Q3095589 (Q3095589): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The overall objective of the project is to improve infrastructure in the water sector for the benefit of the environment and people. The proposed investments also ensure compliance with the water supply systems/agglomerations included in the project with the requirements of European Directives D98/83/EC for water supply and D91/271/EEC for wastewater discharges. Through the project, the following indicators set out in the LIOP will be reached by...) |
||||||||||||||
Property / summary | |||||||||||||||
The overall objective of the project is to improve infrastructure in the water sector for the benefit of the environment and people. The proposed investments also ensure compliance with the water supply systems/agglomerations included in the project with the requirements of European Directives D98/83/EC for water supply and D91/271/EEC for wastewater discharges. Through the project, the following indicators set out in the LIOP will be reached by 2021: CO18 = 66.458 inhabitants CO19 = 57,438 equivalent inhabitants. Through these indicators, the project will contribute to achieving LIOP results, OS 3.2, as well as to compliance with European directives, as follows: The degree of connection to the water supply system in Vrancea is 81 % – 192.193 inhabitants (of which 65 % – 154.889 inhabitants, according to continuous supply to the quality parameters of the treated water). 2S33 – After investments in LIOP, the degree of connection and compliance will increase to 93 % – 221,347 inhabitants, respectively 66,458 inhabitants will be supplied with drinking water at the end of the project, respectively 0.83 % of the inhabitants requiring water supply at the level of Romania (8,018,086 inhabitants) and 0.35 % of the total inhabitants in Romania (19.175.019 inhabitants). The level of compliant connection of biodegradable organic load (in l.e.) to systems for collecting l.e. in agglomerations in the project coverage area is 50 % (119.475 l.e.). 2S31 – The degree of connection of biodegradable organic load to collection systems in agglomerations with more than 10000 l.e. will increase from 85 % (111.830 l.e.) in 2016, to 100 %, after completion of the project, reaching 130.812 p.e. 2S32 – The degree of connection of biodegradable organic load to collection systems in agglomerations by 2000-10000 l.e. will increase from 7 % in 2016 (7.645 l.e.), at 42 % after the completion of the project, reaching 46.101 p.e. 2S29 – investments were foreseen to achieve 2 compliant SEAUs, serving agglomerations with more than 10,000 l.e. (out of the 5 agglomerations in the project coverage area) 2S30 – investments were foreseen to achieve 1 compliant SEAU, serving 13 agglomerations (out of 24 agglomerations at project coverage level) with between 2000-10000 l.e. The number of inhabitants/l.e. whose waste water will be transported and purged after project completion, it will be 160.113/176.913 l.e., a total of approx. 0.87 % of total e.g. in Romania (20325520 l.e.) and a total of approx. 1.66 % of the litre still required to be connected to centralised waste water systems in Romania (10630137 l.e). For waste water, the compliant rates for agglomerations are verified and reported annually by the National Administration of “Romanian Waters”, while the connection rate to the centralised water system is reported by the National Institute of Statistics and the water quality (English) | |||||||||||||||
Property / summary: The overall objective of the project is to improve infrastructure in the water sector for the benefit of the environment and people. The proposed investments also ensure compliance with the water supply systems/agglomerations included in the project with the requirements of European Directives D98/83/EC for water supply and D91/271/EEC for wastewater discharges. Through the project, the following indicators set out in the LIOP will be reached by 2021: CO18 = 66.458 inhabitants CO19 = 57,438 equivalent inhabitants. Through these indicators, the project will contribute to achieving LIOP results, OS 3.2, as well as to compliance with European directives, as follows: The degree of connection to the water supply system in Vrancea is 81 % – 192.193 inhabitants (of which 65 % – 154.889 inhabitants, according to continuous supply to the quality parameters of the treated water). 