Q3072557 (Q3072557): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): The planned construction of a 4 km street light cycling and footpath (hereinafter referred to as the ‘light road’) will improve the connection between the villages of Peri region (Peri, Meemaste, Metste, Rosma) and the municipality centre – the town of Põlva. The light traffic road will run in parallel with Võru – Põlva national road and will help to ensure road safety and connect to the existing network of roads in Põlva, which in turn will hel...)
Property / summary
 
The planned construction of a 4 km street light cycling and footpath (hereinafter referred to as the ‘light road’) will improve the connection between the villages of Peri region (Peri, Meemaste, Metste, Rosma) and the municipality centre – the town of Põlva. The light traffic road will run in parallel with Võru – Põlva national road and will help to ensure road safety and connect to the existing network of roads in Põlva, which in turn will help to solve and ensure better access to jobs and public services for the population. (English)
Property / summary: The planned construction of a 4 km street light cycling and footpath (hereinafter referred to as the ‘light road’) will improve the connection between the villages of Peri region (Peri, Meemaste, Metste, Rosma) and the municipality centre – the town of Põlva. The light traffic road will run in parallel with Võru – Põlva national road and will help to ensure road safety and connect to the existing network of roads in Põlva, which in turn will help to solve and ensure better access to jobs and public services for the population. (English) / rank
 
Normal rank
Property / summary: The planned construction of a 4 km street light cycling and footpath (hereinafter referred to as the ‘light road’) will improve the connection between the villages of Peri region (Peri, Meemaste, Metste, Rosma) and the municipality centre – the town of Põlva. The light traffic road will run in parallel with Võru – Põlva national road and will help to ensure road safety and connect to the existing network of roads in Põlva, which in turn will help to solve and ensure better access to jobs and public services for the population. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:41, 16 August 2021

Project Q3072557 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3072557 in Estonia

    Statements

    0 references
    679,482.83 Euro
    0 references
    799,391.57 Euro
    0 references
    85.0 percent
    0 references
    1 June 2018
    0 references
    31 July 2021
    0 references
    Põlva Vallavalitsus
    0 references

    58°3'42.95"N, 27°4'15.17"E
    0 references
    63308
    0 references
    Planeeritav 4 kilomeetri pikkuse tänavavalgustusega jalgratta- ja jalgtee (edaspidi kergliiklustee) rajamine parandab ühendust Peri piirkonna külade (Peri, Meemaste, Metste, Rosma) ja vallakeskuse - Põlva linna vahel. Kergliiklustee hakkab kulgema Võru - Põlva riigimaanteega paralleelselt ja aitab tagada liiklusohutust ning ühendub Põlva linna olemasoleva kergliiklusteede võrgustikuga, mis omakorda aitab lahendada ja tagada elanikkonnale töökohtade ja avalike teenuste parema kättesaadavuse. (Estonian)
    0 references
    The planned construction of a 4 km street light cycling and footpath (hereinafter referred to as the ‘light road’) will improve the connection between the villages of Peri region (Peri, Meemaste, Metste, Rosma) and the municipality centre – the town of Põlva. The light traffic road will run in parallel with Võru – Põlva national road and will help to ensure road safety and connect to the existing network of roads in Põlva, which in turn will help to solve and ensure better access to jobs and public services for the population. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.5.04.18-0338
    0 references