Reduction of energy intensity of the building Pova ská Bystrica (Q3100622): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Property / beneficiary name (string)
Mesto Považská Bystrica
 
Property / beneficiary name (string): Mesto Považská Bystrica / rank
Normal rank
 
Property / summary
Predkladaný projekt rieši modernizáciu a energetickú optimalizáciu verejnej budovy - mestského úradu v Považskej Bystrici. Celý objekt je vo vlastníctve samosprávy mesta Považská Bystrica a slúži výlučne na výkon jej samosprávnych funkcií. V súčasnosti je budova mestského úradu v nevyhovujúcom technickom stave, jeho estetická hodnota je negatívna a prevádzka finančne náročná. Ciežom projektu je preto dosiahnutie nižšej energetickej náročnosti tejto budovy a tiež jej modernizácia. Tento ciež projektu bude naplnený realizovaním jednej hlavnej aktivity projektu a dvoch podporných aktivít. Vďaka implementácii projektu bude vlastník a prevádzkovatež budovy, mesto Považská Bystrica, poučený o tom, ako sledova, mera a vies evidenciu o spotrebe energie budovy a čo zo zistených údajov vyplýva, pričom z tohto opatrenia nevzniknú mestu Považská Bystrica žiadne náklady. V rámci projektu však budú realizované investične náročné opatrenia, na ktorých uskutočnenie by inak mesto nemalo dostatok vlastných zdrojov – modernizácia osvetlenia, tepelné zaizolovanie obvodového pl᚝a, strechy, výmena okien a dverí na budove. Realizáciou projektu budú naplnené povinné meratežné ukazovatele projektu a výsledky – tým hlavným bude dosiahnutie úspory vo výške 58,9 %. (Slovak)
 
Property / summary: Predkladaný projekt rieši modernizáciu a energetickú optimalizáciu verejnej budovy - mestského úradu v Považskej Bystrici. Celý objekt je vo vlastníctve samosprávy mesta Považská Bystrica a slúži výlučne na výkon jej samosprávnych funkcií. V súčasnosti je budova mestského úradu v nevyhovujúcom technickom stave, jeho estetická hodnota je negatívna a prevádzka finančne náročná. Ciežom projektu je preto dosiahnutie nižšej energetickej náročnosti tejto budovy a tiež jej modernizácia. Tento ciež projektu bude naplnený realizovaním jednej hlavnej aktivity projektu a dvoch podporných aktivít. Vďaka implementácii projektu bude vlastník a prevádzkovatež budovy, mesto Považská Bystrica, poučený o tom, ako sledova, mera a vies evidenciu o spotrebe energie budovy a čo zo zistených údajov vyplýva, pričom z tohto opatrenia nevzniknú mestu Považská Bystrica žiadne náklady. V rámci projektu však budú realizované investične náročné opatrenia, na ktorých uskutočnenie by inak mesto nemalo dostatok vlastných zdrojov – modernizácia osvetlenia, tepelné zaizolovanie obvodového pl᚝a, strechy, výmena okien a dverí na budove. Realizáciou projektu budú naplnené povinné meratežné ukazovatele projektu a výsledky – tým hlavným bude dosiahnutie úspory vo výške 58,9 %. (Slovak) / rank
Normal rank
 
Property / summary
Presented project riei modernisation and energy optimisation of public building – municipal office in Povaska Bystrica. The entire building is owned by the municipality of Povaská Bystrica and serves exclusively for the performance of its self-governing functions. Currently, the building of the city office is in poor technical condition, its aesthetic value is negative and the operation is costly. The aim of the project is therefore not to achieve the energy intensity of this building and its modernisation. This objective of the project will be fulfilled by implementing one main project activity and two supporting activities. Thanks to the implementation of the project, the owner and operator of the building, the town of Povaská Bystrica, will be instructed on how to monitor, measure and record the energy consumption of the building and what is apparent from the observed data, and this measure will not incur any costs for the city of Povaská Bystrica. As part of the project, investment-intensive measures will be implemented, for which the city would otherwise not have sufficient own resources to modernise lighting, thermal insulation of the perimeter beach, roof, replacement of windows and doors on the building. The implementation of the project will fulfil the mandatory measurement indicators of the project and the results will thus be the main one to achieve savings of 58.9 %. (English)
 
Property / summary: Presented project riei modernisation and energy optimisation of public building – municipal office in Povaska Bystrica. The entire building is owned by the municipality of Povaská Bystrica and serves exclusively for the performance of its self-governing functions. Currently, the building of the city office is in poor technical condition, its aesthetic value is negative and the operation is costly. The aim of the project is therefore not to achieve the energy intensity of this building and its modernisation. This objective of the project will be fulfilled by implementing one main project activity and two supporting activities. Thanks to the implementation of the project, the owner and operator of the building, the town of Povaská Bystrica, will be instructed on how to monitor, measure and record the energy consumption of the building and what is apparent from the observed data, and this measure will not incur any costs for the city of Povaská Bystrica. As part of the project, investment-intensive measures will be implemented, for which the city would otherwise not have sufficient own resources to modernise lighting, thermal insulation of the perimeter beach, roof, replacement of windows and doors on the building. The implementation of the project will fulfil the mandatory measurement indicators of the project and the results will thus be the main one to achieve savings of 58.9 %. (English) / rank
Normal rank
 
Property / summary: Presented project riei modernisation and energy optimisation of public building – municipal office in Povaska Bystrica. The entire building is owned by the municipality of Povaská Bystrica and serves exclusively for the performance of its self-governing functions. Currently, the building of the city office is in poor technical condition, its aesthetic value is negative and the operation is costly. The aim of the project is therefore not to achieve the energy intensity of this building and its modernisation. This objective of the project will be fulfilled by implementing one main project activity and two supporting activities. Thanks to the implementation of the project, the owner and operator of the building, the town of Povaská Bystrica, will be instructed on how to monitor, measure and record the energy consumption of the building and what is apparent from the observed data, and this measure will not incur any costs for the city of Povaská Bystrica. As part of the project, investment-intensive measures will be implemented, for which the city would otherwise not have sufficient own resources to modernise lighting, thermal insulation of the perimeter beach, roof, replacement of windows and doors on the building. The implementation of the project will fulfil the mandatory measurement indicators of the project and the results will thus be the main one to achieve savings of 58.9 %. (English) / qualifier
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 13:47, 24 September 2021

Project Q3100622 in Slovakia
Language Label Description Also known as
English
Reduction of energy intensity of the building Pova ská Bystrica
Project Q3100622 in Slovakia

    Statements

    0 references
    587,290.14 Euro
    0 references
    690,929.58 Euro
    0 references
    0.85 percent
    0 references
    1 September 2016
    0 references
    1 February 2019
    0 references
    Q3120055 (Deleted Item)
    0 references

    49°7'0.91"N, 18°26'53.34"E
    0 references

    Identifiers

    310041A192
    0 references