2S33 – After investments in LIOP, the degree of connection and compliance will increase to 93 % – 221,347 inhabitants, respectively 66,458 inhabitants will be supplied with drinking water at the end of the project, respectively 0.83 % of the inhabitants requiring water supply at the level of Romania (8,018,086 inhabitants) and 0.35 % of the total inhabitants in Romania (19.175.019 inhabitants). The level of compliant connection of biodegradable organic load (in l.e.) to systems for collecting l.e. in agglomerations in the project coverage area is 50 % (119.475 l.e.). 2S31 – The degree of connection of biodegradable organic load to collection systems in agglomerations with more than 10000 l.e. will increase from 85 % (111.830 l.e.) in 2016, to 100 %, after completion of the project, reaching 130.812 p.e. 2S32 – The degree of connection of biodegradable organic load to collection systems in agglomerations by 2000-10000 l.e. will increase from 7 % in 2016 (7.645 l.e.), at 42 % after the completion of the project, reaching 46.101 p.e. 2S29 – investments were foreseen to achieve 2 compliant SEAUs, serving agglomerations with more than 10,000 l.e. (out of the 5 agglomerations in the project coverage area) 2S30 – investments were foreseen to achieve 1 compliant SEAU, serving 13 agglomerations (out of 24 agglomerations at project coverage level) with between 2000-10000 l.e. The number of inhabitants/l.e. whose waste water will be transported and purged after project completion, it will be 160.113/176.913 l.e., a total of approx. 0.87 % of total e.g. in Romania (20325520 l.e.) and a total of approx. 1.66 % of the litre still required to be connected to centralised waste water systems in Romania (10630137 l.e). For waste water, the compliant rates for agglomerations are verified and reported annually by the National Administration of “Romanian Waters”, while the connection rate to the centralised water system is reported by the National Institute of Statistics and the water quality (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The overall objective of the project is to improve infrastructure in the water sector for the benefit of the environment and people. The proposed investments also ensure compliance with the water supply systems/agglomerations included in the project with the requirements of European Directives D98/83/EC for water supply and D91/271/EEC for wastewater discharges. Through the project, the following indicators set out in the LIOP will be reached by 2021: CO18 = 66.458 inhabitants CO19 = 57,438 equivalent inhabitants. Through these indicators, the project will contribute to achieving LIOP results, OS 3.2, as well as to compliance with European directives, as follows: The degree of connection to the water supply system in Vrancea is 81 % – 192.193 inhabitants (of which 65 % – 154.889 inhabitants, according to continuous supply to the quality parameters of the treated water). 2S33 – After investments in LIOP, the degree of connection and compliance will increase to 93 % – 221,347 inhabitants, respectively 66,458 inhabitants will be supplied with drinking water at the end of the project, respectively 0.83 % of the inhabitants requiring water supply at the level of Romania (8,018,086 inhabitants) and 0.35 % of the total inhabitants in Romania (19.175.019 inhabitants). The level of compliant connection of biodegradable organic load (in l.e.) to systems for collecting l.e. in agglomerations in the project coverage area is 50 % (119.475 l.e.). 2S31 – The degree of connection of biodegradable organic load to collection systems in agglomerations with more than 10000 l.e. will increase from 85 % (111.830 l.e.) in 2016, to 100 %, after completion of the project, reaching 130.812 p.e. 2S32 – The degree of connection of biodegradable organic load to collection systems in agglomerations by 2000-10000 l.e. will increase from 7 % in 2016 (7.645 l.e.), at 42 % after the completion of the project, reaching 46.101 p.e. 2S29 – investments were foreseen to achieve 2 compliant SEAUs, serving agglomerations with more than 10,000 l.e. (out of the 5 agglomerations in the project coverage area) 2S30 – investments were foreseen to achieve 1 compliant SEAU, serving 13 agglomerations (out of 24 agglomerations at project coverage level) with between 2000-10000 l.e. The number of inhabitants/l.e. whose waste water will be transported and purged after project completion, it will be 160.113/176.913 l.e., a total of approx. 