Chancellery/Pedrógão Sanitation Subsystem (Q2982013): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 3,625,539.12 euro)
Property / budget
3,625,539.12 Euro
Amount3,625,539.12 Euro
UnitEuro
 
Property / budget: 3,625,539.12 Euro / rank
Normal rank
 

Revision as of 19:15, 21 October 2021

Project Q2982013 in Portugal
Language Label Description Also known as
English
Chancellery/Pedrógão Sanitation Subsystem
Project Q2982013 in Portugal

    Statements

    0 references
    1 January 2016
    0 references
    31 December 2021
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references
    0 references

    39°28'46.63"N, 8°32'22.38"W
    0 references
    A presente operação prevê a construção de uma ETAR e respetivas infraestruturas de ligação com as redes já existentes e sem tratamento no subsistema, assim como a construção/ampliação de redes para aumentar a cobertura, garantindo um adequado tratamento dos efluentes recolhidos e contribuindo para a melhoria da qualidade das massas de água. (Portuguese)
    0 references
    This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies. (English)
    9 July 2021
    0 references
    Torres Novas
    0 references

    Identifiers

    POSEUR-03-2012-FC-000034
    0 references