia a životné podmienky obyvateľstva.Cieľ projektu bude zabezpečený prostredníctvom 2 hlavných aktivít projektu:a) stoková sieť ab) čistiareň odpadových vôd.V obci Podbrezová je kanalizácia vybudovaná čiastočne. Nakoľko sa obec skladá z viacerých častí, ktoré tvoria samostatné celky a rozkladá sa v pomerne členitom území, nie je možné jej odkanalizovanie ako celku. V rámci hlavnej aktivity stoková sieť bude vybudovaná splašková kanalizácia v časti Lopej, ktorá bude napojená na novovybudovanú ČOV Lopej, zároveň bude dobudovaná v miestnych častiach Skalica a Podbrezová (centrum) s napojením na existujúcu ČOV Skalica, ako aj v časti Štiavnička s napojením na existujúcu ČOV Štiavnička. Celková dĺžka stokovej siete v obci Podbrezová bude 17,772 km. Realizáciou hlavnej aktivity čistiareň odpadových vôd sa zabezpečí vybudovanie ČOV Lopej s kapacitou 800 EO.Celková dĺžka novovybudovaných kanalizačných sietí v projekte dosiahne 11,752 km a zvýšený počet obyvateľov so zlepšeným čistením komunálnych vôd bude 941 EO. (Slovak)
0 references
The aim of the project is to improve the collection and treatment of urban waste water in the Podbrezová agglomeration, in the district of Brezno, which is included in Annex 7 ‘Calls’ and is not in line with the requirements of Council Directive 91/271/EEC. Sewage sewerage and sewage treatment plant will be dealt with in the agglomeration. Incomplete sewerage network and insufficient treatment of waste water threatens surface and groundwater in the river basin Hron, threatens the quality of the environment and the living conditions of the population. The aim of the project will be ensured through 2 main activities of the project:a) sewerage network ab) sewage treatment plant.In the village Podbrezová sewerage system is partially built. Since the municipality consists of several parts, forming separate units and spreading in a fairly fragmented area, it is not possible to sewer it as a whole. As part of the main activity sewer network will be built sewage system in the part of Lopej, which will be connected to the newly built Lopej WWTP, at the same time will be completed in the local parts of Skalica and Podbrezová (centrum) with connection to the existing Skalica WWTP, as well as in the part Štiavnička with connection to the existing wastewater treatment plant Štiavnička. The total length of the sewer network in the village Podbrezová will be 17,772 km. The implementation of the main activity of the sewage treatment plant will ensure the construction of the Lopej WWTP with a capacity of 800 EO.The total length of the newly built sewerage networks in the project will reach 11.752 km and the increased population with improved urban water treatment will be 941 EO. (English)
28 September 2021
0 references
Identifiers
310011A074
0 references