0.87 % of total e.g. in Romania (20325520 l.e.) and a total of approx. 1.66 % of the litre still required to be connected to centralised waste water systems in Romania (10630137 l.e). For waste water, the compliant rates for agglomerations are verified and reported annually by the National Administration of “Romanian Waters”, while the connection rate to the centralised water system is reported by the National Institute of Statistics and the water quality (English) / qualifier | |||||||||||||||
point in time: 14 September 2021
|
Revision as of 15:39, 14 September 2021
Project Q3095589 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3095589 in Romania |
Statements
800,346,459.5 Romanian Leu
0 references
941,584,070.0 Romanian Leu
0 references
0.85 percent
0 references
1 January 2018
0 references
31 December 2022
0 references
COMPANIA DE UTILITATI PUBLICE SA
0 references
Obiectivul general al proiectului este reprezentat de îmbunătățirea infrastructurii din sectorul de apă în beneficiul mediului și al oamenilor. De asemenea prin investițiile propuse se asigură conformarea sistemelor de alimentare cu apă/aglomerarilor incluse in proiect cu cerintele Directivelor Europene D98/83/CE pentru alimentarea cu apa si D91/271/EEC pentru descarcarile de apa uzata. Prin intermediul proiectului, urmatorii indicatori prevazuti in POIM vor fi atinsi pana in 2021: CO18 = 66.458 locuitori CO19 = 57.438 locuitori echivalenti Prin acesti indicatori, proiectul va contribui la atingerea la rezultatele POIM, OS 3.2, precum si la conformarea cu directivele europene, astfel: Gradul de conectare la sistemul de alimentare cu apa in Vrancea este de 81% - 192.193 locuitori (din care 65% - 154.889 locuitori, conformi din punct de vedere al furnizarii continue la parametrii de calitate ai apei tratate). 2S33 - Dupa investitiile din POIM, gradul de conectare si conformare va creste la 93% - 221.347 locuitori, respectiv 66.458 locuitori vor fi alimentati suplimentar cu apa potabila la finalul proiectului, respectiv 0,83 % din locuitorii care necesita alimentare cu apa la nivelul Romaniei (8.018.086 locuitori) și 0,35% din totalul de locuitori de la nivelul României (19.175.019 locuitori). Nivelul de conectare conforma a incarcarii organice biodegradabile (în l.e.) la sisteme de colectare a l.e. in aglomerarile din aria de acoperire a proiectului este de 50% (119.475 l.e). 2S31 – Gradul de conectare a incarcarii organica biodegradabile la sistemele de colectare in aglomerari cu peste 10000 l.e va creste de la 85% (111.830 l.e.) in 2016, la 100%, dupa finalizarea proiectului, atingand 130.812 p.e 2S32 - Gradul de conectare a incarcarii organica biodegradabile la sistemele de colectare in aglomerari cu 2000 -10000 l.e va creste de la 7% in 2016 (7.645 l.e.), la 42% dupa finalizarea proiectului, atingand 46.101 p.e 2S29 – au fost prevazute investitii pentru realizarea 2 SEAU conforme, care deservesc aglomerari cu peste 10.000 l.e (din cele 5 aglomerari la nivelul ariei de acoperire a proiectului) 2S30 – au fost prevazute investitii pentru realizarea a 1 SEAU conforma, care deserveste 13 aglomerari (din 24 aglomerari la nivelul ariei de acoperire a proiectului) cu între 2000 - 10000 l.e. Numarul locuitori/l.e. a caror apa uzata va fi transportata si epurata dupa finalizarea proiectului, va fi de 160.113 /176.913 l.e., respectiv un total de aprox. 0,87% din totalul de l.e. de la nivelul Romaniei (20.325.520 l.e.) si un total de aprox. 1,66 % din l.e. care mai necesita a fi conectată la sisteme centralizate de apă uzată la nivelul României (10.630.137 l.e). Pentru ape uzate, ratele conforme pentru aglomerari sunt verificate si raportate anual de catre Administratia Nationala a „Apelor Romane”, in timp ce rata de conectare la sistemul centralziat de apa este raportat de catre Institutul National de Statistica, iar calitatea ap (Romanian)
