Construction of road connecting section from Maskavas street to railway, access to industrial territories (Q3057476): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: co-financing rate (P837): 0.66 percent)
Property / co-financing rate
0.66 percent
Amount0.66 percent
Unitpercent
 
Property / co-financing rate: 0.66 percent / rank
Normal rank
 

Revision as of 10:16, 27 September 2021

Project Q3057476 in Latvia
Language Label Description Also known as
English
Construction of road connecting section from Maskavas street to railway, access to industrial territories
Project Q3057476 in Latvia

    Statements

    0 references
    0 references
    818,897.0 Euro
    0 references
    1,238,428.63 Euro
    0 references
    1 July 2020
    0 references
    30 September 2021
    0 references
    RĒZEKNES PILSĒTAS DOME
    0 references
    0 references

    56°30'22.61"N, 27°19'50.38"E
    0 references
    Projekta mērķis ir ceļa savienojošā posma pārbūve no Maskavas ielas līdz dzelzceļam, reģenerējot degradētās teritorijas, atbilstoši pašvaldības attīstības programmai, nodrošinot videi draudzīgu un vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu. Galvenās darbības mērķa realizācijai ir ceļa savienojošā posma pārbūve, veicot asfaltbetona ceļa seguma pārbūvi un pazemes inženierkomunikāciju izbūvi vai pārbūvi, proti, tiks izbūvēts jauns ielas apgaismojums, jauna lietus kanalizācijas sistēma, jauns maģistrālais ūdensvads un sadzīves kanalizācijas tīkli t.sk., sūkņu stacija. Tiks pārbūvēti esošie AS "Sadales tīkls" elektrotīkli (iznesti ārpus ceļa braucamās daļas, nemainot tehniskos parametrus) un SIA "TET" optiskie tīkli (gaisvadu līnija tiks demontēta un izbūvēts pazemes kabelis). Ceļa posma pārbūvējamais garums - 760m. Projekta plānoto darbību rezultātā tiks izveidotas vismaz 20 jaunas darbavietas, piesaistītas nefinanšu investīcijas vismaz 818 897 EUR apmērā, degradētās teritorijas platība tiks samazināta par 0.78 ha.Projekta kopējie izdevumi ir 1 395 173,83 EUR, no tiem kopējie attiecināmie izdevumi 1 238 428,63 EUR. Atbalsta summa: 100 % no attiecināmajiem izdevumiem, nepārsniedzot 1 238 428,63 EUR, no tās: Eiropas Reģionālā attīstības fonda finansējums: 66,12% apmērā no attiecināmajiem izdevumiem, nepārsniedzot 818 897,00 EUR, Valsts budžeta dotācija pašvaldībām: 3,50 % no attiecināmajiem izdevumiem, nepārsniedzot 43 353,37 EURPašvaldības finansējums: 30,38 % no attiecināmajiem izdevumiem, nepārsniedzot 376 178,26 EURProjekta kopējie neattiecināmie izdevumi: 156 745,20 EUR, ko finansēs pašvaldība. Projektu ir paredzēts uzsākt 2020.gada 3.ceturksnī un īstenot līdz 2021.gada 3.ceturkšņa beigām. (Latvian)
    0 references
    The aim of the project is reconstruction of the road connecting section from Maskavas street to railway, regenerating degraded areas in accordance with the municipal development programme, ensuring environmentally friendly and environmentally sustainable territorial growth and job creation. The main action to achieve the goal is reconstruction of the road connecting section by rebuilding of asphalt concrete road surface and construction or reconstruction of underground engineering communications, i.e. a new street lighting, a new rain sewer system, a new main water pipe and household sewerage networks, including a pump station, will be constructed. The existing “Sadales tīkls” AS electricity networks (businesses outside the roadway part without changing technical parameters) and TET LLC optical networks will be rebuilt (the airline will be dismantled and built underground cable). Rebuildable length of road section – 760 m. The planned activities of the project will result in at least 20 new jobs, attracted non-financial investments of at least EUR 818897, the area of degraded area will be reduced by 0.78 ha. Total expenditure of the project is EUR 1395173,83, of which total eligible expenditure EUR 1238428,63. 100 % of the eligible expenditure up to a maximum of EUR 1238428,63 of which: Funding from the European Regional Development Fund: 66,12 % of eligible expenditure, not exceeding EUR 818897,00, State budget grant to municipalities: 3,50 % of eligible expenditure up to a maximum of EUR 43 353,37 Local Government funding: 30,38 % of eligible expenditure up to a maximum of EUR 376 178,26 Total ineligible expenditure of the project: EUR 156745,20 to be financed by the municipality. The project is planned to start in the 3rd quarter of 2020 and to be implemented by the end of the 3rd quarter of 2021. (English)
    15 July 2021
    0 references
    Rēzekne
    0 references
    Rēzekne
    0 references
    Rēzekne
    0 references

    Identifiers

    5.6.2.0/20/I/001
    0 references