0 references
The overall objective of the project is to improve infrastructure in the water sector for the benefit of the environment and people. The proposed investments also ensure compliance with the water supply systems/agglomerations included in the project with the requirements of European Directives D98/83/EC for water supply and D91/271/EEC for wastewater discharges. Through the project, the following indicators set out in the LIOP will be reached by 2021: CO18 = 66.458 inhabitants CO19 = 57,438 equivalent inhabitants. Through these indicators, the project will contribute to achieving LIOP results, OS 3.2, as well as to compliance with European directives, as follows: The degree of connection to the water supply system in Vrancea is 81 % – 192.193 inhabitants (of which 65 % – 154.889 inhabitants, according to continuous supply to the quality parameters of the treated water). 2S33 – After investments in LIOP, the degree of connection and compliance will increase to 93 % – 221,347 inhabitants, respectively 66,458 inhabitants will be supplied with drinking water at the end of the project, respectively 0.83 % of the inhabitants requiring water supply at the level of Romania (8,018,086 inhabitants) and 0.35 % of the total inhabitants in Romania (19.175.019 inhabitants). The level of compliant connection of biodegradable organic load (in l.e.) to systems for collecting l.e. in agglomerations in the project coverage area is 50 % (119.475 l.e.). 2S31 – The degree of connection of biodegradable organic load to collection systems in agglomerations with more than 10000 l.e. will increase from 85 % (111.830 l.e.) in 2016, to 100 %, after completion of the project, reaching 130.812 p.e. 2S32 – The degree of connection of biodegradable organic load to collection systems in agglomerations by 2000-10000 l.e. will increase from 7 % in 2016 (7.645 l.e.), at 42 % after the completion of the project, reaching 46.101 p.e. 2S29 – investments were foreseen to achieve 2 compliant SEAUs, serving agglomerations with more than 10,000 l.e. (out of the 5 agglomerations in the project coverage area) 2S30 – investments were foreseen to achieve 1 compliant SEAU, serving 13 agglomerations (out of 24 agglomerations at project coverage level) with between 2000-10000 l.e. The number of inhabitants/l.e. whose waste water will be transported and purged after project completion, it will be 160.113/176.913 l.e., a total of approx. 0.87 % of total e.g. in Romania (20325520 l.e.) and a total of approx. 1.66 % of the litre still required to be connected to centralised waste water systems in Romania (10630137 l.e). For waste water, the compliant rates for agglomerations are verified and reported annually by the National Administration of “Romanian Waters”, while the connection rate to the centralised water system is reported by the National Institute of Statistics and the water quality (English)
14 September 2021
0 references
Judeţul Vrancea, Romania
0 references
Ciorăşti, Romania
0 references
Vârteşcoiu, Romania
0 references
Vânători, Romania
0 references
Vulturu, Romania
0 references
Urecheşti, Romania
0 references
Tătăranu, Romania
0 references
Tâmboeşti, Romania
0 references
Tulnici, Romania
0 references
Suraia, Romania
0 references
Străoane, Romania
0 references
Soveja, Romania
0 references
Slobozia Bradului, Romania
0 references
Sihlea, Romania
0 references
Răstoaca, Romania
0 references
Rugineşti, Romania
0 references
Popeşti, Romania
0 references
Oraş Panciu, Romania
0 references
Oraş Odobeşti, Romania
0 references
Oraş Mărăşeşti, Romania
0 references
Obrejiţa, Romania
0 references
Năneşti, Romania
0 references
Măicăneşti, Romania
0 references
Municipiul Focşani, Romania
0 references
Municipiul Adjud, Romania
0 references
Milcovul, Romania
0 references
Jariştea, Romania
0 references
Homocea, Romania
0 references
Gugeşti, Romania
0 references
Gologanu, Romania
0 references
Goleşti, Romania
0 references
Dumbrăveni, Romania
0 references
Cârligele, Romania
0 references
Câmpineanca, Romania
0 references
Coteşti, Romania
0 references
Broşteni, Romania
0 references
Bordeşti, Romania
0 references
Boloteşti, Romania
0 references
Bilieşti, Romania
0 references
Identifiers
110838
0 references